ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
328
|
Thursday, May 02, 2013, 10:09 |
chad fisher | South Hot-Cell | Repair | TM3 | | Service tray water block leak check | David and I preformed a helium leak check
on the service tray waterblocks and verify
that no damage had been done during jig installation. |
|
327
|
Tuesday, April 30, 2013, 07:51 |
chad fisher | South Hot-Cell | Repair | TM3 | | Coil line flow check | David and I checked circuits p and q (the
water cooled coil ciruit) for flow this morning
as, with the source tray still in the module, |
|
326
|
Tuesday, April 30, 2013, 07:47 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 Source Tray Removal | The source tray has sucessfully been removed
from TM3.
I will put a report in the TM3 rev |
|
325
|
Monday, April 29, 2013, 15:58 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Source Tray Removal | Chad removed the source tray from TM3 today,
see attached picture (video was also taken).
There was some interference between the window |
|
324
|
Friday, April 26, 2013, 14:31 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 refurb E.O.D. | Service tray side of the waterblock jig
is installed and all locking tabs enagaed
save the heat shield circuit. Locking tab |
|
323
|
Friday, April 26, 2013, 11:20 |
chad fisher | South Hot-Cell | Repair | TM3 | | Water Block Jig (back half) | The back half of the water block jig (services
tray side) has been sucessfully located onto
the module. |
|
322
|
Wednesday, April 24, 2013, 14:09 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 Refurbishment E.O.D. | Optics tray has been removed from module.
Waterblock jig installation has commenced.
Of note, jig installation on TM3 has proven |
|
321
|
Wednesday, April 24, 2013, 11:48 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 Source Tray Removal | Work on TM3 source tray removal started
at 10:40 am today.
The containment box has been removed, |
|
320
|
Wednesday, April 24, 2013, 10:36 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 | The F-308's have been serviced and are
ready to be filled. All inspection records
are stored in docushare. |
|
319
|
Wednesday, April 24, 2013, 10:14 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 has been moved from the conditioning
station to the south hot cell, move went
well. |
|
318
|
Wednesday, April 24, 2013, 09:00 |
Bevan Moss | Conditioning Station | Development | | | New user testing | Controls has created a new user group
that can operate the conditioning station
but cannot use any of the bypasses or forces. |
|
317
|
Tuesday, April 23, 2013, 16:11 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | N/A | Chiller Fault 2 | During Testing it was noticed that
Fault 2 was indicated and one of the compressors
would not run. Fault 2 does not indicate |
|
316
|
Tuesday, April 23, 2013, 15:59 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Systems off | Both the Cooling Package and
Vacuum have been turned off in preparation
for the module move tomorrow |
|
315
|
Tuesday, April 23, 2013, 15:52 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Further HV Testing | Further HV testing was completed
today from ~2:00 until 3:00. The resistivity
of the water was 11.7 - 12.7 Mohm. The EE |
|
314
|
Tuesday, April 23, 2013, 13:48 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | EL testing | This morning the Einzel Lens was tested
on TM3 as the intention is to reuse this
piece of equipment. The EL was able to achieve |
|
313
|
Tuesday, April 23, 2013, 11:19 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | HV Test All common | A HV test was conducted yesterday
on TM3. There was no target and all items
were tied to common or ground. The conductivity |
|
312
|
Monday, April 22, 2013, 11:35 |
Bevan Moss | Conditioning Station | Repair | TM3 | N/A | TCS:DIF2 broken | The flow meter on the primary side
(TCS:DIF2) of the conditioning station is
broken. I investigated and there is flow, |
|
311
|
Monday, April 22, 2013, 11:31 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Cooling Package Started | Cooling Package was started at 9:25
this morning inlet conductivity is 0.08 Mohm
at 22.9C. Resistance reached 5.33 Mohm by |
|
310
|
Monday, April 22, 2013, 09:33 |
David Wang | Conditioning Station | Repair | TM3 | | Leak check TM3 at conditioning station | TM3 leak check at conditioning station
without target: TM3 all air to vacuum seals
have been leak checked . They are all good. |
|
309
|
Friday, April 19, 2013, 15:25 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Turbo Pumps Started |
|
|