  2128   Monday, July 27, 2020, 10:00 Travis CaveSouth Hot-CellMaintenance  Entrance module move The West Entrance module has been
moved from the west target station to the
south hot cell for repairs.
  
  2127   Friday, July 24, 2020, 09:43 Travis CaveConditioning StationMaintenanceTM2Graphite #1Module move TM#2 has been moved from the west
station to the conditioning station. ITW
entrance module moved will take place on
  
  2126   Tuesday, July 21, 2020, 14:22 Adam NewsomeSpent Target VaultStandard Operation  Emergency Close Mechanism TestThe emergency close mechanism for the Storage
Vault door was tested by Adam Newsome and
Travis Cave. The door was opened to its fully
  
  2125   Thursday, July 16, 2020, 10:20 Adam NewsomeSafe Module ParkingMaintenance  SMP: Annual Electrical InspectionAn electrical systems check was performed
on the SMP by Adam Newsome and Travis Cave.
Overall, there were no issues to
  
  2124   Monday, July 13, 2020, 10:01 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the conditioning
station to the silo.
 
  
  2123   Tuesday, July 07, 2020, 17:43 Carla BabcockITEDevelopmentTM4 RF tests on new IG-LIS wiringTested RF from RF driver into new IGLIS
wires at ITE. Used 5V, 1MHz (2MHz setting
because of internal halving issue).
  
  2122   Tuesday, July 07, 2020, 09:16 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the silo
to the conditioning station, where David
and Frank will start on the gutting of the
  
  2121   Monday, July 06, 2020, 12:20 David WangITWStandard OperationTM2C#1Five shielding blocks to ITWFive shielding blocks are transferred to
ITW
  
  2120   Monday, July 06, 2020, 07:54 David WangITEStandard OperationTM4UCx 30TM4 has been connected in ITE connection TM4 has been connected in ITE. Vacuum pumping
down is good so far.
 Tm4_UCx_30_connection_checklist.pdf 
  2119   Friday, July 03, 2020, 14:08 Travis CaveITEStandard OperationTM4UC#30Module move TM#4 with UC#30 has been moved from
the south hot cell to the east target station.
  
  2118   Friday, July 03, 2020, 13:23 David WangSouth Hot-CellStandard OperationTM4UCx#30TM4 UCx#30 Electrical check and HS leak checkElectrical and leak check are good. See
attachment. 
 TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf 
  2117   Friday, July 03, 2020, 08:46 chad fisherSouth Hot-CellStandard OperationTM4UcX#30UCx#30 installed onto tm4UCx#30 has been installed onto TM4 with
new high current fasteners torqued to 130
in lbs.
  
  2116   Friday, July 03, 2020, 07:03 David WangSouth Hot-CellStandard OperationTM4BEFORE TARGET INSTALLATIONELECTRICAL CHECK BEFORE TARGET INSTALLATION.PQ SHORT TO RU. A TO PQ 1.8 M OHM AT 500
V. THE REST ARE OL
 TM4_ELECTRICAL_CHECK_20220_07_02.pdf 
  2115   Friday, July 03, 2020, 06:57 David WangITWStandard OperationTM2C#1TM2 CONNECTION CHECKLIST SEE ATTACHMENTS. EVERYTHING IS GOOD.  TM2_C#1_CONNECTION_CHECKLIST.pdf 
  2114   Tuesday, June 30, 2020, 10:18 Travis CaveSouth Hot-CellStandard OperationTM4Test Proton to Neutron TargetModule move TM#4 has been moved from the east
target station to the south hot cell.
  
  2113   Monday, June 29, 2020, 10:09 David WangITEStandard OperationTM4P2N test.ITE turbo pumps are stoppedITE venting is in processing.   
  2112   Friday, June 26, 2020, 15:00 David WangITWMaintenance  ITW TP1 and TP1S.ITW TP1 can not be started yesterday. Also,
TP1S was difficult to start , and had a high
current draw after.  We changed both
  
  2111   Friday, June 26, 2020, 10:43 Adam NewsomeSpent Target VaultStandard Operation  Routine mechanical inspection: storage vault and mini-storage drive systemsAn inspection was performed on drive systems
for both storage vaults (main and mini) by
Adam Newsome and Dan McDonald. The functionality
 IMG_20200626_092538.jpgIMG_20200626_093208.jpgIMG_20200626_093924.jpgIMG_20200626_093951.jpg 
  2110   Thursday, June 25, 2020, 09:45 Travis CaveITWStandard OperationTM2Graphite #1Module move TM#2 with the graphite #1 target
has been moved from the south hot cell to
the west target station.
  
  2109   Tuesday, June 23, 2020, 10:56 David WangSafe Module ParkingStandard Operation  SMP annual service. Dan and I did the SMP annual  maintenance
service today. Lid open/close , vessel rotation
and limit switch check, lubricate chains,
  