  ID Date Author Category Type Module Target/Number Subject Text Attachments
  1821   Wednesday, November 14, 2018, 16:10 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal troubleshootingMeasured resistance on safety limit switches
for FC5 on Exit Module 2. Determined that
the in connected signal did not work (shows
 2018-11-13_FC5.pdf 
  1820   Thursday, November 08, 2018, 09:27 chad fisherSouth Hot-CellMaintenance  South East Manipulator cable replacementThe handle cable on the east manipulator
of the south hot cell has been replaced.
Old cable showed signs of wear but had no
  
  1819   Wednesday, November 07, 2018, 09:50 Anders MjosITWStandard OperationTM2UC#25TM2 connected in ITWTM2 was connected yesterday by Frank and
Anders. The West side panel with IG1S on
Exit Module 2 was replaced with a new SST
  
  1818   Tuesday, November 06, 2018, 10:59 Travis CaveITWStandard OperationTM2UC#25Module move TM#2 with UC#25 has been moved from
the conditioning station to the west target
station.
  
  1817   Monday, November 05, 2018, 14:27 Anders MjosConditioning StationStandard OperationTM2UC#25Target module disconnectedFrank and Anders disconnected the water
and electrical connections this afternoon
after the target was conditioned over the
  
  1816   Monday, November 05, 2018, 08:24 Travis CaveSpent Target VaultStandard Operation nSiC#1Spent Target Move The spent nSiC#1 target has been
moved from the south hot cell to the spent
target vault. It was placed in pail #172
 Target_Index_2018-11-02.pdf 
  1815   Thursday, November 01, 2018, 11:42 David WangConditioning StationStandard OperationTM2UCx 25.TM2 HS line helium pressure test at TCS and helium spray at SHC..Chad and I did  leak check on TM2
HS line at SHC yesterday. Base LR 0.0XE-9
atm.cc/sec.   No response on LD.
  
  1814   Wednesday, October 31, 2018, 14:23 Travis CaveSouth Hot-CellStandard OperationTM2nSiC#1 and UC#25Electrical Check TM#2 with targets nSiC#1 (old target)
and UC#25 (new target) electrical check results.
See attached for details.
 Electrical_Chk__TM#2_nSiC#1_SHC_Post_Beam_Oct-31-2018.pdfElectrical_Chk_TM#2_UC#25_SHC_Oct-31-2018.pdf 
  1813   Wednesday, October 31, 2018, 14:20 Travis CaveConditioning StationStandard OperationTM2UC#25Module moveTM#2 with UC#25 has been moved from the south
hot cell to the conditioning station.
  
  1812   Tuesday, October 30, 2018, 10:50 Travis CaveITWStandard OperationTM2nSiC#1Modules moved Modules were moved, ITW EX2 was moved
from the conditioning station to the west
target station and TM#2 ,with nSiC#1, 
  
  1811   Monday, October 29, 2018, 10:43 David WangConditioning StationRepair  ITW exit 2 leak check at TCS.I did a leak check this morning on exit
2 module at TCS. LD base  leak rate
is 4.00XE-9atm.cc/sec, Base pressure is 0.00
  
  1810   Friday, October 26, 2018, 09:44 Travis CaveConditioning StationStandard Operation  Exit Module movedThe west exit #2 module has been moved from
the south hot cell to the conditioning station.
  
  1809   Thursday, October 25, 2018, 11:03 chad fisherSouth Hot-CellRepair  Exit 2 WestActuator arms, lemos, lemos and banana
plug block have been disconnected in preparation
for raising of the service tray. Aaron has
 8x 
  1808   Tuesday, October 23, 2018, 11:32 David WangSouth Hot-CellMaintenance  ITW RV4S leak check.ITW RV4S (A and B) are leak checked. They
are good.  
  
  1807   Tuesday, October 23, 2018, 10:53 chad fisherSouth Hot-CellRepair  Exit 2 EastCover 1 was removed from the exit module.
Confirmed with David that the actuator rod
that needed to be disconnected was the far
 20181023_104541.jpg 
  1806   Tuesday, October 23, 2018, 10:45 David WangITWStandard OperationTM2SiC nanoTM2 was disconnected in ITW.TM2(SiC nano) has been disconnected in
ITW. See attachment
 TM2_SiC_nano_disconnection_in_ITW.pdf 
  1805   Monday, October 22, 2018, 14:05 Travis CaveITWRepair  Module move ITW Exit #2 has been moved from the
west station to the south hot cell for a
bellows repair.
  
  1804   Wednesday, October 10, 2018, 10:50 Travis CaveConditioning StationStandard OperationTM4Ta#57Electrical Check The various electrical check done
on TM#4 after the UC run and before the start
of the Ta run.
 TM#4_UC#24_Electrical_Check_SHC.pdfTM#4_Elec_Chk_No_Target_Oct-3-2018.pdfTM#4_Elec_Chk_SHC_Ta#57.pdf 
  1803   Wednesday, October 10, 2018, 07:52 David WangITEStandard OperationTM4Ta#57TM4 has been connected in ITE.TM4 has been connected in ITE. see attachment.  TM4_with_TA#56_connection_in_ITE.pdf 
  1802   Tuesday, October 09, 2018, 13:46 Travis CaveITEStandard OperationTM4Ta#57Module move TM#4 with Ta#57 has been moved from
the conditioning station to the east target
station.
  