2151
|
Tuesday, September 29, 2020, 14:28 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UC#31 | TM4 UC#31 Electrical check and HS leak check | Tm4 UCx 31# electrical check result. See
attachment. |
|
|
2156
|
Monday, October 19, 2020, 12:52 |
David Wang | South Hot-Cell | Standard Operation | TM2 | C#2 | TM2 electrical and leak check at SHC | TM2 electrical check and leak check are
done at SHC with C#2 target installed. The
results are good. |
|
|
2161
|
Thursday, November 05, 2020, 10:23 |
David Wang | Spent Target Vault | Standard Operation | | | TM2 old source tray and TM4 optic tray in vault tray#9. | TM2 old source tray and TM4 optic tray
are stored together in vault tray#9. The
fielding measurement at SHC post 0.5 meter |
|
|
2165
|
Wednesday, November 18, 2020, 15:28 |
David Wang | South Hot-Cell | Standard Operation | TM2 | Nb#6 | electrical check and HS leak check. | Everything looks good. A still short to
P before target installation. We will float
P,Q as before on module top. |
|
|
2166
|
Thursday, November 19, 2020, 09:00 |
David Wang | Conditioning Station | Standard Operation | TM2 | Nb#6 | Helium pressure check on TM2 HS line at TCS. | LD 0.0 Xe-9 atm.cc/sec , 70 psi helium
3 minutes. No leak. |
|
|
2169
|
Tuesday, November 24, 2020, 12:56 |
David Wang | ITW | Standard Operation | TM2 | Nb#9 | TM2 has been connected in ITW | TM2 has been connected to ITW. Turbo pumps
are stared. ITW pumping down is fine so far. |
|
|
2176
|
Wednesday, January 06, 2021, 10:39 |
David Wang | ITE | Standard Operation | TM4 | | ITE and TM4 annual leak check. | Frank and I finished ITE and TM4 primary
and secondary vacuum vessel leak
check. LD bease leak rate 0.0x-9atm.cc/sec. No leak has been found.Also, All TM4 water lines have been pressurized with 70psi helium fro 3 minutes on each circuit. All water lines i |
|
|
2178
|
Monday, January 18, 2021, 12:29 |
David Wang | ITW | Standard Operation | TM2 | Nb#9 | ITW vacuum and TM2 water lines leak check . | ITW primary and secondary vacuum vessel
leak check are done. There is a 5XE-8 atm.cc/sec
leak on Exit service cap NW side square panel. |
|
|
2180
|
Friday, January 22, 2021, 12:34 |
David Wang | ITE | Standard Operation | | | ITE HV test. | ITE annual HV test is done. No module in
station. The bias power supply has been ramped
up to 49KV on control page. We still have |
|
|
2181
|
Monday, January 25, 2021, 10:57 |
David Wang | South Hot-Cell | Repair | TM4 | | TM4 steers short investigation. | Cables were disconnected for steers in
containment box. The Megga measurement (500V)
result from the top of the module: |
|
|
2182
|
Monday, January 25, 2021, 12:33 |
David Wang | ITW | Standard Operation | | | ITW bias HV test | Ramp up ITW bias to 57KV. no spark. 200uA
leaking current at 57KV. The test is done
without target module in station. |
|
|
2183
|
Wednesday, January 27, 2021, 14:30 |
David Wang | Cooling | Development | | | High active water system purging | High active water are purged to holding
tank at B2 level. There should be around
48 gallons are purged out of system. No purging |
|
|
2184
|
Wednesday, February 03, 2021, 09:14 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 from TCS to SW silo. | TM4 is moved from TCS to SW silo. The moving
is smooth.
|
|
|
2185
|
Wednesday, February 10, 2021, 11:34 |
David Wang | Assembly/Bench Test | Standard Operation | | | Old resin can and 2A window RH clamp field measurement at silo. | Old resin can: 0.5 meter 360 degree
rotation above silo area, 350u sv/hr.
On contact 3.0 to 3.5 msv/hr. |
|
|
2186
|
Wednesday, February 10, 2021, 13:30 |
David Wang | Safe Module Parking | Standard Operation | | | TM2 and TM4 electrical check without targets. | TM2 at SMP under vacuum. TM4 at silo.
Frank and I did the tests. Everything is
fine on TM4 check. On TM2, all |
|
|
2187
|
Friday, February 12, 2021, 07:07 |
David Wang | ITE | Maintenance | | | ITW and ITE clean up. | Vacuum cleaned ITW and ITE station.
|
|
|
2189
|
Thursday, February 18, 2021, 12:33 |
David Wang | ITE | Repair | | | ITE:TP1S | ITE TP1S new pump is installed today. Reset
pump life time on controller to 0 hr. |
|
|
2190
|
Thursday, February 18, 2021, 12:59 |
David Wang | Assembly/Bench Test | Maintenance | | | TM3 source tray and old resin can storage in lower cyclotron basement | TM3 old source tray, old target hall high
active water resin tank, and old 2A
window RH clamp are transferred from TH to |
|
|
2191
|
Tuesday, February 23, 2021, 09:00 |
David Wang | Assembly/Bench Test | Maintenance | | | target staion vacuum pumps inspection. | Edi and I inspected roughing pump ITM MP1,
primary backup pump ITHMP1, and secondary
backup pump ITHMP2. We checked oil level |
|
|
2193
|
Tuesday, March 02, 2021, 08:12 |
David Wang | Conditioning Station | Standard Operation | | | TCS leak check. | TCS leak check: TCS IG1S1.6 XE- 6 torr.
LD 0.0XE-9atm.cc/sec.We used a long
pole to spray helium to TCS vacuum seals |
|