  321   Wednesday, April 24, 2013, 11:48 chad fisherSouth Hot-CellRepairTM3 TM3 Source Tray RemovalWork on TM3 source tray removal started
at 10:40 am today.
The containment box has been removed,
  
  320   Wednesday, April 24, 2013, 10:36 maicodallavalleSpent Target VaultMaintenance  F-308The F-308's have been serviced and are
ready to be filled. All inspection records
are stored  in docushare.
  
  319   Wednesday, April 24, 2013, 10:14 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 has been moved from the conditioning
station to the south hot cell, move went
well.
  
  318   Wednesday, April 24, 2013, 09:00 Bevan MossConditioning StationDevelopment  New user testing Controls has created a new user group
that can operate the conditioning station
but cannot use any of the bypasses or forces.
  
  317   Tuesday, April 23, 2013, 16:11 Bevan MossConditioning StationMaintenanceTM3N/AChiller Fault 2 During Testing it was noticed that
Fault 2 was indicated and one of the compressors
would not run. Fault 2 does not indicate
  
  316   Tuesday, April 23, 2013, 15:59 Bevan MossConditioning StationStandard OperationTM3N/ASystems off Both the Cooling Package and
Vacuum have been turned off in preparation
for the module move tomorrow
  
  315   Tuesday, April 23, 2013, 15:52 Bevan MossConditioning StationStandard OperationTM3N/AFurther HV Testing Further HV testing was completed
today from ~2:00 until 3:00. The resistivity
of the water was 11.7 - 12.7 Mohm. The EE
 TM3_BIAS_EE_CB_23042013.xlsxTM3_BIA_EE_CD_23042013_RGA_files.zip 
  314   Tuesday, April 23, 2013, 13:48 Bevan MossConditioning StationStandard OperationTM3N/AEL testingThis morning the Einzel Lens was tested
on TM3 as the intention is to reuse this
piece of equipment. The EL was able to achieve
 23042013_TM3_EL_RGA.zip23042013_TM3_EL_39.csv 
  313   Tuesday, April 23, 2013, 11:19 Bevan MossConditioning StationStandard OperationTM3N/AHV Test All common A HV test was conducted yesterday
on TM3. There was no target and all items
were tied to common or ground. The conductivity
 TM3_40kV_22042013.txt22042013_TM3_40kV_Archiver.csvRGA_files.zip 
  312   Monday, April 22, 2013, 11:35 Bevan MossConditioning StationRepairTM3N/ATCS:DIF2 broken The flow meter on the primary side
(TCS:DIF2) of the conditioning station is
broken. I investigated and there is flow,
  
  311   Monday, April 22, 2013, 11:31 Bevan MossConditioning StationStandard OperationTM3N/ACooling Package Started Cooling Package was started at 9:25
this morning inlet conductivity is 0.08 Mohm
at 22.9C. Resistance reached 5.33 Mohm by
  
  310   Monday, April 22, 2013, 09:33 David WangConditioning StationRepairTM3 Leak check TM3 at conditioning stationTM3 leak check at conditioning station
without target: TM3 all air to vacuum seals
have been leak checked . They are all good.
  
  309   Friday, April 19, 2013, 15:25 Bevan MossConditioning StationStandard OperationTM3N/ATurbo Pumps Started

    

       
            
  
  308   Friday, April 19, 2013, 13:32 Bevan MossConditioning StationStandard OperationTM3N/ATurbo Pumps Started Both Turbo Pumps are now operational.   
  307   Friday, April 19, 2013, 10:51 Bevan MossConditioning StationStandard OperationTM3N/ARoughing Started 10:48With the Turbo pump replaced I have started
roughing at 10:48
  
  306   Friday, April 19, 2013, 10:48 Bevan MossConditioning StationMaintenanceTM3N/ATurbo Pump 2 replaced Turbo Pump 2 has been replaced on
TM3. I got a count of 350 on the sleeve of
my tank suit.
  
  305   Friday, April 19, 2013, 10:48 Bevan MossConditioning StationMaintenanceTM3N/ATurbo Pump 2 replaced Turbo Pump 2 has been replaced on
TM3. I got a count of 350 on the sleeve of
my tank suit.
  
  304   Wednesday, April 17, 2013, 15:17 Bevan MossConditioning StationStandard OperationTM3N/ATurbo Pumps Failed Both Turbo pumps on TM3 have failed.
They were both attempted to start in soft
mode. TP2 could only achieve ~19kpm and TP1
  
  303   Wednesday, April 17, 2013, 10:59 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the south hot cell to the conditioning station.
Move went well. The fields around the module
  
  302   Wednesday, April 17, 2013, 10:35 David WangITEStandard OperationTM4 I moved 5 shielding blocks back to ITE.5 shielding block had been moved 
back to ITE. The ITE is configured to take
proton beam.
  