  RH-ISAC, Page 100 of 140  Not logged in ELOG logo
ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  927   Tuesday, June 02, 2015, 14:32 David WangSouth Hot-CellStandard OperationTM4SiC #31Leak check on TM4 HS water line with new SiC #31 target. at SHCChad and I leak checked TM4 HS water line
with SiC #31 target installed. leak rate:0.0xE-9atm.cc/sec. 
No leak.  The line will be helium pressurized
 003.JPG005.JPG001.JPG 
  1016   Monday, July 27, 2015, 15:34 David WangITEStandard OperationTM4 Leak check on TM4 HS water line with new UCX target. at SHCChad and I leak checked the HS line at
SHC after UCX target installation. On first
round helium spray, one of VCR fitting has
  
  1075   Tuesday, September 22, 2015, 13:15 David WangSouth Hot-CellStandard Operation Ta#46Leak check on TM4 HS water line with new Ta#46 target. at SHCChad and I leak checked the HS line at
SHC. No leak. Leak rate 0.0xE-9atm.cc/sec.
  
  692   Thursday, June 26, 2014, 10:57 David WangSouth Hot-CellStandard OperationTM3 Leak check on TM3 HS water line with new target. installed.Chad and I leak checked the TM3 HS water
line with new target installed.  No
leak has been found during the check. Leak
  
  600   Thursday, February 13, 2014, 14:23 David WangSouth Hot-CellRepairTM2 Leak check on TM2 tube heater (+) water line with blank off(elastic seal) installed on WB.Chad and I did the leak check on TM2 tube
heater (+) water line  with blank off(
+ elastic o ring seal) installed on "D" 
 005.JPG001.JPG 
  608   Tuesday, February 25, 2014, 06:53 David WangSouth Hot-CellRepairTM2 Leak check on TM2 tube heater (+) water line with blank off(C-seal) installed on WB.Chad and I did the leak check   on
TM2 tube heater (+) water line  with
blank off and C-seal  installed on 
  
  1051   Wednesday, August 26, 2015, 14:28 David WangConditioning StationStandard OperationTM2ZrCLeak check on TM2 HS and windowwater line with new ZrC target at SHCChad and I leak checked TM2 HS and window
circuit VCR joints with ZrC target and containment
box installed at SHC. No leak has been found.
  
  1068   Tuesday, September 15, 2015, 08:24 David WangSouth Hot-CellRepairTM1UCx 13Leak check on TM1 window circuit soldering stems in service cap.I did a leak check on TM1 window circuit 
2 soldering  stems in service cap.The
round side panel was opened for the job.
  
  778   Tuesday, November 04, 2014, 11:05 David WangSouth Hot-CellStandard OperationTM1ThO#1Leak check on TM1 HS water line withThO#1 installed.Chad and I leak checked HS line on TM1
with ThO#1 target installed. The LD pumped
down to base leak rate 0.0xE-9 atm.cc/sec,
  
  673   Monday, June 02, 2014, 11:59 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 HS water line with new UC9# target installedChad and I leak checked TM1 HS and UC9#
VCR fittings. No response had been found
on leak detector during the test. I will
  
  708   Thursday, July 17, 2014, 10:13 David WangConditioning StationStandard OperationTM1 Leak check on TM1 HS water line with new target installedChad and I leak checked TM1 HS waterline
with new target installed at SHC. The LD
base LR:0.0xE-9atm.cc/sec, base pressure:
  
  739   Thursday, September 04, 2014, 09:47 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 HS water line with new target installedChad and I  leak checked the TM1 HS
line with new target installed. Base leak
rate 0.0xe-9 atm.cc/sec. No any response
  
  21   Thursday, August 18, 2011, 14:09 Bevan MossSouth Hot-CellStandard OperationTM1UCx#2Leak and Electrical Check plus Remote Move to Conditioning Station TM1 with UC#2 had the target installed,
the heat shield line was pumped on and achieved
a vacuum of 0.0 x 10^-4 Torr and a  leak
  
  25   Wednesday, August 24, 2011, 17:11 Bevan MossConditioning StationStandard OperationTM1UCx#2Leak Check, HV conditioning and Module MoveToday a leak check on TM1's external seals
and the heat shield line was completed by
David Wang. After 16 hours of the turbo pumps
  
  43   Friday, October 28, 2011, 14:29 Bevan MossConditioning StationStandard OperationTM4 Leak Check on October 27/10/2011A leak check was performed on the module
on October 27/10/2011 by David Wang and was
reported to Bevan Moss but it never made
  
  23   Friday, August 19, 2011, 14:52 Bevan MossConditioning StationRepairTM1UCx#2Leak Check A
leak check was performed on the module when
it was in the conditioning station today.
  
  422   Monday, August 19, 2013, 10:08 Anders MjosITERepairTM4SiC#29Leak CheckAll water circuits except Coil 1 were leak
checked by David and Anders. No obvious signals
were detected except some small possible
 ITE_Leak_Test_2013-08-19.pdf 
  1897   Monday, March 25, 2019, 10:11 Aaron SchmidtSouth Hot-CellRepairTM2 LP-FEBIAD Test Target (empty) Link to previous target information: https://elog.triumf.ca/TIS/RH-ISAC/1039
 TM2_-_FEBIAD_target_-_Electrical_Test.pdf 
  781   Wednesday, November 05, 2014, 14:21 Anders MjosConditioning StationDevelopment  Jumper installed on TGHT, TBHT and COIL A copper bar jumper (ITD0488) was
installed on the TGHT, TBHT and COIL conductors
on the taregt hall side for TCS testing.
 Jumper1.jpgJumper2.jpg 
  789   Monday, November 17, 2014, 13:45 chad fisherSouth Hot-CellRepair  Jig for roof install of targetJig for installation of target through
hot cell roof has been assembled and placed
in the target hall.
 Target_roof_install_20141117_01.jpgTarget_Roof_install_Jig_20141117_02.jpgTarget_roof_install_20141117_03.jpgTarget_roof_install_20141117_04.jpg 