  2161   Thursday, November 05, 2020, 10:23 David WangSpent Target VaultStandard Operation  TM2 old source tray and TM4 optic tray in vault tray#9.TM2 old source tray and TM4 optic tray
are stored together in vault tray#9. The
fielding measurement at SHC post 0.5 meter
  
  2160   Tuesday, November 03, 2020, 10:52 Travis CaveSouth Hot-CellStandard OperationTM4UC#31Module move TM#4 with UC#31 has been moved from
the east target station to the south hot
cell.
  
  2159   Friday, October 30, 2020, 09:02 Travis CaveSpent Target VaultStandard Operation Ta#48,51,54 SiC#35, and UC#25Repacking of the targets. Targets Ta#48,51,54 SiC#35,
and UC#25 were repacked and placed in the
mini vault. In the following order back to
 Target_Index_2020-10-30.pdf 
  2158   Tuesday, October 27, 2020, 11:46 Matthew GareauNorth Hot-CellRepair  Ratcheting repair issues with both left and right master  

  
  2157   Tuesday, October 20, 2020, 10:14 Travis CaveITWStandard OperationTM2C#2Module move TM#2 with C#2 has been moved from
the south hot cell to the West Target Station.
  
  2156   Monday, October 19, 2020, 12:52 David WangSouth Hot-CellStandard OperationTM2C#2TM2 electrical and leak check at SHCTM2 electrical check and leak check are
done at SHC with C#2 target installed. The
results are good.  
 Tm3_bunker_set_up_018.JPG 
  2155   Friday, October 16, 2020, 10:36 Travis CaveITWStandard OperationTM2Ta#60Module move TM#2 with Ta#60 is now in the south
hot cell.
  
  2154   Thursday, October 15, 2020, 12:48 Travis CaveITEStandard OperationTM4UC#31Module move TM#4 is now back in the east target
station.
  
  2153   Tuesday, October 13, 2020, 10:16 Travis CaveITERepairTM4UC#31Module move TM#4 is now in the south hot cell
from the east target station.
  
  2152   Wednesday, September 30, 2020, 09:54 Travis CaveSouth Hot-CellStandard OperationTM3no targetModule move TM#3 is now in the south hot cell.   
  2151   Tuesday, September 29, 2020, 14:28 David WangSouth Hot-CellStandard OperationTM4UC#31TM4 UC#31 Electrical check and HS leak checkTm4 UCx 31# electrical check result. See
attachment.
 TM4_UCx31_elctrical_and_leak_check_at_SHC..pdfScanned_from_a_Xerox_Multifunction_Printer.pdf 
  2150   Tuesday, September 29, 2020, 12:29 Travis CaveITEStandard OperationTM4UC#31Module move Module move of TM#4 with UC#31 was
finished to today at around 10:30AM.
  
  2149   Tuesday, September 29, 2020, 12:12 David WangITERepairTM4 TM4 steerers staus after" left " grounding issue, and first stage investigation
Left (short) is switched with bottom. So
on module:
  
  2148   Thursday, September 24, 2020, 11:25 David WangConditioning StationStandard OperationTM4UC#31TM4 HS line leak check at SHC and TCS.Both helium spray and helium pressurize
on TM4 HS line withUCx31 target are done
at SHC and TCS. No leak.
  
  2147   Thursday, September 24, 2020, 10:34 Travis CaveSpent Target VaultStandard Operation UC#30Spent Target Move UC#30 has been placed into the spent
target vault, it was placed in pail 238 and
in spot 1A of the vault. It was 81.5 mSv/hr
 Target_Index_2020-09-24.pdf 
  2146   Wednesday, September 23, 2020, 10:56 chad fisherSouth Hot-CellStandard OperationTM4UC#31 P2NUc#30 removed UC#31 P2N installedUCx#30 has been removed from TM#4 and put
in a can with argon. 5(10) pin connector
had to have guide screws removed to be uninstalled.
  
  2145   Tuesday, September 22, 2020, 10:56 Travis CaveSouth Hot-CellStandard OperationTM4UC#30Module move TM#4 with UC#30 has been moved from
ITE to the south hot cell.
  
  2144   Friday, September 11, 2020, 11:25 Travis CaveITWStandard OperationTM2Ta#60Module move Both the west entrance module and
TM#2 with Ta#60 have been moved back into
ITW.
  
  2143   Tuesday, September 08, 2020, 10:37 Travis CaveITWStandard Operation no targetEntrance module move The West Entrance module has been
moved to the south hot cell for repairs.
  
  2142   Thursday, August 27, 2020, 13:18 Anders MjosConditioning StationMaintenanceTM2 New Power Supply installed for TGHTArthur installed a new Magna Power PS for
the TGHT yesterday. The old power supply
has been moved to Evaporator 2. The power
  
ELOG V2.9.2-2455