ID Date Authordown Category Type Module Target/Number Subject
  2194   Thursday, March 04, 2021, 11:20 David WangITWMaintenance  ITW water flow wheels and coils replacement.

ITW water flow wheels and coils are replaced. Wheels and coils on Oven, Tube, HS, EE, MSP, Febiad coil, containment box window, dump,dump plug, 2A window, and tank return circuits are replaced with new parts.

  2195   Thursday, March 04, 2021, 13:54 David WangConditioning StationStandard OperationTM3 TM3 has been moved to NHC from silo

TM3 has been moved from silo to NHC. The move is successful. NHC ram stand and NHC protection railings are checked and installed. Everything works fine.

2021-03-05. TM3 has been moved from NHC to silo. The move is successful.

  2203   Tuesday, March 23, 2021, 09:47 David WangSouth Hot-CellStandard OperationTM3 TM3 has been moved from TCS to SHC.

Frank and I removed Tm3 from TCS to SHC. The move is successful.

  2205   Thursday, March 25, 2021, 10:38 David WangSpent Target VaultStandard Operation C#1Remove pail 237 spent target C#1 from storage vault to mini storage.

Pail 237 only has 200u sv/hr field at 0.5 meter. On contact measurement: 0.9 to 1.6 m sv/hr.and less than 80 count contamination outside the pail.   It is moved to mini storage. We will transfer this pail to cyclotron vault and store it there later.

  2209   Wednesday, April 21, 2021, 10:32 David WangSouth Hot-CellStandard OperationTM3 Remotely remove TM3 from SHC to silo

On 2021-04-19, Frank and I remotely removed Tm3 from SHC to silo . The moving is successful.

  2210   Wednesday, April 21, 2021, 10:34 David WangSouth Hot-CellStandard OperationTM4 Remtely remove TM4 from Silo to SHC.

On 2021- 04-20,  Tm4 is removed from Silo to SHC. The moving is smooth.

  2211   Wednesday, April 21, 2021, 11:18 David WangCoolingMaintenance  Refilling high active wtaer system and starting HA water pumps.

High active water system is refilled. Air are drained out of  system before pump to be started. Following sequence are used to bring the whole system back to operation:

1. close ITE , open ITW. Switch on the pump. Only 2A beam line related 5 water circuits are in loop in ITW.  Switch off pump when system pressure is stable above 100 psi.

2. Close ITW, open ITE. Switch on the pump. Only 2A beam line related 5 water circuits are in loop in ITE. Switch off pump when system pressure is stable above 100psi.

3. Open ITW, Open ITE. Switch on pump. both ITW and ITE beam line related water circuits are in loop.  Switch  off pump when system pressure is stable above 100psi.

4. Close ITE open ITW.  Bring ITW  target module water circuits back to loop by connecting bypass fittings on to circuits. Only bring one circuit back to system at first. Switch on pump. Wait for system pressure stabilized. Then Close ITW. bring next circuit back  to system.  Open ITW .  wait for pressure stabilized.  repeat the process until all water circuit and connected with bypass fittings in ITW.

5. Check possible leak on valves, fittings, and flow sensors in ITW pit.

6. Go to electrical room, check all ITW water signal status.

7. Close ITW, Open ITE. Repeat same procedure as step 4 on ITE target module water circuits.

8. Check possible leak on valves, fittings and flow sensors in ITE pit.

9. Go to electrical room, check all ITE water signal status.

10. Open ITW.  At this stage, full ITE station and half of ITW station water circuits are in operation.  Check possible leak on pumps, valves, fittings, gauges on water station at TH west end.

11. Keep system in operation. Watch on - tank level , system pressure, and conductivity on resin circuit and whole system.

  2212   Thursday, April 22, 2021, 08:41 David WangSouth Hot-CellRepairTM4  TM4 steerer electical check at SHC and TH.

Using SHC electrical test cables routed to to TH,  We tested TM4 steerer  4 polarities. At 100v megga test, left, right , up and down to ground are all OL. TM4 steerer has no short.

  2213   Monday, April 26, 2021, 13:02 David WangSouth Hot-CellRepairTM4 TM4 new steerer cable installation.

New steerer cables are installed in TM4. Cables are properly routed in containment box and service cap top. After job, TP2 is installed back onto module top.

  2216   Friday, May 14, 2021, 11:29 David WangSpent Target VaultStandard Operation  Repack of 4 spent targets.

Repack of 4 spent targets in TH and SHC.  SiC#37 to new pail249#. SiC#36 to new pail 250#. Nb#8 to new pail 247#, SiC#33 to new pail 248#.  They are all in mini storage. Also, UCx 31 are transferred to mini storage.  There are 5 spent targets in mini storage now.  

2021-05-20: 5 spent targets have been loaded into F308's. We transferred two more spent targets into mini storage this morning for next week loading.

  2220   Monday, May 31, 2021, 11:28 David WangITEStandard OperationTM4 Remotely remove TM4 from silo to shc

Remotely remove tm4 from silo to shc. The moving is smooth.

  2221   Thursday, June 03, 2021, 08:19 David WangITERepairTM4UCX33Replaced ITE TP4

Replaced  ITE TP4 due to failure start. The new pump works fine.

  2222   Thursday, June 03, 2021, 08:20 David WangSouth Hot-CellStandard OperationTM2 Remotely remove TM2 from silo to shc

Remotely removed Tm2 from silo to SHC. The moving is smooth.

  2223   Thursday, June 03, 2021, 08:33 David WangSouth Hot-CellStandard OperationTM4UCX32# P2NP2N UCX 32 on TM4 electical check and leak check at SHC.

Both electrical check and leak check (HS and Window lines)results are good.   See attachments

Correction: It should be UCx#32 P2N instead of UCx33# in check list attached . UCx#33 is on TM2 in ITW

Attachment 1: P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf
P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf
  2225   Wednesday, June 09, 2021, 10:15 David WangITE/ITWStandard OperationTM4UCX33. ITE water signal interlock check.

Annual ITE water signal interlock check is done.  HS, TAR, TUBE, MSP, EE, COIL 1, containment box window, HVC1, HVC2, 2A window, 2A  shielding plug, 2A dump, 2A collimator, and 2A tank water signal interlock are checked.   Everything is working properly.  

2021-06-22. Annual ITW water signal interlock check is done,  HS, TAR, MSP,  EE, COIL1 , containment box window, HVC1 , HVC2, 2A window, 2A shielding plug, 2A dump, 2A collimator, and 2A tank water signal interlock are checked. Everything works fine.

  2226   Wednesday, June 09, 2021, 10:48 David WangSouth Hot-CellStandard OperationTM2 TM2 containment box leak check.

Chad installed containment box back to TM2 yesterday. We leak checked VCR joints on window line.    No leak.

  2227   Thursday, June 10, 2021, 14:54 David WangNorth Hot-CellStandard OperationTM2UCX33 UCX 33 on TM2 electical check at NHC.

TM2 UCX33# electrical check and leak check results. See attachment.

Attachment 1: UCX33_TM2_electrical_check.pdf
UCX33_TM2_electrical_check.pdf UCX33_TM2_electrical_check.pdf
  2228   Friday, June 11, 2021, 10:36 David WangConditioning StationStandard OperationTM2UCX33#TM2 leak check at TCS

Leak checked TM2 service cap at TCS. helium pressure checked containment box window and HS cooling lines.  No leak on service cap and waterlines.

  2229   Tuesday, June 22, 2021, 15:35 David WangITWStandard OperationTM2UCX33#TM2 has been connected it ITW.

TM2 has been connected it ITW.  All turbo pumps are started.

  2232   Thursday, July 08, 2021, 11:36 David WangConditioning StationStandard OperationTM4Ta#62Remotely remove TM4(Ta#62) from SHC to TCS.

Remotely remove TM4 (ta# 62) from SHC to TCS.  The moving is smooth.