ID Date Author Category Type Module Target/Number Subject Text Attachments
  788   Monday, November 17, 2014, 11:38 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the conditioning station to the north west
silo.
  
  787   Thursday, November 13, 2014, 14:05 David WangITERepairTM4 Dan and I replaced flow wheel on ITE HVC2 water flow sensor.Dan and I replaced flow wheel on ITE HVC2
water flow sensor. The old wheel did rotate
smoothly inside its SST case. The new wheel
  
  786   Thursday, November 13, 2014, 14:01 David WangITWRepairTM1 I replaced flow wheel and coil on ITW MSP water flow sensor.I replaced flow wheel and coil on ITW MSP
water flow sensor which is located in ITW
pit. Before replacement, I checked the signal
  
  785   Thursday, November 13, 2014, 13:52 David WangITWStandard OperationTM1ThO#15 Shielding blocks have been transferred from ITE to ITW.Dan and I transferred 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam.
  
  784   Thursday, November 06, 2014, 13:43 David WangConditioning StationDevelopmentTM3 CS vacuum system has been connected to TM3.CS  vacuum system has been connected
to TM3 for control system test(Dave.Morris).
  
  783   Thursday, November 06, 2014, 08:55 David WangITWRepairTM1ThO#1 primary vacuum back up pressureITH CG1 ,CG2,CG4A were high.I found primary vacuum back up pressure
ITH CG1, CG2, and CG4A were unusually high
this morning. They should be about 10 -20
  
  782   Thursday, November 06, 2014, 08:07 David WangITWStandard OperationTM1ThO#1TM1 has been connected in ITW.TM1 has been connected in ITW. All turbo
pumps are started. The pumping down on ITW
is good so far. The water is supplied to
  
  781   Wednesday, November 05, 2014, 14:21 Anders MjosConditioning StationDevelopment  Jumper installed on TGHT, TBHT and COIL A copper bar jumper (ITD0488) was
installed on the TGHT, TBHT and COIL conductors
on the taregt hall side for TCS testing.
 Jumper1.jpgJumper2.jpg 
  780   Wednesday, November 05, 2014, 10:20 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1module moveTM#1 with ThO#1 has been moved from the
south hot cell to the west target station.
  
  779   Tuesday, November 04, 2014, 13:17 chad fisherSouth Hot-CellStandard OperationTM1ThO#1TM1 w/ ThO#1 readyTm1 with ThO#1 is buttoned up and ready
for transport.
  
  778   Tuesday, November 04, 2014, 11:05 David WangSouth Hot-CellStandard OperationTM1ThO#1Leak check on TM1 HS water line withThO#1 installed.Chad and I leak checked HS line on TM1
with ThO#1 target installed. The LD pumped
down to base leak rate 0.0xE-9 atm.cc/sec,
  
  777   Monday, November 03, 2014, 13:47 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1Electrical checkTM#1 with ThO#1 electrical check see attatched
PDF for details.
 TM1_elec_check_ThO1_SHC.PDF 
  776   Monday, November 03, 2014, 11:16 chad fisherSouth Hot-CellStandard OperationTM1ThO#1ThO#1 InstalledThO#1 has been installed onto TM1 and is
ready for leak and electrical checking. High
current fasteners torqued to 130 in lbs.
  
  775   Monday, November 03, 2014, 10:27 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 has been moved from the south west
silo to the south hot cell.
  
  774   Wednesday, October 22, 2014, 13:05 Anders MjosConditioning StationMaintenance  Controls upgrade on TCS See work
permit for details
  
  773   Wednesday, October 22, 2014, 09:41 David WangConditioning StationDevelopmentTM3 TM3 has been disconnected at CS.TM3 has been disconnected at CS. It is
vented and ready to move.
  
  772   Tuesday, October 21, 2014, 14:53 Travis CaveSpent Target VaultStandard Operation ZrC#6Spent target moveZrC#6 has been moved from the south hot
cell and into storage. It was placed in pail
120 in slot 5C of the vault. For more details
 Vault_Storage_October_21_2014.pdf 
  771   Tuesday, October 21, 2014, 08:55 chad fisherSouth Hot-CellRepair  Manipulator repairThe east manipulator handle has been adjusted
and is ready for use.
  
  770   Monday, October 20, 2014, 14:18 chad fisherSouth Hot-CellRepair  Manipulator RepairThe broken cable on the east manipulator
has been replaced.
The handle will need some adjustments
  
  769   Monday, October 20, 2014, 09:13 David WangConditioning StationDevelopmentTM3 TM3 TP2 failedTM3 TP2 stopped working this morning at
4:00 AM. I tried to start it but failed.
On normal start mode , It could not pass
  