  1801   Tuesday, October 09, 2018, 12:32 David WangConditioning StationRepairTM4 TM4 steers 4 pin feedthrough CF flangeTM4 Steers 4 pin feedthrough CF flange
is replaced due an inside feed through insulator
broken. CF 25 cooper seal is replaced with
  
  1800   Friday, October 05, 2018, 14:41 Travis CaveSpent Target VaultStandard Operation UC#24Spent Target Move UC#24 has been moved from the south
hot cell to the spent target vault. The target
is in pail #171 and placed in spot 4C. See
 Target_Index_2018-10-05.pdf 
  1799   Wednesday, October 03, 2018, 14:16 David WangSouth Hot-CellStandard OperationTM4Ta #57Leak check TM4 Lp Ta# 57 at SHC.Tried to leak check TM4 Ta57# at TCS. LD
failed to pump down properly at fine range.
It always tripped at 4 torr. I cheeked all
  
  1798   Tuesday, October 02, 2018, 09:59 Travis CaveSouth Hot-CellStandard OperationTM4UC#24Module move TM#4 with UC#24 has been moved from
the east target station to the south hot
cell.
  
  1797   Tuesday, October 02, 2018, 09:49 David WangITEStandard OperationTM4UCx 24#TM4 was disconnected in ITE.TM4 was disconnected in ITE yesterday.
See attachment for checklist.
 TM2_UCx_24#_disconnection_in_ITE..pdf 
  1796   Thursday, September 27, 2018, 13:58 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the conditioning
station to the centre east silo. This will
be its new home after the silo switcher-roo.
  
  1795   Wednesday, September 26, 2018, 07:14 David WangConditioning StationRepairTM3 TM3 HV test at TCS.I did a HV test on TM3 at TCS yesterday.
HV Ramp up speed: 1KV per 5 minutes when
below 30KV,1KV per 10 minutes from 30-36KV.
  
  1794   Tuesday, September 25, 2018, 08:48 chad fisherSouth Hot-CellMaintenance  Window leak and torqueThe south hot cell window has been found
to be leaking oil. Upon inspection yesterday
I found that the bolts compressing the gasket
 hot_cell_window_gasket_change_procedure.pdf 
  1793   Tuesday, September 25, 2018, 08:01 chad fisherSouth Hot-CellStandard OperationTM2nSiC#1nSiC#1 installOn September 18th installation of nSiC#1
was attempted on TM2. As usual, new fasteners
were tested previous to insertion into hot
 20180919_132304.jpg20180919_143535.jpg 
  1792   Tuesday, September 25, 2018, 07:54 David WangConditioning StationRepairTM3 TM3 is connected for HV test at TCS.water loops are by passed on top. All bias,
EE, and  EL are tied together. Started
water system.
  
  1791   Monday, September 24, 2018, 14:50 Travis CaveSpent Target VaultStandard Operation UC#23Spent Target Move The spent UC#23 target has been moved
from the south hot cell to the spent target
storage. It was placed in pail #170 and place
  
  1790   Monday, September 24, 2018, 10:21 Anders MjosSouth Hot-CellStandard OperationTM2UC#23Post Irradiation Examination (PIE)UC#23 experienced short between target
and heat shield as it was heated during operation.
The inspection of the target after irradiation
 20180924_161322929_iOS.jpg 
  1789   Friday, September 21, 2018, 10:07 David WangITWStandard OperationTM2SiC nanoTM2 with SiC nano target was has been connected in ITW.Tm2 with SiC nano has been connected in
ITW. See attachment for checklist
 TM2_with_SiC_nano_connection_in_ITW..pdf 
  1788   Friday, September 21, 2018, 10:06 David WangITWStandard OperationTM2UCx23TM2 was disconnected in ITW.TM2 was disconnected in ITW this Tuesday.
See attachment for checklist.
 TM2_UCx_23#_disconnection_in_ITW..pdf 
  1787   Thursday, September 20, 2018, 14:36 Travis CaveITWStandard OperationTM2nSiC#1Module move TM#2 with nSiC#1 has been moved from
the south hot cell to the west target station.
  
  1786   Thursday, September 20, 2018, 14:35 Travis CaveSouth Hot-CellStandard OperationTM2nSiC#1Electrical Check TM#2 with the nSiC#1 target had its
check done on it at the south hot cell see
attached for results.
 Electrical_Chk_TM2_SHC_nSiC#1_Sept-20-2018.pdf 
  1785   Thursday, September 20, 2018, 08:36 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check Results of the electrical check on
TM#2 with no target after Chad cleaned out
the bolt hole on the module where the target
 Electrical_Chk_TM2_no_tgt_Sept-20-2018.pdf 
  1784   Tuesday, September 18, 2018, 12:59 Travis CaveSouth Hot-CellStandard OperationTM2UC#23Module move TM#2 with UC#23 has been moved from
ITW to the south hot cell. The shield plug
was also installed remotely as well.
  
  1783   Friday, September 14, 2018, 09:39 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 with no target has been moved
from the north east silo to the conditioning
station.
  
  1782   Thursday, September 13, 2018, 16:57 Isaac EarleNorth Hot-CellDevelopment  NHC grounding and mili-ohm testing The
following equipment has been connected to
the building ground located in the Target
  