Message ID: 327     Entry time: Tuesday, April 30, 2013, 07:51
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM3 
Target/Number:  
Subject: Coil line flow check 

David and I checked circuits p and q (the water cooled coil ciruit) for flow this morning as, with the source tray still in the module, there was both a leak and a leak tight blockage. Both p and q allowed air flow through them confirming that the blockage was in the surce tray side of the system.

The heat shield circuit was also tested for flow and it passed.