  2175   Monday, January 04, 2021, 12:13 Adam NewsomeConditioning StationDevelopmentTM3 TM3 MoveTM3 was remotely moved from the
South Hot Cell to the conditioning station.
No containment box.
  
  2174   Thursday, December 24, 2020, 09:00 Matthew GareauNorth Hot-CellDevelopment   NHC USB connection    
  2173   Monday, December 21, 2020, 11:22 Adam NewsomeCraneStandard Operation  Crane Shutdown for Power OutageThe Target Hall Crane has been shut down
in preparation for the power outage tomorrow
(Dec 22). Power will be restored on Dec 23.
  
  2172   Thursday, December 10, 2020, 15:07 Adam NewsomeSouth Hot-CellDevelopmentTM3 TM3 MoveTM3 was remotely moved from the conditioning
station to the South Hot Cell. No containment
box.
  
  2171   Monday, December 07, 2020, 12:20 Adam NewsomeConditioning StationDevelopmentTM3 TM3 MoveTM3 has been moved from
the South Hot Cell to the
Conditioning Station. No containment box.
  
  2170   Wednesday, November 25, 2020, 09:05 Adam NewsomeSouth Hot-CellStandard OperationTM3 Module MoveTM3 has been moved from
the Silo to the South Hot Cell.
  
  2169   Tuesday, November 24, 2020, 12:56 David WangITWStandard OperationTM2Nb#9TM2 has been connected in ITWTM2 has been connected to ITW. Turbo pumps
are stared. ITW pumping down is fine so far.
 TM2_Nb#9_module_connection_checklist.pdf 
  2168   Tuesday, November 24, 2020, 09:37 Adam NewsomeITWStandard OperationTM2 Module MoveTM2 has been moved from
the Conditioning Station to ITW. 
  
  2167   Thursday, November 19, 2020, 12:00 Adam NewsomeSpent Target VaultStandard Operation C#2Spent Target MoveC#2 has been moved from the south hot cell
to the spent target  vault. It is in spot
8A of the vault in pail # 235 and was 185
  
  2166   Thursday, November 19, 2020, 09:00 David WangConditioning StationStandard OperationTM2Nb#6Helium pressure check on TM2 HS line at TCS.LD 0.0 Xe-9 atm.cc/sec , 70 psi helium
3 minutes.  No leak.
  
  2165   Wednesday, November 18, 2020, 15:28 David WangSouth Hot-CellStandard OperationTM2Nb#6electrical check and HS leak check.Everything looks good. A still short to
P before target installation. We will float
P,Q as before on module top. 
 Screenshot_2020-11-18_Mail_-_David_Wang_-_Outlook.png 
  2164   Tuesday, November 17, 2020, 10:17 Adam NewsomeSouth Hot-CellStandard OperationTM2 Module MoveTM2 has been moved from ITW to the South
Hot Cell. 
  
  2163   Thursday, November 12, 2020, 10:02 Travis CaveSpent Target VaultStandard Operation UC#31Spent Target Move UC#31 has been moved from the south
hot cell to the spent target vault. It is
in spot 8B of the vault in pail # 224 and
  
  2162   Thursday, November 05, 2020, 10:48 Travis CaveITEStandard OperationTM4Ta#61Module move TM#4 with Ta#61 has been moved from
the south hot cell to the east target station.
  
  2161   Thursday, November 05, 2020, 10:23 David WangSpent Target VaultStandard Operation  TM2 old source tray and TM4 optic tray in vault tray#9.TM2 old source tray and TM4 optic tray
are stored together in vault tray#9. The
fielding measurement at SHC post 0.5 meter
  
  2160   Tuesday, November 03, 2020, 10:52 Travis CaveSouth Hot-CellStandard OperationTM4UC#31Module move TM#4 with UC#31 has been moved from
the east target station to the south hot
cell.
  
  2159   Friday, October 30, 2020, 09:02 Travis CaveSpent Target VaultStandard Operation Ta#48,51,54 SiC#35, and UC#25Repacking of the targets. Targets Ta#48,51,54 SiC#35,
and UC#25 were repacked and placed in the
mini vault. In the following order back to
 Target_Index_2020-10-30.pdf 
  2158   Tuesday, October 27, 2020, 11:46 Matthew GareauNorth Hot-CellRepair  Ratcheting repair issues with both left and right master  

  
  2157   Tuesday, October 20, 2020, 10:14 Travis CaveITWStandard OperationTM2C#2Module move TM#2 with C#2 has been moved from
the south hot cell to the West Target Station.
  
  2156   Monday, October 19, 2020, 12:52 David WangSouth Hot-CellStandard OperationTM2C#2TM2 electrical and leak check at SHCTM2 electrical check and leak check are
done at SHC with C#2 target installed. The
results are good.  
 Tm3_bunker_set_up_018.JPG 