2038
|
Thursday, January 02, 2020, 09:55 |
David Wang | Cooling | Standard Operation | | | I turned on HALC water pump MP2. | HALCW MP2 is switched onnow. There is a
small amount of air trapped in system. The
pump works fine. Water level and system |
|
2037
|
Thursday, December 12, 2019, 14:39 |
Isaac Earle | Safe Module Parking | Development | | | SMP assembly shifted 1.0" north | The SMP assembly was shifted approximately
1.0" north today by pushing it, braced
against the south wall, using a 100 Ton capacity |
|
2036
|
Tuesday, December 03, 2019, 12:45 |
Adam Newsome | Spent Target Vault | Standard Operation | | SiC#38 | SiC#38 in Pail 205 moved to Storage Vault: 4B | SiC#38 in Pail 205 was moved to section 4B
of the storage vault. Dose rate when retrieving
from Hot Cell was 22.2 mSv/h. |
|
2035
|
Friday, November 29, 2019, 13:10 |
David Wang | ITE | Standard Operation | TM2 | SiC 39# febiad | TM2 SiC#39 connection check list. | TM2 has been connected in ITE.
All turbo-pumps are started. |
|
2034
|
Friday, November 29, 2019, 11:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#39 | Module move | TM#2 with the SiC#39 target has been
moved from the south hot cell to the east
target station. |
|
2033
|
Friday, November 29, 2019, 11:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#38 SiC#39 | Electrical Check | Results from the electrical check
with the old SiC#38 target and the new SiC#39. |
|
2032
|
Wednesday, November 27, 2019, 13:46 |
David Wang | Conditioning Station | Standard Operation | TM2 | SiC 38# febiad | TM2 SiC #38 disconnection checklist. | TM2 was disconnected in ITE yesterday. |
|
2031
|
Tuesday, November 26, 2019, 10:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#38 | Module move | TM#2 with SiC#38 has been moved from
ITE to the south hot cell. |
|
2030
|
Tuesday, November 19, 2019, 13:41 |
David Wang | ITE | Standard Operation | TM2 | SiC 38# febiad | TM2 SiC#38 connection check list. | TM2 was connected in ITE 12th Nov. attach
checklist |
|
2029
|
Thursday, November 14, 2019, 13:52 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#22,23,24 | Targets repackaged | The targets UC#22,23,24 have been
repackaged into the newer stronger pails,
and have been placed back in the mini vault |
|
2028
|
Tuesday, November 12, 2019, 10:07 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#59 | Spent Target Move | The spent Ta#59 was moved from the
south hot cell to the spent target vault.
See the attached for details. |
|
2027
|
Tuesday, November 12, 2019, 10:02 |
Adam Newsome | ITE | Standard Operation | TM2 | SiC#38 | TM2 Move | TM2 was moved from the Conditioning Station
to ITE, with SiC#38 target. |
|
2026
|
Thursday, November 07, 2019, 10:39 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | SiC#38 | Conditioing SiC#38 | Thursday, November 07, 2019, 10:35: Tested
source to 30 A on TGHT, TBHT and COIL. ANODE
at 100 V. |
|
2025
|
Thursday, November 07, 2019, 08:56 |
David Wang | Conditioning Station | Standard Operation | TM2 | SiC#38 | TM2 in TCS. | Helium pressure leak check on TM2 HS line
at TCS is done. No leak. Also, Helium are
sprayed to gas line adapter and fittings. |
|
2024
|
Tuesday, November 05, 2019, 14:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#59 | Electrical Check | Results of the electrical check of
TM#2 with the old Ta#59 target and target
free. |
|
2023
|
Tuesday, November 05, 2019, 12:46 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | ta#59 | Ta#59 removed | Ta#59 has been removed from TM2 and it
is now ready for electrical check. |
|
2022
|
Tuesday, November 05, 2019, 11:57 |
David Wang | ITE | Standard Operation | TM2 | Ta 59 | Ta#59 disconnection checklist | See attachment |
|
2021
|
Tuesday, November 05, 2019, 10:19 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#59 | Module move | TM#2 with Ta#59 has been moved from
the ITE to the south hot cell. |
|
2020
|
Thursday, October 31, 2019, 10:17 |
David Wang | Assembly/Bench Test | Maintenance | TM2 | | Febiad target gas line leak check. | Feibiad gas line for ITE and its adapter
fittings for TM2 are tested today by installing
them on a dummy water stem. No leak on VCO |
|
2019
|
Thursday, October 31, 2019, 08:49 |
Anders Mjos | Conditioning Station | Repair | | | Water leak on non-active cooling water circuit | Yesterday a leak was discovered in the
ISAC-I experimental hall. The leak appears
to be at the connection between the evaporator |
|