ID Date Author Category Type Module Target/Number Subject Text Attachments
  348   Wednesday, May 15, 2013, 16:51 Bevan MossConditioning StationStandard OperationTM3No Source TrayRepeat of HV Test The HV test completed on Monday was
repeated today over a much longer time period.
By taking longer there was slightly less
 150502013_TM3_No_Source_Tray.xlsx 
  347   Wednesday, May 15, 2013, 16:21 Bevan MossConditioning StationRepair  BIAS Current readings off by a factor of 5 A special thanks to Kazuya, Jane
and Ray who jumped on this issue right  away!
The limit of the BIAS PS was set as 20000uA
  
  346   Wednesday, May 15, 2013, 10:25 Bevan MossConditioning StationRepair  ONICON flow meter Scott Adair from Riada sales came
to site to complete diagnostics on the ONICON
flow meter. He could not determine the problem
  
  345   Wednesday, May 15, 2013, 10:20 Bevan MossConditioning StationRepair  Roof top chiller failedI have been getting a fault on the roof
top chiller for the 2 tandem 7.5  ton chillers.
I have checked and we have water flow and
  
  344   Wednesday, May 15, 2013, 10:17 Bevan MossConditioning StationStandard OperationTM3No Source TrayPreliminary Results from HV testing Testing on TM3 without a source tray
was completed on 13/05.2013. All items were
tied to common and the water blocks were
 module_hv_test_0KV.rgaMODULE_hv_test_42kv.rgaTM3_13052013_no_source_tray.xlsx 
  343   Wednesday, May 15, 2013, 10:00 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.HS had been purged. The ITE is under venting.
The TM4 will be moved to SH on next Tuesday
which is May 21th.
  
  342   Monday, May 13, 2013, 15:10 Bevan MossConditioning StationStandard OperationTM3N/AHV Test All common

    

       
            
 TM3_40kV_22042013.xlsx 
  341   Monday, May 13, 2013, 14:59 Bevan MossConditioning StationStandard OperationTM3N/AEL testing

    

       
            
 TM3_EL_39.9kV_23042013.txt 
  340   Friday, May 10, 2013, 14:05 Bevan MossConditioning StationStandard OperationTM3No Source TrayTurbo Pumps OnThe turbo pumps are on. TP1 and TP2 once
again timed out and had to be restarted before
they would stay on.
  
  339   Friday, May 10, 2013, 11:28 Bevan MossConditioning StationStandard OperationTM3No Source TrayRoughing Started Roughing on TM3 was started at 11:26am
today
  
  338   Friday, May 10, 2013, 11:11 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical checkTM#3 electrical check with no target and
no source tray, see pdf.
 TM#3_elec_chk_no_tgt_no_tray.PDF 
  337   Friday, May 10, 2013, 11:02 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target and no source tray
has been moved from the south hot cell to
the conditioning station.
  
  336   Friday, May 10, 2013, 09:26 chad fisherSouth Hot-CellRepairTM3 Containment box reinstalledthe containment box has been reinstalled
onto TM3. After electrical checks it is ready
to move to the conditioning station...for
 IMG_1062[1].JPGIMG_1063[1].JPG 
  335   Thursday, May 09, 2013, 14:23 chad fisherSouth Hot-CellRepairTM3 Water Block Jig RemovalThe source tray side of the water block
jig has been removed in preparation for moving
the module to the  conditioning station
 IMG_1059[1].JPG 
  334   Thursday, May 09, 2013, 10:13 chad fisherSouth Hot-CellDevelopment  Mock-up ProgressThe source tray for the mock-up has been
setup for waterline bending and soldering/brazing.
Thanks to Travis for finding the
 IMG_1056[1].JPGIMG_1057[1].JPGIMG_1058[1].JPG 
  333   Wednesday, May 08, 2013, 13:48 chad fisherSouth Hot-CellRepairTM3 IMG wiring checkChecks of the wiring for the IMG are complete
and have passed.
  
  332   Wednesday, May 08, 2013, 10:12 chad fisherSouth Hot-CellRepairTM3 TM3 9 pin wiring removalThe 9 pin wiring has successfully been
removed from TM3.
 IMG_1055[1].JPG 
  331   Tuesday, May 07, 2013, 12:07 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITE to ITW.Water interlock check  on ITW is done.
All water signals are strong on EL panel. 
ITW is configured to take proton beam.
  
  330   Monday, May 06, 2013, 15:45 Bevan MossConditioning StationRepairTM3 55 pin connector removedTravis and I removed the 55 pin connector
from the service cap today. The feed through
was left in place as a new design for the
 20130506_55_pin_conector_removal_IMG_3530.JPG20130506_55_pin_conector_removal_IMG_3525.JPG20130506_55_pin_conector_removal_IMG_3532.JPG20130506_55_pin_conector_removal_IMG_3535.JPG 
  329   Friday, May 03, 2013, 09:53 chad fisherSouth Hot-CellRepairTM3 9 pin connector wiringWith the aid of nic new manipulator snap
fingers made by Maico the peek cable ties
restraining the 9 pin connector wiring to
 IMG_1047[1].JPGIMG_1048[1].JPGIMG_1050[1].JPG 