  ID Date Author Category Type Module Target/Number Subject Text Attachments
  2041   Tuesday, January 07, 2020, 08:02 David WangCoolingStandard Operation  Switch on HALCW MP2HALCW MP2 is switched on this morning after
yesterday cooling tower maintenance. LALCW
P5 and P6 pumps are started by isac operator 
  
  2040   Friday, January 03, 2020, 13:15 Adam NewsomeCraneRepair  Target Hall Crane PLC Module/Battery ReplacementThe Target Hall Crane bridge and trolley motion
was lost after a period of the crane having
power disconnected over winter holidays.
  
  2039   Thursday, January 02, 2020, 10:10 David WangCraneStandard Operation  TH crane issue.Target hall crane does not work properly
after TH crane main power is switched off
during  Christmas time in control room. I
  
  2038   Thursday, January 02, 2020, 09:55 David WangCoolingStandard Operation  I turned on HALC water pump MP2.HALCW MP2 is switched onnow. There is a
small amount of air trapped in system. The
pump works fine.  Water level and system
  
  2037   Thursday, December 12, 2019, 14:39 Isaac EarleSafe Module ParkingDevelopment  SMP assembly shifted 1.0" northThe SMP assembly was shifted approximately
1.0" north today by pushing it, braced
against the south wall, using a 100 Ton capacity
  
  2036   Tuesday, December 03, 2019, 12:45 Adam NewsomeSpent Target VaultStandard Operation SiC#38SiC#38 in Pail 205 moved to Storage Vault: 4BSiC#38 in Pail 205 was moved to section 4B
of the storage vault. Dose rate when retrieving
from Hot Cell was 22.2 mSv/h. 
 Target_Index_2019-12-03.pdf 
  2035   Friday, November 29, 2019, 13:10 David WangITEStandard OperationTM2SiC 39# febiadTM2 SiC#39 connection check list.TM2 has been connected  in ITE. 
All turbo-pumps are started.
 SiC_#_39_febiad_connection_checklist.pdf 
  2034   Friday, November 29, 2019, 11:03 Travis CaveSouth Hot-CellStandard OperationTM2SiC#39Module move TM#2 with the SiC#39 target has been
moved from the south hot cell to the east
target station.
  
  2033   Friday, November 29, 2019, 11:02 Travis CaveSouth Hot-CellStandard OperationTM2SiC#38 SiC#39Electrical Check Results from the electrical check
with the old SiC#38 target and the new SiC#39.
 Elec_chk_SiC#38_SHC_post_beam_TM2_11-26-2019.pdfElec_chk_SiC#39_SHC_TM2_11-29-2019.pdf 
  2032   Wednesday, November 27, 2019, 13:46 David WangConditioning StationStandard OperationTM2SiC 38# febiadTM2 SiC #38 disconnection checklist.TM2 was disconnected in ITE yesterday.  SiC_#_38_febiad_disconnection_checklist.pdf 
  2031   Tuesday, November 26, 2019, 10:24 Travis CaveSouth Hot-CellStandard OperationTM2SiC#38Module move TM#2 with SiC#38 has been moved from
ITE to the south hot cell.
  
  2030   Tuesday, November 19, 2019, 13:41 David WangITEStandard OperationTM2SiC 38# febiadTM2 SiC#38 connection check list.TM2 was connected in ITE 12th Nov. attach
checklist
 SiC_#_38_febiad_connection_checklist.pdf 
  2029   Thursday, November 14, 2019, 13:52 Travis CaveSpent Target VaultStandard Operation UC#22,23,24Targets repackaged The targets UC#22,23,24 have been
repackaged into the newer stronger pails,
and have been placed back in the mini vault
 Target_Index_2019-11-14_Mini_Vault.pdf 
  2028   Tuesday, November 12, 2019, 10:07 Travis CaveSpent Target VaultStandard Operation Ta#59Spent Target Move The spent Ta#59 was moved from the
south hot cell to the spent target vault.
See the attached for details.
 Target_Index_2019-11-08.pdf 
  2027   Tuesday, November 12, 2019, 10:02 Adam NewsomeITEStandard OperationTM2SiC#38TM2 MoveTM2 was moved from the Conditioning Station
to ITE, with SiC#38 target. 
  
  2026   Thursday, November 07, 2019, 10:39 Anders MjosConditioning StationStandard OperationTM2SiC#38Conditioing SiC#38Thursday, November 07, 2019, 10:35: Tested
source to 30 A on TGHT, TBHT and COIL. ANODE
at 100 V.
 SiC#38_ANODE_bias_2019-11-07.PNG 
  2025   Thursday, November 07, 2019, 08:56 David WangConditioning StationStandard OperationTM2SiC#38TM2 in TCS.Helium pressure leak check on TM2 HS line
at TCS is done. No leak. Also, Helium are
sprayed to gas line adapter and fittings.
  
  2024   Tuesday, November 05, 2019, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Electrical Check Results of the electrical check of
TM#2 with the old Ta#59 target and target
free.
 Elec_Chk_TM2_with_Ta59_post_beam_SHC_Nov_05_2019.pdfElec_Chk_TM2_SHC_no_target_Nov_5_2019.pdf 
  2023   Tuesday, November 05, 2019, 12:46 chad fisherSouth Hot-CellStandard OperationTM2ta#59Ta#59 removedTa#59 has been removed from TM2 and it
is now ready for electrical check.
  
  2022   Tuesday, November 05, 2019, 11:57 David WangITEStandard OperationTM2Ta 59Ta#59 disconnection checklistSee attachment  Ta#59_disconnection_checklist.pdf 