  2820   Friday, June 20, 2025, 10:46 Jason ZhangSafe Module ParkingMaintenance  Annual electrical and mechanical inspection of Safe Module Parking  An annual electrical
and mechanical inspection was performed on
  
  2819   Friday, June 20, 2025, 10:38 Jason ZhangSpent Target VaultMaintenance  Annual Inspection of Main and Mini Storage VaultsThe
annual inspection of the main storage vault
and mini storage vault was performed on 2025-06-20.
 Fray.jpg 
  2818   Thursday, June 19, 2025, 11:22 Travis CaveSpent Target VaultStandard Operation UC#48Spent Target Move The spent UC#48 target was removed
from the North Hot Cell, place in pail#303
and put into vault spot 2C, it was 35.4mSV/hr
 Target_Index_2025-06-19.pdf 
  2817   Wednesday, June 18, 2025, 11:32 Aaron TamNorth Hot-CellStandard OperationTM4C#5 SIS C#5 InstallationJune 17, 2025 - Aaron Tam, Brady
Borrmann, David Wang
Target handover 8:30am
 9x 
  2816   Wednesday, June 18, 2025, 11:23 Aaron TamNorth Hot-CellStandard OperationTM4UC#48 Pail#303UC#48 Removal from TM4, PIE, Spent Target Pail Loading June 17th, 2025 - Aaron Tam,
Brady Borrmann, David Wang, Travis Cave
UC#48 Removal 10:20am - 11:35am
 14x 
  2815   Wednesday, June 18, 2025, 09:28 Travis CaveConditioning StationStandard OperationTM4C#5Module move TM#4 with C#5 moved from the NHC
to the conditioning station.
  
  2814   Tuesday, June 17, 2025, 12:59 Frank SongNorth Hot-CellStandard OperationTM4C#5electrical check/leak check TM4 with new target number C#5 installed
had been leak/electric checked on NHC flange
in TH. see pic attached with pls.
 TM4_electric_and_leak_check_after_C#5_installed_2025-06-17.pdf 
  2813   Tuesday, June 17, 2025, 11:58 Frank SongITEStandard OperationTM4UC#48module disconnection TM4 with spent target UC#48 was disconnected
ang moved from ITE to NHC. see attachment
pls.
 TM4_with_spent_target_UC#48_disconnection_2025-06-17.pdf 
  2812   Tuesday, June 17, 2025, 11:32 Adam NewsomeNorth Hot-CellStandard OperationTM4UC#48Module moveTM#4 with UC#48 was moved from the East
target station to the North Hot Cell for
target exchange. 
  
  2811   Friday, June 13, 2025, 09:32 chad fisherSouth Hot-CellMaintenance  Quarter century clean upThursday June 12th two 55 gal drums filled
with waste from the SHC. 1 drum with metal
waste, 1 with mostly air hoses. Pre-filter
  
  2810   Tuesday, June 10, 2025, 11:50 Frank Song5 Shielding BlocksStandard Operation  shielding blocks transfer5 shielding blocks on ITE have been transferred
to ITW. 
  
  2809   Friday, June 06, 2025, 08:36 David WangCraneMaintenance  TH crane main hoist B starting delay issue appears again.TH crane main hoist B starting delay issue
appears again this Thursday. It is about
1 minute waiting time after power on the
  
  2808   Friday, May 23, 2025, 13:12 chad fisherManipulator MaintenanceRepair  SHC West manipulator tong cable replacementBroken tong cable on West manipulator (serial
#8106) replaced.
Wrist joint with broken cable was
  
  2807   Friday, May 16, 2025, 10:36 Frank SongITWStandard OperationTM2UC#49 Module Connection TM2 with UC#49 Febiad is connected
in ITW. Form attached.
 TM2_with_UC#49_connection_in_ITW_2025-05-15.pdf 
  2806   Wednesday, May 14, 2025, 09:45 Frank Song5 Shielding BlocksStandard OperationTM4UC#48 IGLISshielding blocks transfer 5 shielding blocks have been transferred
to ITE from storage area, the WP#I2025-05-14-2.
  
  2805   Tuesday, May 13, 2025, 13:13 Frank SongMAARepair  Swap out the target hall alpha CAM.AlphaCAM has been replaced and tested by
RPG in MAA target hall. (per Document-154779)
WorkPermit # I2025-05-13-3
  
  2804   Tuesday, May 13, 2025, 13:12 Frank SongMAARepair  Swap out the target hall alpha CAM. 
 
  
  2803   Monday, May 12, 2025, 09:17 David WangFacilitiesStandard Operation  BL2A MAA ASU TestMCR Travis Curucz , Frank, and I finished
BL2A MAA ASU test per document 154779. everything
works fine. Travis kept  the test document.
  
  2802   Wednesday, May 07, 2025, 13:41 Aaron TamNorth Hot-CellStandard OperationTM2UC#49 UC#49 SIS w/ Gasline InstallMay 7th, 2025 - Aaron Schmidt, Aaron Tam 
UC#49 Handover - good
 Cable_hopped_on_East_Manip.jpgunsuccessful_method_1.jpgunsuccessful_method_2.jpgGasline_Gasket_installed.jpg 
  2801   Tuesday, May 06, 2025, 14:40 Frank SongNorth Hot-CellStandard OperationTM2UC#49electrical check/leak check TM2 with new target UC#49 installed
is E/L checked on the flange of NHC in TH.
see attachment for detail.
 TM2_with_UC#49_electric_check_on_NHC_2025-05-06.pdf 