Monday, September 23, 2024, 16:06, Aaron Tam, South Hot-Cell, Repair, TM3, , Insulator Addition to Water block
|
September 23, 2024 - C. Fisher
Containment box removed
Insulator installed
New window line VCR seals installed
Dropped bolt
from TiC#8 removed
Containment box reinstalled
September 23, 2024 - A. Tam |
Wednesday, December 19, 2018, 14:41, Anders Mjos, Conditioning Station, Standard Operation, , No target, Installed Shield Block on TCS
|
Frank and Anders installed lid on TCS and started vacuum system yesterday. To run over the Holidays. Retrieved dose badge from operational storage area.
Measured field to be ~ 10 mSv/h at ~9am. Beam went off about 8:30am. |
Wednesday, November 06, 2013, 10:41, David Wang, South Hot-Cell, Repair, TM2, , Installed 2 turbopumps on TM2
|
Bevan and I installed 2 turbo pumps on TM2. The o- ring flanges on TM2 had been cleaned before the installation. |
Thursday, October 05, 2017, 11:04, Anders Mjos, ITW, Maintenance, , , Installation of new valve for module move ventilation
|
David installed the new ball valve and connections for the SAS project module move ventilation. SASP0482. Drawing reference ISK5029B. |
Thursday, April 06, 2017, 15:16, Anders Mjos, Conditioning Station, Maintenance, , , Installation of new break out box to accommodate both ITM:MP2 and TCS:MP1
|
Installation by Marshall. Dave M from controls adjusted circuitry to get TCS:MP1 to start.
Work is being done in preparation for the Module Move Ventilation SAS project |
Wednesday, September 12, 2018, 15:30, Isaac Earle, North Hot-Cell, Development, , , Installation of NHC operator-level lighting completed
|
Installation of of operator-level lighting in the NHC was completed today according to drawing IRH1801. 2" x 2" Panduit was mounted
to the wall on aluminum brackets to support the power cables. These lights can be replaced remotely by unplugging the power cords using the manipulators,
lifting the cable out of the Panduit with a hooked pole tool through the manipulator slave end removal roof hatch, lifting the light fixture off the support |
Wednesday, November 15, 2017, 08:55, David Wang, Conditioning Station, Standard Operation, , , Install shield plug onto TCS and pumping down TCS.
|
Shielding plug is installed onto TCS. TCS is being pumped down to keep it under vacuum for the rest of the year. |
Wednesday, October 14, 2015, 14:49, David Wang, South Hot-Cell, Standard Operation, TM2, , Install new high current cables to TM2
|
I installed a set of new high current cables for TM2 Febiad run. The top of TM2 is configured to Febiad mode. See attachments |
Thursday, January 25, 2024, 07:31, David Wang, Crane, Standard Operation, , , Inspection oftareg hall crane below hook attachment pins and plates ITA6550-01
|
Tom Kauss inspected target hall crane below hook attachment pins and plates ITA6550-01 yesterday. He certified the use of these pins and plates for
year 2024. The inspection of these pins and plates was in Target hall crane annual check list. It was issued as a calibration index by Isaac Earle
in 2022-Feb-08. After inspection, The inspection tag was issued and attached to pin. Tom has an inspection record on this job. |
Thursday, January 25, 2024, 07:27, David Wang, Crane, Standard Operation, , , Inspection of target module lifting frames ITA0494-1997-01 and ITA0494-1997-02
|
Tom Gauss inspected two target module lifting frames ITA0494-1997-01 and ITA0494-1997-02 yesterday. He certified the use of these two frames
for 2024. Inspection tags have been issued and attached to frames. He has inspection record on them. |
Friday, January 27, 2023, 07:18, David Wang, Crane, Standard Operation, , , Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02
|
Tom Gauss inspected two target module lifting frames ITA0494-1997-01 and ITA0494-1997-02 yesterday. He certified the use of these two frames for
2023. Inspection tags have been issued and attached to frames. He has inspection record on them. |
Wednesday, November 16, 2011, 07:46, chad fisher, South Hot-Cell, Standard Operation, TM1, TaC#1, Inspection of TaC#1
|
Inspection of TaC#1 showed that the oven was indeed broken on the A+ (left oven leg) side of the central block.
See the following for pictures.
|
Monday, June 24, 2024, 14:37, Carla Babcock, South Hot-Cell, Development, TM3, UCx#44, Inspection of TM3 and UCx#44 after no-protons run
|
TM3 and UCx#44 ran in ITE but issues with the cyclotron prevented proton beam delivery. Nonetheless, the target was heated and provided stable beam to
TITAN as well as for tuning and some tests.
Results of inspection of TM3 module after run: |
Friday, January 27, 2023, 07:25, David Wang, Crane, Standard Operation, , , Inspection of TH crane below hook attachment pins and plates ITA6550-01
|
Tom Kauss inspected target hall crane below hook attachment pins and plates ITA6550-01 yesterday. He certified the use of these pins and plates. The
inspection of these pins and plates was in Target hall crane annual check list. It was issued as a calibration index by Isaac Earle in 2022-Feb-08.
After inspection, The inspection tag was issued and attached to pin. Tom has an inspection record on this job |
Thursday, September 21, 2017, 16:26, Anders Mjos, South Hot-Cell, Standard Operation, TM2, , Inspection of Source Tray
|
Chad and Anders inspected the Source Tray today using the camera in the hot cell. A dark spot was observed on one of the four insulators separating the
Extraction Electrode from the Ground Electrode. This could potentially influence the high leakage current. Some discolored areas were also observed in
the Service Tray, but these was present when the module was built. See attachment for details. |
Wednesday, September 04, 2013, 19:01, Grant Minor, South Hot-Cell, Repair, TM3, , Inspection / Ante Room Leak Check Results on TM3 Heat Shield lines (3 Sept 2013)
|
Yesterday, Grant entered the Ante Room with David Wang to visually inspect the two sets of failed c-seals from the Heat Shield circuit, to remove the
second set from the Heat Shield water blocks, and to leak check the heat shield circuit with o-rings and a water-block-to-leak-detector fitting.
Some photos of the inspected seals are in the attached design review presentation. Some unusual marks were observed on both sets of failed |
Wednesday, January 19, 2022, 13:26, David Wang, Crane, Standard Operation, , , Inpection of Target module lifting frames ITA0494-1997-01 and ITA0494-1997-02.
|
Tom Gauss inspected two target module lifting frames ITA0494-1997-01 and ITA0494-1997-02.. He certified the use of these two frames. Inspection
tags have been issued and attached to frames. He has inspection record on them. See attachments. |
Thursday, June 22, 2017, 11:10, chad fisher, South Hot-Cell, Maintenance, , , In cell airline
|
The in cell airline has preemptively been replaced. The hose was, as far as I know the original. |
Monday, July 28, 2014, 17:26, Ron Kuramoto, ITW, Repair, , , ITW:IV5 Air leak repair
|
Air leak was found at the Solenoid control valve located in the Pre-Separator & DB0 room. The gasket between
the solenoid body and its manifold block was broken, see attached photos. The gasket and solenoid body were replaced. Air was turned back on
to IV5 (B/L gate valve) with no apparent air leaks. The gate valve was actuated open & closed from the control room seeing both limits successfully. |
Wednesday, November 14, 2018, 16:10, Anders Mjos, ITW, Repair, TM2, UC#25, ITW:FC5 safety signal troubleshooting
|
Measured resistance on safety limit switches for FC5 on Exit Module 2. Determined that the in connected signal did not work (shows not connected irregardless
of FC position). Confirmed proper operation of the OUT limit. See attachment for details. The Harp 5 x and y signal connectors were checked and reconnected. |
|