2128
|
Monday, July 27, 2020, 10:00 |
Travis Cave | South Hot-Cell | Maintenance | | | Entrance module move | The West Entrance module has been
moved from the west target station to the
south hot cell for repairs. |
|
2127
|
Friday, July 24, 2020, 09:43 |
Travis Cave | Conditioning Station | Maintenance | TM2 | Graphite #1 | Module move | TM#2 has been moved from the west
station to the conditioning station. ITW
entrance module moved will take place on |
|
2126
|
Tuesday, July 21, 2020, 14:22 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Emergency Close Mechanism Test | The emergency close mechanism for the Storage
Vault door was tested by Adam Newsome and
Travis Cave. The door was opened to its fully |
|
2125
|
Thursday, July 16, 2020, 10:20 |
Adam Newsome | Safe Module Parking | Maintenance | | | SMP: Annual Electrical Inspection | An electrical systems check was performed
on the SMP by Adam Newsome and Travis Cave.
Overall, there were no issues to |
|
2124
|
Monday, July 13, 2020, 10:01 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the conditioning
station to the silo.
|
|
2123
|
Tuesday, July 07, 2020, 17:43 |
Carla Babcock | ITE | Development | TM4 | | RF tests on new IG-LIS wiring | Tested RF from RF driver into new IGLIS
wires at ITE. Used 5V, 1MHz (2MHz setting
because of internal halving issue). |
|
2122
|
Tuesday, July 07, 2020, 09:16 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the silo
to the conditioning station, where David
and Frank will start on the gutting of the |
|
2121
|
Monday, July 06, 2020, 12:20 |
David Wang | ITW | Standard Operation | TM2 | C#1 | Five shielding blocks to ITW | Five shielding blocks are transferred to
ITW |
|
2120
|
Monday, July 06, 2020, 07:54 |
David Wang | ITE | Standard Operation | TM4 | UCx 30 | TM4 has been connected in ITE connection | TM4 has been connected in ITE. Vacuum pumping
down is good so far. |
|
2119
|
Friday, July 03, 2020, 14:08 |
Travis Cave | ITE | Standard Operation | TM4 | UC#30 | Module move | TM#4 with UC#30 has been moved from
the south hot cell to the east target station. |
|
2118
|
Friday, July 03, 2020, 13:23 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#30 | TM4 UCx#30 Electrical check and HS leak check | Electrical and leak check are good. See
attachment. |
|
2117
|
Friday, July 03, 2020, 08:46 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UcX#30 | UCx#30 installed onto tm4 | UCx#30 has been installed onto TM4 with
new high current fasteners torqued to 130
in lbs. |
|
2116
|
Friday, July 03, 2020, 07:03 |
David Wang | South Hot-Cell | Standard Operation | TM4 | BEFORE TARGET INSTALLATION | ELECTRICAL CHECK BEFORE TARGET INSTALLATION. | PQ SHORT TO RU. A TO PQ 1.8 M OHM AT 500
V. THE REST ARE OL |
|
2115
|
Friday, July 03, 2020, 06:57 |
David Wang | ITW | Standard Operation | TM2 | C#1 | TM2 CONNECTION CHECKLIST | SEE ATTACHMENTS. EVERYTHING IS GOOD. |
|
2114
|
Tuesday, June 30, 2020, 10:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Test Proton to Neutron Target | Module move | TM#4 has been moved from the east
target station to the south hot cell. |
|
2113
|
Monday, June 29, 2020, 10:09 |
David Wang | ITE | Standard Operation | TM4 | P2N test. | ITE turbo pumps are stopped | ITE venting is in processing. |
|
2112
|
Friday, June 26, 2020, 15:00 |
David Wang | ITW | Maintenance | | | ITW TP1 and TP1S. | ITW TP1 can not be started yesterday. Also,
TP1S was difficult to start , and had a high
current draw after. We changed both |
|
2111
|
Friday, June 26, 2020, 10:43 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Routine mechanical inspection: storage vault and mini-storage drive systems | An inspection was performed on drive systems
for both storage vaults (main and mini) by
Adam Newsome and Dan McDonald. The functionality |
|
2110
|
Thursday, June 25, 2020, 09:45 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #1 | Module move | TM#2 with the graphite #1 target
has been moved from the south hot cell to
the west target station. |
|
2109
|
Tuesday, June 23, 2020, 10:56 |
David Wang | Safe Module Parking | Standard Operation | | | SMP annual service. | Dan and I did the SMP annual maintenance
service today. Lid open/close , vessel rotation
and limit switch check, lubricate chains, |
|