Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 123 of 138  Not logged in ELOG logo
ID Date Author Category Type Module Target/Number Subject Text Attachments
  313   Tuesday, April 23, 2013, 11:19 Bevan MossConditioning StationStandard OperationTM3N/AHV Test All common A HV test was conducted yesterday
on TM3. There was no target and all items
were tied to common or ground. The conductivity
 TM3_40kV_22042013.txt22042013_TM3_40kV_Archiver.csvRGA_files.zip 
  312   Monday, April 22, 2013, 11:35 Bevan MossConditioning StationRepairTM3N/ATCS:DIF2 broken The flow meter on the primary side
(TCS:DIF2) of the conditioning station is
broken. I investigated and there is flow,
  
  311   Monday, April 22, 2013, 11:31 Bevan MossConditioning StationStandard OperationTM3N/ACooling Package Started Cooling Package was started at 9:25
this morning inlet conductivity is 0.08 Mohm
at 22.9C. Resistance reached 5.33 Mohm by
  
  310   Monday, April 22, 2013, 09:33 David WangConditioning StationRepairTM3 Leak check TM3 at conditioning stationTM3 leak check at conditioning station
without target: TM3 all air to vacuum seals
have been leak checked . They are all good.
  
  309   Friday, April 19, 2013, 15:25 Bevan MossConditioning StationStandard OperationTM3N/ATurbo Pumps Started

    

       
            
  
  308   Friday, April 19, 2013, 13:32 Bevan MossConditioning StationStandard OperationTM3N/ATurbo Pumps Started Both Turbo Pumps are now operational.   
  307   Friday, April 19, 2013, 10:51 Bevan MossConditioning StationStandard OperationTM3N/ARoughing Started 10:48With the Turbo pump replaced I have started
roughing at 10:48
  
  306   Friday, April 19, 2013, 10:48 Bevan MossConditioning StationMaintenanceTM3N/ATurbo Pump 2 replaced Turbo Pump 2 has been replaced on
TM3. I got a count of 350 on the sleeve of
my tank suit.
  
  305   Friday, April 19, 2013, 10:48 Bevan MossConditioning StationMaintenanceTM3N/ATurbo Pump 2 replaced Turbo Pump 2 has been replaced on
TM3. I got a count of 350 on the sleeve of
my tank suit.
  
  304   Wednesday, April 17, 2013, 15:17 Bevan MossConditioning StationStandard OperationTM3N/ATurbo Pumps Failed Both Turbo pumps on TM3 have failed.
They were both attempted to start in soft
mode. TP2 could only achieve ~19kpm and TP1
  
  303   Wednesday, April 17, 2013, 10:59 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the south hot cell to the conditioning station.
Move went well. The fields around the module
  
  302   Wednesday, April 17, 2013, 10:35 David WangITEStandard OperationTM4 I moved 5 shielding blocks back to ITE.5 shielding block had been moved 
back to ITE. The ITE is configured to take
proton beam.
  
  301   Wednesday, April 17, 2013, 09:26 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical checkElectrical check was performed on TM#3
with no target nothing was wrong was found,
but our megger does not go above 1000 volts
 TM3_DLB_9_PIN_CONN_ID_and_CHK.PDFTM3_Elec_CHK_no_target.PDF 
  300   Wednesday, April 17, 2013, 09:02 chad fisherSouth Hot-CellRepairTM3 TM3 ready for conditioning stationThe heat shield circuit blank offs have
been re-installed and front cover replaced.
TM3 is ready to move to the conditioning
  
  299   Tuesday, April 16, 2013, 11:20 chad fisherSouth Hot-CellRepairTM3 TM3 Referb. startFront containment box cover has been removed
and heat shield circuit blank offs removed
in preparation for installation of dummy
 IMG_3523.JPGIMG_3524.JPG 
  298   Tuesday, April 16, 2013, 11:10 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 has been moved from the NE Silo to
the south hot cell, move went well.
  
  297   Monday, April 15, 2013, 11:00 chad fisherSouth Hot-CellStandard OperationTM3 Items for TM3 dummy target installationNew gaskets and fasteners have been inserted
into the south hot cell in preparation for
installing the dummy target onto TM3 tomorrow.
  
  296   Friday, April 12, 2013, 10:32 David WangITWRepairTM1 ITW EXIT1 tank to module o-ring leak check.I leak checked new installed ITW EXIT1
tank to module o-ring.No leak had been found
. Also ,TM1 primary vessel air to vacuum
  
  295   Friday, April 12, 2013, 10:27 David WangITWStandard OperationTM1 I reconnected TM1 to ITW.TM1 has been reconnected in ITW. Water
interlock check for TM1 is done.
  
  294   Thursday, April 11, 2013, 07:18 David WangConditioning StationMaintenanceTM1Ta#29helium pressure tested all water lines in TM1 at CSOn April 08th, all water lines in TM1 had
been helium pressure tested(70psi) at conditioning
station. No leak had been found.
  
ELOG V2.9.2-2455