Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 104 of 140  Not logged in ELOG logo
ID Datedown Author Category Type Module Target/Number Subject
  736   Wednesday, September 03, 2014, 13:55 Travis CaveSouth Hot-CellStandard OperationTM1Ta#43module move

TM#1 with Ta#43 has been moved from the ITW to the south hot cell.

  735   Wednesday, September 03, 2014, 10:50 David WangITWStandard OperationTM1  TM1 has been disconnected in ITW.

  TM1 has been disconnected in ITW.

  734   Wednesday, August 20, 2014, 10:25 David WangITEStandard OperationTM4 5 Shielding blocks have been transferred from ITW to ITE.

5 Shielding blocks have been transferred from ITW to ITE. ITE  is configured to take proton beam.
 

  733   Wednesday, August 13, 2014, 12:21 David WangITERepairTM4UCx10ITE TP4S is replaced

ITE TP4S was broken down last night . I stopped the ITE pumps and vented station with Argon this morning. Edi and I replaced the broken pump with a new pump. The ITE is under roughing now.

  732   Monday, August 11, 2014, 14:30 David WangITEStandard OperationTM4UCx #10TM4 is connected in ITE.

TM4 is connected in ITE. All ITE  turbo pumps are started. I will check the pumping down process tomorrow morning. Everything is fine so far.

  731   Monday, August 11, 2014, 14:27 David WangConditioning StationStandard OperationTM4 TM4 are vented with argon and disconnected at CS.

TM4 are vented with argon and disconnected at CS this morning.

  730   Monday, August 11, 2014, 10:38 Travis CaveSouth Hot-CellStandard OperationTM4UC#10Electrical check

Electrical check of TM#4 with UC#10 from thursday.

Attachment 1: TM4_UC10_elec_chk_shc.PDF
TM4_UC10_elec_chk_shc.PDF
  729   Monday, August 11, 2014, 10:34 Travis CaveConditioning StationStandard OperationTM4UC#10module move

TM#4 with UC#10 has been moved from the conditioning station to the east target station.

  728   Friday, August 08, 2014, 08:47 David WangConditioning StationStandard OperationTM4UCx #10helium pressure test on TM4 HS water line at CS.

Helium pressure test on TM4 HS water line at CS is finished. 80psi helium no leak. 

Attachment 1: 015.JPG
015.JPG
Attachment 2: 012.JPG
012.JPG
Attachment 3: 016.JPG
016.JPG
Attachment 4: 014.JPG
014.JPG
  727   Thursday, August 07, 2014, 17:07 David WangConditioning StationStandard OperationTM4UCx #10TM4 is connected in CS.

TM4 is connected at CS. All turbo pumps are started. The pumping down is good so far.

  726   Thursday, August 07, 2014, 13:58 David WangSouth Hot-CellStandard OperationTM4UCx #10Leak check on TM4 HS water line with new UCX target.

Isaac and I leak checked TM4 HS line with new UCX target. The leak detector base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4torr. Isaac sprayed helium  on both VCR connections(5 seconds each) and flushed helium around the target for 6 seconds. No response on leak detector.

  725   Thursday, August 07, 2014, 10:45 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule move

TM#4 has been moved from the south west silo to the south hot cell.

  724   Wednesday, August 06, 2014, 11:12 Travis CaveSouth Hot-CellStandard Operation SiC#30Spent target move

SiC#30 in pail #117 has been move to the spent target vault and placed in spot 2C. See attached PDF for details.

Attachment 1: Vault_Storage_August_6_2014.pdf
Vault_Storage_August_6_2014.pdf Vault_Storage_August_6_2014.pdf Vault_Storage_August_6_2014.pdf Vault_Storage_August_6_2014.pdf
  723   Wednesday, August 06, 2014, 11:11 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule move

TM#3 with no target has been moved to the northwest silo for storage.

  722   Tuesday, August 05, 2014, 11:53 David WangITERepair  Reconnected ITE entrance module

ITE entrance module is reconnected in ITE.

  721   Tuesday, August 05, 2014, 10:40 Travis CaveITEStandard Operation  module move

ITE Entrance module has been moved back to the east station.

  720   Thursday, July 31, 2014, 08:08 chad fisherSouth Hot-CellStandard OperationTM3SiC#30SiC#30 Removed and inpect

SiC#30 has been removed from TM3. A quick exam of TM3 source tray did not  yield any obvious signs of damage.

9 pin connector on the target showed the usual sparking/arcing marks.

Heat shield has been removed from the target. Inside of heat shield has some unusual marks on it and quite a lot of black deposits.

 

Attachment 1: TM320140731_01.jpg
TM320140731_01.jpg
Attachment 2: TM320140731_02.jpg
TM320140731_02.jpg
Attachment 3: TM320140731_03.jpg
TM320140731_03.jpg
Attachment 4: TM320140731_04.jpg
TM320140731_04.jpg
  719   Wednesday, July 30, 2014, 11:51 Travis CaveConditioning StationMaintenance  entrance module move

ITE Entrance module has been moved from the east station to the conditioning station.

  718   Monday, July 28, 2014, 17:26 Ron KuramotoITWRepair  ITW:IV5 Air leak repair

Air leak was found at the Solenoid control valve located in the Pre-Separator & DB0 room.  The gasket between the solenoid body and its manifold block was broken, see attached photos. The gasket and solenoid body were replaced. Air was turned back on to IV5 (B/L gate valve) with no apparent air leaks. The gate valve was actuated open & closed from the control room seeing both limits successfully.

Repair was done by Dimo Y. who received 0.01 mSv, and assisted by Anthony I. & Ron K. who both received zero dose.
Rad fields measured by RPG were; 1300 uSv/hr above B/L and 350 uSv/hr @ the Solenoid valves at knee height.
 
 

DSCN0087.JPG

 

20140728_142855_-_small.jpg

 

20140728_143202_-_small.jpg

  717   Monday, July 28, 2014, 14:45 David WangConditioning StationDevelopmentTM2 turned off TM2 and CS turbo pumps.

I turned off TM2 and CS turbo-pumps. TM2 will be moved from CS to silo tomorrow morning.

ELOG V2.9.2-2455