1821
|
Wednesday, November 14, 2018, 16:10 |
Anders Mjos | ITW | Repair | TM2 | UC#25 | ITW:FC5 safety signal troubleshooting | Measured resistance on safety limit switches
for FC5 on Exit Module 2. Determined that
the in connected signal did not work (shows |
|
|
1820
|
Thursday, November 08, 2018, 09:27 |
chad fisher | South Hot-Cell | Maintenance | | | South East Manipulator cable replacement | The handle cable on the east manipulator
of the south hot cell has been replaced.
Old cable showed signs of wear but had no |
|
|
1819
|
Wednesday, November 07, 2018, 09:50 |
Anders Mjos | ITW | Standard Operation | TM2 | UC#25 | TM2 connected in ITW | TM2 was connected yesterday by Frank and
Anders. The West side panel with IG1S on
Exit Module 2 was replaced with a new SST |
|
|
1818
|
Tuesday, November 06, 2018, 10:59 |
Travis Cave | ITW | Standard Operation | TM2 | UC#25 | Module move | TM#2 with UC#25 has been moved from
the conditioning station to the west target
station. |
|
|
1817
|
Monday, November 05, 2018, 14:27 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | UC#25 | Target module disconnected | Frank and Anders disconnected the water
and electrical connections this afternoon
after the target was conditioned over the |
|
|
1816
|
Monday, November 05, 2018, 08:24 |
Travis Cave | Spent Target Vault | Standard Operation | | nSiC#1 | Spent Target Move | The spent nSiC#1 target has been
moved from the south hot cell to the spent
target vault. It was placed in pail #172 |
|
|
1815
|
Thursday, November 01, 2018, 11:42 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx 25. | TM2 HS line helium pressure test at TCS and helium spray at SHC.. | Chad and I did leak check on TM2
HS line at SHC yesterday. Base LR 0.0XE-9
atm.cc/sec. No response on LD. |
|
|
1814
|
Wednesday, October 31, 2018, 14:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | nSiC#1 and UC#25 | Electrical Check | TM#2 with targets nSiC#1 (old target)
and UC#25 (new target) electrical check results.
See attached for details. |
|
|
1813
|
Wednesday, October 31, 2018, 14:20 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | UC#25 | Module move | TM#2 with UC#25 has been moved from the south
hot cell to the conditioning station. |
|
|
1812
|
Tuesday, October 30, 2018, 10:50 |
Travis Cave | ITW | Standard Operation | TM2 | nSiC#1 | Modules moved | Modules were moved, ITW EX2 was moved
from the conditioning station to the west
target station and TM#2 ,with nSiC#1, |
|
|
1811
|
Monday, October 29, 2018, 10:43 |
David Wang | Conditioning Station | Repair | | | ITW exit 2 leak check at TCS. | I did a leak check this morning on exit
2 module at TCS. LD base leak rate
is 4.00XE-9atm.cc/sec, Base pressure is 0.00 |
|
|
1810
|
Friday, October 26, 2018, 09:44 |
Travis Cave | Conditioning Station | Standard Operation | | | Exit Module moved | The west exit #2 module has been moved from
the south hot cell to the conditioning station. |
|
|
1809
|
Thursday, October 25, 2018, 11:03 |
chad fisher | South Hot-Cell | Repair | | | Exit 2 West | Actuator arms, lemos, lemos and banana
plug block have been disconnected in preparation
for raising of the service tray. Aaron has |
8x |
|
1808
|
Tuesday, October 23, 2018, 11:32 |
David Wang | South Hot-Cell | Maintenance | | | ITW RV4S leak check. | ITW RV4S (A and B) are leak checked. They
are good. |
|
|
1807
|
Tuesday, October 23, 2018, 10:53 |
chad fisher | South Hot-Cell | Repair | | | Exit 2 East | Cover 1 was removed from the exit module.
Confirmed with David that the actuator rod
that needed to be disconnected was the far |
|
|
1806
|
Tuesday, October 23, 2018, 10:45 |
David Wang | ITW | Standard Operation | TM2 | SiC nano | TM2 was disconnected in ITW. | TM2(SiC nano) has been disconnected in
ITW. See attachment |
|
|
1805
|
Monday, October 22, 2018, 14:05 |
Travis Cave | ITW | Repair | | | Module move | ITW Exit #2 has been moved from the
west station to the south hot cell for a
bellows repair. |
|
|
1804
|
Wednesday, October 10, 2018, 10:50 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#57 | Electrical Check | The various electrical check done
on TM#4 after the UC run and before the start
of the Ta run. |
|
|
1803
|
Wednesday, October 10, 2018, 07:52 |
David Wang | ITE | Standard Operation | TM4 | Ta#57 | TM4 has been connected in ITE. | TM4 has been connected in ITE. see attachment. |
|
|
1802
|
Tuesday, October 09, 2018, 13:46 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#57 | Module move | TM#4 with Ta#57 has been moved from
the conditioning station to the east target
station. |
|