  2408   Tuesday, January 24, 2023, 08:46 David WangITEStandard OperationTM4UCx#41TM4 has been disconnected in ITE. TM 4 has been disconnected in ITE. 
See attachment for disconnection checklist.
 UCx#41_TM4_disconnection_checklist_in_ITE.pdf 
  2407   Tuesday, January 24, 2023, 07:26 David WangConditioning StationStandard Operation  TH floor moping and garbage collelctions.Plant group and us  finished TH floor
mopping and garbage collections last Wednesday.
Th moping head had 800 count after using.
  
  2406   Tuesday, January 24, 2023, 07:21 David WangITWMaintenance  ITW pit general clean up.  ITW  was cleaned with vacuum
canister in Jan 10th. HV  cage inside
and blue  nylon insulators were wiped. 
  
  2405   Tuesday, January 24, 2023, 07:17 David WangITEStandard OperationTM4UCx#41TM4 water lines helium pressure test 2023. TM4 water lines helium pressure test was
done yesterday at ITE. All water lines were
air purged one day ahead  for the test.
 TM4_water_lines_helium_presuure_test_2023.pdf 
  2404   Wednesday, January 11, 2023, 11:34 Travis CaveSpent Target VaultStandard Operation UC#40Spent Target Move UC#40 was moved from the north hot
cell to the spent target vault. It was placed
in pail #278 put in spot 1B and was 15.6
 Target_Index_2023-01-11.pdf 
  2403   Tuesday, January 10, 2023, 10:15 Frank SongSafe Module ParkingStandard OperationTM2UCx40 removedTM2 electrical check with no target attached on SW silo TM2 with no target on SW silo be
electrical checked right after module moving.
 TM2_electrical_check_without_UCx40_on_SW_silo.png 
  2402   Monday, January 09, 2023, 14:19 Frank SongITWStandard OperationTM2UCx#40TM2 with UCx40 disconnection in ITW TM2 with target UCx40 was disconnected
in ITW and moved to NHC.
 TM2_with_UCx40_disconnection_in_ITW.png 
  2401   Friday, January 06, 2023, 10:38 David WangITWStandard OperationTM2 ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test. ITW
 and TM2 primary and secondary vacuum
 ITW_vacuum_leak_check_2023.pdf 
  2400   Friday, January 06, 2023, 09:41 Adam NewsomeSpent Target VaultStandard Operation  Pails moved to mini-storage vaultThe following three pails were moved from
the main storage vault to the mini-storage
vault:
 Target_Index_2023-01-06.pdf 
  2399   Friday, December 16, 2022, 16:39 Adam NewsomeCraneStandard Operation  Crane powered off for holidays[edit 2023-01-03] The crane was powered
back on this morning - there do  not appear
to be any faults and it seems that the crane
  
  2398   Friday, December 16, 2022, 16:35 Adam NewsomeSpent Target VaultStandard Operation  Pails measured, moved to mini-storage vaultThe following five pails were moved to
the mini-storage vault today under work permit
I2022-12-16-1:
 Target_Index_2022-12-16.pdf 
  2397   Thursday, December 01, 2022, 13:45 Carla BabcockNorth Hot-CellStandard OperationTM4C#4Post irradiation inspection C#4Post irradiation inspection of C#4 which
was running in TM4/ITE was conducted at the
NHC on Nov. 22 2022.
 20221122_152435.jpg20221122_153033.jpg20221122_152407.jpg 
  2396   Thursday, December 01, 2022, 08:20 Frank SongITEStandard OperationTM4UCx#41Module Connection TM4 with UCx#41 was connected in
ITE on Tuesday (2022-11-29) 
 TM4_with_UCx#41_connection_in_ITE.png 
  2395   Tuesday, November 29, 2022, 11:03 Adam NewsomeITEStandard OperationTM4C#4TM4 Move - TCS to ITETM4 was moved from the Conditioning Station
to the East Target Station with C#4. 
  
  2394   Thursday, November 24, 2022, 11:32 Adam NewsomeSpent Target VaultStandard OperationTM4C#4C#4 Spent Target Moved to Storage VaultC#4 spent target was moved to the storage
vault, in pail 277. Dose rate at approximately
1 m when leaving the hot cell was 164 mSv/h.
 Target_Index_2022-11-24.pdf 
  2393   Wednesday, November 23, 2022, 12:10 Adam NewsomeConditioning StationStandard OperationTM4UCx#41TM4 Move - NHC to TCSTM4 was moved from the North Hot Cell to
the Target Conditioning Station with UCx#41.
  
  2392   Wednesday, November 23, 2022, 11:27 Frank SongNorth Hot-CellStandard OperationTM4UCx#41electric and leak check after new target installed an electric check and leak check
done on NHC, TM4 with new target UCx#41 is
ready moving to TCS.
 TM4_with_UCx#41_electric_and_leak_check_on_NHC.png 
  2391   Tuesday, November 22, 2022, 14:53 Carla BabcockNorth Hot-CellMaintenanceTM4 Multipin connector alignment pin on TM4 module looseThe pin on TM4 has become loose again,
making it very difficult to remove the multipin
connector with the last target, C#4. For
  
  2390   Tuesday, November 22, 2022, 12:41 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check TM4 with C#4 is checked on NHC
right after moving from ITE.
 TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png 
  2389   Tuesday, November 22, 2022, 10:37 Adam NewsomeNorth Hot-CellStandard OperationTM4 TM4 Move - ITE to NHCTM4 was moved from ITE to NHC with C#4.
  