2188
|
Tuesday, February 16, 2021, 14:00 |
Adam Newsome | Crane | Development | | | Crane pendant upgrade | The crane pendant for the main hoist was
upgraded to a FLEX EX2 style pendant by Canco
Cranes. The installation work was performed |
|
2187
|
Friday, February 12, 2021, 07:07 |
David Wang | ITE | Maintenance | | | ITW and ITE clean up. | Vacuum cleaned ITW and ITE station.
|
|
2186
|
Wednesday, February 10, 2021, 13:30 |
David Wang | Safe Module Parking | Standard Operation | | | TM2 and TM4 electrical check without targets. | TM2 at SMP under vacuum. TM4 at silo.
Frank and I did the tests. Everything is
fine on TM4 check. On TM2, all |
|
2185
|
Wednesday, February 10, 2021, 11:34 |
David Wang | Assembly/Bench Test | Standard Operation | | | Old resin can and 2A window RH clamp field measurement at silo. | Old resin can: 0.5 meter 360 degree
rotation above silo area, 350u sv/hr.
On contact 3.0 to 3.5 msv/hr. |
|
2184
|
Wednesday, February 03, 2021, 09:14 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 from TCS to SW silo. | TM4 is moved from TCS to SW silo. The moving
is smooth.
|
|
2183
|
Wednesday, January 27, 2021, 14:30 |
David Wang | Cooling | Development | | | High active water system purging | High active water are purged to holding
tank at B2 level. There should be around
48 gallons are purged out of system. No purging |
|
2182
|
Monday, January 25, 2021, 12:33 |
David Wang | ITW | Standard Operation | | | ITW bias HV test | Ramp up ITW bias to 57KV. no spark. 200uA
leaking current at 57KV. The test is done
without target module in station. |
|
2181
|
Monday, January 25, 2021, 10:57 |
David Wang | South Hot-Cell | Repair | TM4 | | TM4 steers short investigation. | Cables were disconnected for steers in
containment box. The Megga measurement (500V)
result from the top of the module: |
|
2180
|
Friday, January 22, 2021, 12:34 |
David Wang | ITE | Standard Operation | | | ITE HV test. | ITE annual HV test is done. No module in
station. The bias power supply has been ramped
up to 49KV on control page. We still have |
|
2179
|
Tuesday, January 19, 2021, 11:32 |
Travis Cave | Safe Module Parking | Standard Operation | TM2 | Nb#9 | Module move | TM#2 with Nb#9 was moved from ITW
to SHC and then with no target it was moved
from the SHC to the SMP. |
|
2178
|
Monday, January 18, 2021, 12:29 |
David Wang | ITW | Standard Operation | TM2 | Nb#9 | ITW vacuum and TM2 water lines leak check . | ITW primary and secondary vacuum vessel
leak check are done. There is a 5XE-8 atm.cc/sec
leak on Exit service cap NW side square panel. |
|
2177
|
Friday, January 08, 2021, 09:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#61 | Module move | TM#4 with Ta#61 has been moved from
the east target station to the south hot
cell. |
|
2176
|
Wednesday, January 06, 2021, 10:39 |
David Wang | ITE | Standard Operation | TM4 | | ITE and TM4 annual leak check. | Frank and I finished ITE and TM4 primary
and secondary vacuum vessel leak
check. LD bease leak rate 0.0x-9atm.cc/sec. No leak has been found.Also, All TM4 water lines have been pressurized with 70psi helium fro 3 minutes on each circuit. All water lines i |
|
2175
|
Monday, January 04, 2021, 12:13 |
Adam Newsome | Conditioning Station | Development | TM3 | | TM3 Move | TM3 was remotely moved from the
South Hot Cell to the conditioning station.
No containment box. |
|
2174
|
Thursday, December 24, 2020, 09:00 |
Matthew Gareau | North Hot-Cell | Development | | | NHC USB connection | |
|
2173
|
Monday, December 21, 2020, 11:22 |
Adam Newsome | Crane | Standard Operation | | | Crane Shutdown for Power Outage | The Target Hall Crane has been shut down
in preparation for the power outage tomorrow
(Dec 22). Power will be restored on Dec 23. |
|
2172
|
Thursday, December 10, 2020, 15:07 |
Adam Newsome | South Hot-Cell | Development | TM3 | | TM3 Move | TM3 was remotely moved from the conditioning
station to the South Hot Cell. No containment
box. |
|
2171
|
Monday, December 07, 2020, 12:20 |
Adam Newsome | Conditioning Station | Development | TM3 | | TM3 Move | TM3 has been moved from
the South Hot Cell to the
Conditioning Station. No containment box. |
|
2170
|
Wednesday, November 25, 2020, 09:05 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | Module Move | TM3 has been moved from
the Silo to the South Hot Cell. |
|
2169
|
Tuesday, November 24, 2020, 12:56 |
David Wang | ITW | Standard Operation | TM2 | Nb#9 | TM2 has been connected in ITW | TM2 has been connected to ITW. Turbo pumps
are stared. ITW pumping down is fine so far. |
|