ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
1788
|
Friday, September 21, 2018, 10:06 |
David Wang | ITW | Standard Operation | TM2 | UCx23 | TM2 was disconnected in ITW. | TM2 was disconnected in ITW this Tuesday.
See attachment for checklist. |
|
1787
|
Thursday, September 20, 2018, 14:36 |
Travis Cave | ITW | Standard Operation | TM2 | nSiC#1 | Module move | TM#2 with nSiC#1 has been moved from
the south hot cell to the west target station. |
|
1786
|
Thursday, September 20, 2018, 14:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | nSiC#1 | Electrical Check | TM#2 with the nSiC#1 target had its
check done on it at the south hot cell see
attached for results. |
|
1785
|
Thursday, September 20, 2018, 08:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check | Results of the electrical check on
TM#2 with no target after Chad cleaned out
the bolt hole on the module where the target |
|
1784
|
Tuesday, September 18, 2018, 12:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | UC#23 | Module move | TM#2 with UC#23 has been moved from
ITW to the south hot cell. The shield plug
was also installed remotely as well. |
|
1783
|
Friday, September 14, 2018, 09:39 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 with no target has been moved
from the north east silo to the conditioning
station. |
|
1782
|
Thursday, September 13, 2018, 16:57 |
Isaac Earle | North Hot-Cell | Development | | | NHC grounding and mili-ohm testing | The
following equipment has been connected to
the building ground located in the Target |
|
1781
|
Wednesday, September 12, 2018, 15:30 |
Isaac Earle | North Hot-Cell | Development | | | Installation of NHC operator-level lighting completed | Installation of of operator-level
lighting in the NHC was completed today according
to drawing IRH1801. 2" x 2" |
|
1780
|
Wednesday, September 12, 2018, 15:22 |
Isaac Earle | North Hot-Cell | Development | | | NHC air and gas supply lines - test and leak check | Testing was completed today on the NHC
air and gas supply lines. For each
line a Staubli plug was installed on the |
|
1779
|
Friday, September 07, 2018, 10:55 |
David Wang | ITE | Standard Operation | TM4 | UCx 24# | TM4 has been connected to ITE/ Checklist | TM4 has been connected to ITE on Sep 04th.
See attachment for checklist. |
|
1778
|
Friday, September 07, 2018, 10:47 |
David Wang | ITE | Repair | TM4 | UCx24 | TM4 TP2 replacement | TM4 TP2 could not be started after
module was connected back to ITE on Sep 04th.
It was replaced with a new pump on Sep 05th. |
|
1777
|
Thursday, September 06, 2018, 10:25 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#34, Ta#45,46,47, 50 | Spent Target Move | Targets SiC#34 , Ta#45,46,47,50 have
been moved from the spent target vault to
the mini vault. |
|
1776
|
Tuesday, September 04, 2018, 09:57 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#24 | Module move | TM#4 with UC#24 has been moved from
the conditioning station to the east target
station. |
|
1775
|
Tuesday, September 04, 2018, 08:18 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx 24# | Stppped TM4 and TCS vacuum and water system at TCS. | I stopped TM4 and TCS vacuum system at
TCS. TCS and TM4 is venting with argon now. |
|
1774
|
Thursday, August 30, 2018, 14:16 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#56, UC#24, and no target | Electrical Check | Results of the electrical check with
the spent Ta#56 attached, no target attached
and the UC#24 attached. These test were performed |
|
1773
|
Thursday, August 30, 2018, 11:13 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#56 | Spent Target Move | Ta#56 has been moved from the south
hot cell to the storage vault. It was placed
in pail#169 and place in slot 2C of the vault. |
|
1772
|
Thursday, August 30, 2018, 07:46 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 HS line leak check at TCS and SHC. | Chad and I leak checked TM4 HS line after
UCx 24 is installed. No leak at 5xE-9atm.cc/sec.
Today, I did helium pressure test on HS line |
|
1771
|
Thursday, August 30, 2018, 07:42 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been connected to TCS. | TM4 has been connected to TCS. vacuum system
and water system are started. Everything
looks fine. |
|
1770
|
Tuesday, August 28, 2018, 14:19 |
David Wang | ITE | Standard Operation | TM4 | Ta#56 | TM4 Ta#56 disconenction. | TM4 has been disconnected in ITE this morning.
See attachment. |
|
1769
|
Tuesday, August 28, 2018, 10:53 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#56 | Module move | TM#4 with Ta#56 has been moved from
the east station to the south hot cell. |
|