Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 781     Entry time: Wednesday, November 05, 2014, 14:21
Author: Anders Mjos 
Category: Conditioning Station 
Type: Development 
Module:  
Target/Number:  
Subject: Jumper installed on TGHT, TBHT and COIL 

 A copper bar jumper (ITD0488) was installed on the TGHT, TBHT and COIL conductors on the taregt hall side for TCS testing.

Attachment 1: Jumper1.jpg  2.247 MB  | Show | Hide all
Attachment 2: Jumper2.jpg  1.679 MB  | Show | Hide all
ELOG V2.9.2-2455