ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
2681
|
Monday, September 16, 2024, 08:23 |
chad fisher | North Hot-Cell | Repair | | | Model N Remote end #9352 reapir | On Friday, September 6, 2024 Model 'N'
remote arm #9352 was removed from the NHC
right side installed position to investigate |
|
|
2680
|
Thursday, September 12, 2024, 14:12 |
Adam Newsome | Waste Package/Ship | Development | | SiC#44 | Failed waste emplacement at CNL: Flask #22, Pail 275 (SiC#44) | On 2024-09-12, CNL reported difficulty
with lowering Pail 275 from F-308 flask #22
into their tile hole. The four other pails |
|
|
2679
|
Wednesday, September 11, 2024, 13:38 |
Adam Newsome | North Hot-Cell | Repair | | | Spare Manipulator - Y-axis motion not functioning | Update 2024-09-12:
C. Fisher confirms this is actually normal
behaviour. The Y-axis motion is inhibited |
|
|
2678
|
Wednesday, September 11, 2024, 07:59 |
David Wang | Conditioning Station | Standard Operation | TM4 | TiC#9 | TM4 has been moved from SHC to TCS. | TM4 has been moved from SHC to TCS. The
move is smooth. |
|
|
2677
|
Tuesday, September 10, 2024, 12:41 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | TiC#9 | electrical check/leak check | TM4 with new target TiC#9 Surface
installed in SHC was leak/electric checked
before moving to TCS. See attached pic pls. |
|
|
2676
|
Tuesday, September 10, 2024, 12:41 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#9 | Target TiC#9 HP-SIS installed onto TM4 | September 9, 2024 - Aaron Tam
Water from waterline found
puddled on source-tray and containment box.
|
|
|
2675
|
Friday, September 06, 2024, 14:28 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68(Spare) | Ta#68(Spare) removed from TM4 and into Anteroom | September 5, 2024 -AT
Plastic and clean target
tray added to SHC
TM4 |
|
|
2674
|
Friday, September 06, 2024, 10:01 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#67 back up. | TM4 has been moved from SMP to SHC. | TM4 has been moved from SMP to SHC. The
move is smooth. |
|
|
2673
|
Thursday, September 05, 2024, 12:50 |
Adam Newsome | Crane | Maintenance | | | Overhead crane: up/down hoist delayed start issue | D. Wang reports that recently the overhead
crane has been exhibiting a delayed start
(approx. 1 min) when operating in local mode. |
|
|
2672
|
Tuesday, September 03, 2024, 11:40 |
David Wang | ITW | Standard Operation | TM3 | TiC#8 | TM3 has been moved from ITW to S-W silo. | TM3 has been moved from ITW to S-W silo.
The move is smooth. |
|
|
2671
|
Tuesday, August 27, 2024, 13:30 |
Frank Song | ITW | Maintenance | TM3 | TiC#8 | module disconnection | TM3 is disconnected and all water
lines are purged/refilled with 50psi Nitrogen.
Pls see pics attached with. |
|
|
2670
|
Monday, August 26, 2024, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#10 | Spent Target Move | Nb#10 was placed in pail#295 and
moved from the south hot cell to the spent
target vault, spot 4A, it was 230uSv/hr when |
|
|
2669
|
Wednesday, August 21, 2024, 10:53 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#7 | Spent Target Move | TIC#7 was placed in pail #294 and
then moved from the south hot cell to the
spent target vault spot 4B. It was 82.3mSv/hr |
|
|
2668
|
Tuesday, August 20, 2024, 11:53 |
Carla Babcock | South Hot-Cell | Standard Operation | | Nb#10 | Nb#10 PIE | Nb#10 never worked online - repeller had
no effect on the beam and one of the RF wires
was touching HVC. Max 60pA was seen on the |
|
|
2667
|
Tuesday, August 20, 2024, 11:36 |
Carla Babcock | South Hot-Cell | Standard Operation | | TiC#7 | TiC#7 PIE | TiC#7 failed after two weeks of operations
- measurements in the electrical room indicated
that the negative side of the CHT was broken |
|
|
2666
|
Monday, August 19, 2024, 15:29 |
Frank Song | ITW/ITE | Standard Operation | TM2 | Ta#67 | shielding blocks transfer | 5 shielding blocks have been transferred
from ITW to ITE, MAA has been secured after
moving. |
|
|
2665
|
Monday, August 19, 2024, 09:32 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#68 | TM4 has been moved from SHC to TCS. | TM4 has been moved from SHC to TCS. The
move is successful. |
|
|
2664
|
Friday, August 16, 2024, 15:32 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | Ta#68 LP-SIS | Target Ta#68 loaded onto TM4 | Target Ta#68 loaded onto TM4
-leak check passed
-Target electrode conductor screws |
|
|
2663
|
Friday, August 16, 2024, 15:28 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#7 HP-FEBIAD | TiC#7 Target Removed from TM4 | TiC#7 Target Removed from TM4. -
Photos attached
TiC#7 Currently sitting in SHC waiting |
|
|
2662
|
Friday, August 16, 2024, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#68 | electrical check/leak check | New target Ta#68 is installed on
TM4 and be leak/electric checked. Pls see
attachment. |
|