ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
608
|
Tuesday, February 25, 2014, 06:53 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check on TM2 tube heater (+) water line with blank off(C-seal) installed on WB. | Chad and I did the leak check on
TM2 tube heater (+) water line with
blank off and C-seal installed on |
|
607
|
Monday, February 24, 2014, 13:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move | TM#2 moved from the south hot cell to the
conditioning station. |
|
606
|
Monday, February 24, 2014, 12:09 |
chad fisher | South Hot-Cell | Repair | TM2 | | C-seal blank off test | Circuit D has passed the vacuum leak check.
Jig has been removed and containment box
re-installed for move to conditioning station. |
|
605
|
Monday, February 24, 2014, 11:05 |
chad fisher | South Hot-Cell | Repair | TM2 | | Circuit D blank off | The blank off with the o-ring has been
removed, manipulator fixed, circuit D water
block sealinhg surfaces cleaned and blank |
|
604
|
Thursday, February 20, 2014, 11:04 |
chad fisher | South Hot-Cell | Repair | TM2 | | Readying TM2 for C-Seal Leak Check | Containment box has been removed and water
block jig installed. |
|
603
|
Thursday, February 20, 2014, 09:45 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
602
|
Tuesday, February 18, 2014, 11:26 |
David Wang | Conditioning Station | Repair | TM2 | | I stopped turbo pumps and disconnected vacuum system on TM 2 and CS | I stopped turbo pumps and disconnected
vacuum system on TM2 and CS. The TM2 will
be moved to SHC for C seal installation on |
|
601
|
Monday, February 17, 2014, 09:32 |
David Wang | Conditioning Station | Repair | TM2 | | helium pressure test on TM2 tube heater +(D) water line. | I did the helium pressure test on Tube
heater+ line this morning. The vacuum on
CS and TM2 are very good. The base lake rate |
6x |
600
|
Thursday, February 13, 2014, 14:23 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check on TM2 tube heater (+) water line with blank off(elastic seal) installed on WB. | Chad and I did the leak check on TM2 tube
heater (+) water line with blank off(
+ elastic o ring seal) installed on "D" |
|
599
|
Thursday, February 13, 2014, 14:15 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. |
|
|
598
|
Thursday, February 13, 2014, 13:30 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. | Chad and I did the pressure test on TM2tube
heater+(D) water line at SHC with shop
air.We tested from 30psi to 80psi on both |
|
597
|
Thursday, February 13, 2014, 09:24 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line with rubber insert blocked WB in SHC | Chad and I did the Leak checked TM2
tube heater (+) water line with rubber
insert plugged water block on " D" |
|
596
|
Tuesday, February 11, 2014, 13:56 |
chad fisher | South Hot-Cell | Repair | TM2 | | waterblock cleaning | New cleaning and polishing pads have been
inserted onto the hot cell as well as rubber
bungs and a new blank off. |
|
595
|
Friday, February 07, 2014, 10:29 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 C.B. and circuit D | Containment box has been removed and the
blank off from circuit D has been removed
for inspection of both the blank off and |
|
594
|
Wednesday, February 05, 2014, 14:12 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets moved from mini storage to F-308s | All targets in the mini storage (4) have
been moved from there and placed into the
F-308s and those have been moved to the mech |
|
593
|
Wednesday, February 05, 2014, 14:05 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line from inside service cap in TH. | Bevan and I did a leak check on TM2 tube
heater+ from inside service cap in TH. The
leak detector base leak rate 0.0xE-9 atm.cc/sec, |
|
592
|
Tuesday, February 04, 2014, 09:42 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. | Chad and I did a pressure test on TM2 tube
Heater+(D) water line.I pressurized the D
line with shop air from quick connectors(both |
10x |
591
|
Tuesday, February 04, 2014, 08:04 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line. | Chad and I leak checked TM2 tube heater(+)
water line yesterday afternoon. The water
line was difficult to pump down on base leak |
|
590
|
Monday, February 03, 2014, 14:45 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent targets to mini storage and the F-308s to the Target Hall | Targets NiO#1(101), Nb#5(85), TaC#1(92),
and ZrC#5(81) have been moved from the storage
vault and placed in the mini storage. The |
|
589
|
Thursday, January 30, 2014, 13:46 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move | TM#2 has been moved from the conditioning
station to the south hot cell. |
|