  2212   Thursday, April 22, 2021, 08:41 David WangSouth Hot-CellRepairTM4  TM4 steerer electical check at SHC and TH.Using SHC electrical test cables routed
to to TH,  We tested TM4 steerer 
4 polarities. At 100v megga test, left, right
  
  2213   Monday, April 26, 2021, 13:02 David WangSouth Hot-CellRepairTM4 TM4 new steerer cable installation.New steerer cables are installed in TM4.
Cables are properly routed in containment
box and service cap top. After job, TP2 is
  
  2216   Friday, May 14, 2021, 11:29 David WangSpent Target VaultStandard Operation  Repack of 4 spent targets.Repack of 4 spent targets in TH and SHC. 
SiC#37 to new pail249#. SiC#36 to new pail
250#. Nb#8 to new pail 247#, SiC#33 to new
  
  2220   Monday, May 31, 2021, 11:28 David WangITEStandard OperationTM4 Remotely remove TM4 from silo to shcRemotely remove tm4 from silo to shc. The
moving is smooth.
  
  2221   Thursday, June 03, 2021, 08:19 David WangITERepairTM4UCX33Replaced ITE TP4 Replaced  ITE TP4 due to failure start.
The new pump works fine. 
  
  2222   Thursday, June 03, 2021, 08:20 David WangSouth Hot-CellStandard OperationTM2 Remotely remove TM2 from silo to shcRemotely removed Tm2 from silo to SHC.
The moving is smooth. 
  
  2223   Thursday, June 03, 2021, 08:33 David WangSouth Hot-CellStandard OperationTM4UCX32# P2NP2N UCX 32 on TM4 electical check and leak check at SHC.Both electrical check and leak check (HS
and Window lines)results are good.  
See attachments
 P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf 
  2225   Wednesday, June 09, 2021, 10:15 David WangITE/ITWStandard OperationTM4UCX33. ITE water signal interlock check. Annual ITE water signal interlock check
is done.  HS, TAR, TUBE, MSP, EE, COIL
1, containment box window, HVC1, HVC2, 2A
  
  2226   Wednesday, June 09, 2021, 10:48 David WangSouth Hot-CellStandard OperationTM2 TM2 containment box leak check. Chad installed containment box back to
TM2 yesterday. We leak checked VCR joints
on window line.    No leak.
  
  2227   Thursday, June 10, 2021, 14:54 David WangNorth Hot-CellStandard OperationTM2UCX33 UCX 33 on TM2 electical check at NHC.TM2 UCX33# electrical check and leak check
results. See attachment. 
 UCX33_TM2_electrical_check.pdf 
  2228   Friday, June 11, 2021, 10:36 David WangConditioning StationStandard OperationTM2UCX33#TM2 leak check at TCSLeak checked TM2 service cap at TCS. helium
pressure checked containment box window and
HS cooling lines.  No leak on service
  
  2229   Tuesday, June 22, 2021, 15:35 David WangITWStandard OperationTM2UCX33#TM2 has been connected it ITW. TM2 has been connected it ITW.  All
turbo pumps are started. 
  
  2232   Thursday, July 08, 2021, 11:36 David WangConditioning StationStandard OperationTM4Ta#62Remotely remove TM4(Ta#62) from SHC to TCS.Remotely remove TM4 (ta# 62) from SHC to
TCS.  The moving is smooth. 
  
  2233   Thursday, July 08, 2021, 11:45 David WangSouth Hot-CellStandard OperationTM4Ta#62TM4 Ta#62 leak check and lectrical check result at SHC and TCS. At SHC: HS line no leak . electrical check
result is fine. At TCS: helium pressurized
HS line to 70psi, 3 minutes. LD  leak
 Ta#62_Tm4_elecrical_check_and_leak_check_result_at_SHC.pdf 
  2238   Wednesday, August 04, 2021, 17:24 David WangNorth Hot-CellStandard OperationTM2UCx34#UCX 34# on TM2 electical check and HS leak check at NHC.The job is done with Matt at NHC. All TGHT
and TBHT bolts are torque wrench tight in
NHC. HS leak check result is good.
 UCX34_TM2_electrical_check.pdf 
  2256   Wednesday, October 06, 2021, 10:42 David WangITERepair  ITE IG1S cable end connector replacementITE IG1S cable end connector replacement
has been finished by Roy Huang. 
  
  2277   Thursday, November 25, 2021, 10:33 David WangConditioning StationStandard OperationTM4Ta#63. helium pressure test on TM4 HS line at TCS. Helium pressure test on TM4 HS line at
TCS is done.  LD base leak rate 0.0
xE-9 atm.cc/sec. Helium pressure 70psi. HS
  
  2279   Monday, November 29, 2021, 12:16 David WangSpent Target VaultStandard Operation  Five spent targets have been loaded into F308sWe loaded UCx #29 , SiC #38  , Ta#53,
Ta#56 ,and Ta#57 from mini storage 
into F308 flasks.  Later, the flasks
  
  2280   Tuesday, November 30, 2021, 11:03 David WangITEStandard OperationTM4Ta#63.Remotely remove TM4(Ta#63) from TCS to ITE.Remotely remove TM4(Ta#63) from TCS to
ITE. The move is smooth and successful. 
  
  2281   Tuesday, November 30, 2021, 12:51 David WangITEStandard OperationTM4Ta#63.Tm4 has been connected in ITE. TM4 has been connected in ITE. See attachment
for checklist.
 from_my_cellphone_2598_647.jpgfrom_my_cellphone_2598_648.jpgfrom_my_cellphone_2598_649.jpgfrom_my_cellphone_2598_650.jpg 