  2151   Tuesday, September 29, 2020, 14:28 David WangSouth Hot-CellStandard OperationTM4UC#31TM4 UC#31 Electrical check and HS leak check

Tm4 UCx 31# electrical check result. See attachment.

Attachment 1: TM4_UCx31_elctrical_and_leak_check_at_SHC..pdf
TM4_UCx31_elctrical_and_leak_check_at_SHC..pdf
Attachment 2: Scanned_from_a_Xerox_Multifunction_Printer.pdf
Scanned_from_a_Xerox_Multifunction_Printer.pdf
  2156   Monday, October 19, 2020, 12:52 David WangSouth Hot-CellStandard OperationTM2C#2TM2 electrical and leak check at SHC

TM2 electrical check and leak check are done at SHC with C#2 target installed. The results are good.  

Attachment 1: Tm3_bunker_set_up_018.JPG
Tm3_bunker_set_up_018.JPG
  2161   Thursday, November 05, 2020, 10:23 David WangSpent Target VaultStandard Operation  TM2 old source tray and TM4 optic tray in vault tray#9.

TM2 old source tray and TM4 optic tray are stored together in vault tray#9. The fielding measurement at SHC post 0.5 meter distance:
 

March 1st 2019, maximum 14.6msv/hr, minimum 4.78 msv/hr

Nov 2nd 2020, max 7.11m sv/hr, min 2.5msv/hr.

  2165   Wednesday, November 18, 2020, 15:28 David WangSouth Hot-CellStandard OperationTM2Nb#6electrical check and HS leak check.

Everything looks good. A still short to P before target installation. We will float P,Q as before on module top.

Attachment 1: Screenshot_2020-11-18_Mail_-_David_Wang_-_Outlook.png
Screenshot_2020-11-18_Mail_-_David_Wang_-_Outlook.png
  2166   Thursday, November 19, 2020, 09:00 David WangConditioning StationStandard OperationTM2Nb#6Helium pressure check on TM2 HS line at TCS.

LD 0.0 Xe-9 atm.cc/sec , 70 psi helium 3 minutes.  No leak.

  2169   Tuesday, November 24, 2020, 12:56 David WangITWStandard OperationTM2Nb#9TM2 has been connected in ITW

TM2 has been connected to ITW. Turbo pumps are stared. ITW pumping down is fine so far.

Attachment 1: TM2_Nb#9_module_connection_checklist.pdf
TM2_Nb#9_module_connection_checklist.pdf TM2_Nb#9_module_connection_checklist.pdf TM2_Nb#9_module_connection_checklist.pdf TM2_Nb#9_module_connection_checklist.pdf
  2176   Wednesday, January 06, 2021, 10:39 David WangITEStandard OperationTM4 ITE and TM4 annual leak check.

Frank and I finished ITE and TM4 primary and secondary  vacuum vessel  leak check. LD bease leak rate 0.0x-9atm.cc/sec. No leak has been found.Also, All TM4 water lines  have been pressurized with 70psi helium fro 3 minutes on each circuit. All water lines in TM4 are good. No resopne on LD during test. 

  2178   Monday, January 18, 2021, 12:29 David WangITWStandard OperationTM2Nb#9ITW vacuum and TM2 water lines leak check .

ITW primary and secondary vacuum vessel leak check are done. There is a 5XE-8 atm.cc/sec leak on Exit service cap NW side square panel.  The leak is small. And, it is close to ITW TP3 so it is not affect ion beam line vacuum during operation. We will replace the seal on the panel later.   The rest leak check on air to vacuum seals are good. TM2 water lines are pressurized with 70 psi helium. We did it  3 hours after water lines are purged. No leak was showed during the check.

2021-02-24th: The o-ring on exit 1 NW side square panel is replaced by David Wang and Frank Song. 

  2180   Friday, January 22, 2021, 12:34 David WangITEStandard Operation  ITE HV test.

ITE annual HV test is done. No module in station. The bias power supply has been ramped up to 49KV on control page. We still have voltage limit issue on this PS at 48KV so it only can go to 47.7 KV on PS panel. No major spark during test.. The test result is same as last year test which was did in March 2020. 

  2181   Monday, January 25, 2021, 10:57 David WangSouth Hot-CellRepairTM4 TM4 steers short investigation.

Cables were disconnected for steers in containment box. The Megga measurement (500V) result from the top of the module:

Left to right: OL, left to top OL,  left to bottom OL, right to top OL, right to bottom OL,  Top to bottom OL. And all of them to ground are OL.  No short on cables from module top to steers itself. The short should be inside the steers. It will be confirmed with directly test on steers.  

  2182   Monday, January 25, 2021, 12:33 David WangITWStandard Operation  ITW bias HV test

Ramp up ITW bias to 57KV. no spark. 200uA leaking current at 57KV. The test is done without target module in station.   ITW water circuits are looped in pit.  EE , EL are switched off during the test. 

  2183   Wednesday, January 27, 2021, 14:30 David WangCoolingDevelopment  High active water system purging

High active water are purged to holding tank at B2  level. There should be around 48 gallons are purged out of system. No purging on dump circuits on both ITW/ ITE.

  2184   Wednesday, February 03, 2021, 09:14 David WangConditioning StationStandard OperationTM4 TM4 from TCS to SW silo.

TM4 is moved from TCS to SW silo. The moving is smooth.

 

 

 

 

 

 

 

 

 

 

 

  2185   Wednesday, February 10, 2021, 11:34 David WangAssembly/Bench TestStandard Operation  Old resin can and 2A window RH clamp field measurement at silo.

Old resin can:  0.5 meter 360 degree rotation above silo area, 350u sv/hr.   On contact  3.0 to 3.5 msv/hr.  It was replaced during 2017 winter shut down, and stored in silo since then.

2a window RH clamp: 0.5 meter, 160 usv/hr.  On contact, hottest spot 3.5msv/hr, general,1.8 msv/hr. 

 Both of them were raise out of storage silo with TH crane. Pole monitor was used for field check.

  2186   Wednesday, February 10, 2021, 13:30 David WangSafe Module ParkingStandard Operation  TM2 and TM4 electrical check without targets.

 TM2 at SMP under vacuum. TM4 at silo.  Frank and I did the tests. Everything is fine on TM4 check.  On TM2,  all mega test at 500V are around 200K ohms which is so abnormal. We will move TM2 to TCS and  start investigation there.

Attachment 1: TM2_and_TM4_electrical_check_without_target.pdf
TM2_and_TM4_electrical_check_without_target.pdf TM2_and_TM4_electrical_check_without_target.pdf
  2187   Friday, February 12, 2021, 07:07 David WangITEMaintenance  ITW and ITE clean up.

Vacuum cleaned ITW and ITE station. 

  2189   Thursday, February 18, 2021, 12:33 David WangITERepair  ITE:TP1S

ITE TP1S new pump is installed today. Reset pump life time on controller to 0 hr.

  2190   Thursday, February 18, 2021, 12:59 David WangAssembly/Bench TestMaintenance  TM3 source tray and old resin can storage in lower cyclotron basement

TM3 old source tray, old target hall high active water resin tank, and  old 2A window RH clamp are transferred from TH to cyclotron lower vault basement 10 and 10A location for storage. They are placed beside and in front of old TM1 and TM2 source tray boxes which stored there in 2018. 

  2191   Tuesday, February 23, 2021, 09:00 David WangAssembly/Bench TestMaintenance   target staion vacuum pumps inspection.

Edi and I inspected roughing pump ITM MP1, primary backup pump ITHMP1, and secondary backup pump ITHMP2. We checked oil level and color on all pumps.  Refilled lubricant to ITMMP1. ITHMP1 and MP2 oil level is fine. ITH MP1 oil color is darker than MP2. But, both them are ok still. Shielding block has been restored after the job.

  2193   Tuesday, March 02, 2021, 08:12 David WangConditioning StationStandard Operation   TCS leak check.

TCS leak check: TCS IG1S1.6 XE- 6 torr. LD  0.0XE-9atm.cc/sec.We used a long pole to spray helium to TCS vacuum seals on diagnostic box and vessel body. Lots helium have been sprayed around the check area.  no leak has been found.