Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 772     Entry time: Tuesday, October 21, 2014, 14:53
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number: ZrC#6 
Subject: Spent target move 

ZrC#6 has been moved from the south hot cell and into storage. It was placed in pail 120 in slot 5C of the vault. For more details see PDF.

Attachment 1: Vault_Storage_October_21_2014.pdf  53 kB  | Show | Hide all
ELOG V2.9.2-2455