Entry  Tuesday, June 23, 2020, 10:56, David Wang, Safe Module Parking, Standard Operation, , , SMP annual service.  
Dan and I did the SMP annual  maintenance service today. Lid open/close , vessel rotation and limit switch check, lubricate chains, tighten fasteners,
and visual inspection.  Everything works fine. 
Entry  Friday, June 26, 2020, 15:00, David Wang, ITW, Maintenance, , , ITW TP1 and TP1S. 
ITW TP1 can not be started yesterday. Also, TP1S was difficult to start , and had a high current draw after.  We changed both of them in pit today.
TP1 and TP1S are started successfully after replacement. 
Entry  Monday, June 29, 2020, 10:09, David Wang, ITE, Standard Operation, TM4, P2N test., ITE turbo pumps are stopped 
ITE venting is in processing.
Entry  Friday, July 03, 2020, 06:57, David Wang, ITW, Standard Operation, TM2, C#1, TM2 CONNECTION CHECKLIST  TM2_C#1_CONNECTION_CHECKLIST.pdf
SEE ATTACHMENTS. EVERYTHING IS GOOD.
Entry  Friday, July 03, 2020, 07:03, David Wang, South Hot-Cell, Standard Operation, TM4, BEFORE TARGET INSTALLATION, ELECTRICAL CHECK BEFORE TARGET INSTALLATION. TM4_ELECTRICAL_CHECK_20220_07_02.pdf
PQ SHORT TO RU. A TO PQ 1.8 M OHM AT 500 V. THE REST ARE OL
Entry  Friday, July 03, 2020, 13:23, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#30, TM4 UCx#30 Electrical check and HS leak check TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf
Electrical and leak check are good. See attachment. 
Entry  Monday, July 06, 2020, 07:54, David Wang, ITE, Standard Operation, TM4, UCx 30, TM4 has been connected in ITE connection  Tm4_UCx_30_connection_checklist.pdf
TM4 has been connected in ITE. Vacuum pumping down is good so far.
Entry  Monday, July 06, 2020, 12:20, David Wang, ITW, Standard Operation, TM2, C#1, Five shielding blocks to ITW 
Five shielding blocks are transferred to ITW
Entry  Tuesday, August 18, 2020, 09:06, David Wang, ITW, Standard Operation, TM2, , TM2 and ITW entrance module have been disconnected in ITW 
Tm2 and itw entrance module have been disconnected in ITW. I will attach disconnection checklist later. 
Entry  Wednesday, August 26, 2020, 09:52, David Wang, South Hot-Cell, Standard Operation, TM2, Ta#60, Ta#60 target electrical check and leak check at SHC. Ta_60_electrical_checklist.pdf
Electrical check and leak check at SHC. NO leak. electrical check ok.   Before target on, A is short to PQ, RU is short to HS ( 60KV bias)
as we measured before. 
Entry  Thursday, August 27, 2020, 08:21, David Wang, Conditioning Station, Standard Operation, TM2, Ta#60, Helium pressure check on TM2 HS line at TCS. 
Helium pressurize on TM2 HS line at TCS is done.    Base LR is 0.0X E-9 atm.cc/sec.  70 psi helium 3 minutes.   No response.   Also, The TCS vacuum pumping
down over night is good. 
Entry  Thursday, September 24, 2020, 11:25, David Wang, Conditioning Station, Standard Operation, TM4, UC#31, TM4 HS line leak check at SHC and TCS. 
Both helium spray and helium pressurize on TM4 HS line withUCx31 target are done at SHC and TCS. No leak.
Entry  Tuesday, September 29, 2020, 12:12, David Wang, ITE, Repair, TM4, , TM4 steerers staus after" left " grounding issue, and first stage investigation 
 Left (short) is switched with bottom. So on module:

"Top" is still top.


"Left" is bottom
Entry  Tuesday, September 29, 2020, 14:28, David Wang, South Hot-Cell, Standard Operation, TM4, UC#31, TM4 UC#31 Electrical check and HS leak check TM4_UCx31_elctrical_and_leak_check_at_SHC..pdfScanned_from_a_Xerox_Multifunction_Printer.pdf
Tm4 UCx 31# electrical check result. See attachment.
Entry  Monday, October 19, 2020, 12:52, David Wang, South Hot-Cell, Standard Operation, TM2, C#2, TM2 electrical and leak check at SHC Tm3_bunker_set_up_018.JPG
TM2 electrical check and leak check are done at SHC with C#2 target installed. The results are good.  
Entry  Thursday, November 05, 2020, 10:23, David Wang, Spent Target Vault, Standard Operation, , , TM2 old source tray and TM4 optic tray in vault tray#9. 
TM2 old source tray and TM4 optic tray are stored together in vault tray#9. The fielding measurement at SHC post 0.5 meter distance:
 
March 1st 2019, maximum 14.6msv/hr, minimum 4.78 msv/hr
Entry  Wednesday, November 18, 2020, 15:28, David Wang, South Hot-Cell, Standard Operation, TM2, Nb#6, electrical check and HS leak check. Screenshot_2020-11-18_Mail_-_David_Wang_-_Outlook.png
Everything looks good. A still short to P before target installation. We will float P,Q as before on module top. 
Entry  Thursday, November 19, 2020, 09:00, David Wang, Conditioning Station, Standard Operation, TM2, Nb#6, Helium pressure check on TM2 HS line at TCS. 
LD 0.0 Xe-9 atm.cc/sec , 70 psi helium 3 minutes.  No leak.
Entry  Tuesday, November 24, 2020, 12:56, David Wang, ITW, Standard Operation, TM2, Nb#9, TM2 has been connected in ITW TM2_Nb#9_module_connection_checklist.pdf
TM2 has been connected to ITW. Turbo pumps are stared. ITW pumping down is fine so far.
Entry  Wednesday, January 06, 2021, 10:39, David Wang, ITE, Standard Operation, TM4, , ITE and TM4 annual leak check. 
Frank and I finished ITE and TM4 primary and secondary  vacuum vessel  leak check. LD bease leak rate 0.0x-9atm.cc/sec. No leak has been found.Also, All TM4 water lines  have been pressurized with 70psi helium fro 3 minutes on each circuit. All water lines i