Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 50 of 138  Not logged in ELOG logo
  ID Date Author Category Type Module Target/Number Subject Text Attachments
  1781   Wednesday, September 12, 2018, 15:30 Isaac EarleNorth Hot-CellDevelopment  Installation of NHC operator-level lighting completed Installation of of operator-level
lighting in the NHC was completed today according
to drawing IRH1801.  2" x 2"
 LEDs_and_manipulators.jpgLEDs.jpgcords.jpg 
  1780   Wednesday, September 12, 2018, 15:22 Isaac EarleNorth Hot-CellDevelopment  NHC air and gas supply lines - test and leak checkTesting was completed today on the NHC
air and gas supply lines.  For each
line a Staubli plug was installed on the
  
  1779   Friday, September 07, 2018, 10:55 David WangITEStandard OperationTM4UCx 24#TM4 has been connected to ITE/ ChecklistTM4 has been connected to ITE on Sep 04th.
See attachment  for checklist.
 TM4_UCx_24#__connection_check_list.pdf 
  1778   Friday, September 07, 2018, 10:47 David WangITERepairTM4UCx24TM4 TP2 replacementTM4 TP2 could not be started  after
module was connected back to ITE on Sep 04th.
It was replaced with a new pump on Sep 05th.
  
  1777   Thursday, September 06, 2018, 10:25 Travis CaveSpent Target VaultStandard Operation SiC#34, Ta#45,46,47, 50Spent Target Move Targets SiC#34 , Ta#45,46,47,50 have
been moved from the spent target vault to
the mini vault.
  
  1776   Tuesday, September 04, 2018, 09:57 Travis CaveConditioning StationStandard OperationTM4UC#24Module move TM#4 with UC#24 has been moved from
the conditioning station to the east target
station.
  
  1775   Tuesday, September 04, 2018, 08:18 David WangConditioning StationStandard OperationTM4UCx 24#Stppped TM4 and TCS vacuum and water system at TCS.I stopped TM4 and TCS vacuum system at
TCS. TCS and TM4 is venting with argon now.
  
  1774   Thursday, August 30, 2018, 14:16 Travis CaveSouth Hot-CellStandard OperationTM4Ta#56, UC#24, and no targetElectrical Check Results of the electrical check with
the spent Ta#56 attached, no target attached
and the UC#24 attached. These test were performed
 TM#4_Ta#56_Electrical_Check_Post_Beam_at_SHC.pdfTM#4_No_Target_Electrical_Check_Aug-29-2018.pdfTM#4_UC#24_Electrical_Check_SHC.pdf 
  1773   Thursday, August 30, 2018, 11:13 Travis CaveSpent Target VaultStandard Operation Ta#56Spent Target Move Ta#56 has been moved from the south
hot cell to the storage vault. It was placed
in pail#169 and place in slot 2C of the vault.
 Target_Index_2018-08-30.pdf 
  1772   Thursday, August 30, 2018, 07:46 David WangConditioning StationStandard OperationTM4 TM4 HS line leak check at TCS and SHC.Chad and I leak checked TM4 HS line after
UCx 24 is installed. No leak at 5xE-9atm.cc/sec. 
Today, I did helium pressure test on HS line
  
  1771   Thursday, August 30, 2018, 07:42 David WangConditioning StationStandard OperationTM4 TM4 has been connected to TCS.TM4 has been connected to TCS. vacuum system
and water system are started. Everything
looks fine.
  
  1770   Tuesday, August 28, 2018, 14:19 David WangITEStandard OperationTM4Ta#56TM4 Ta#56 disconenction.TM4 has been disconnected in ITE this morning.
See attachment.
 TM4_Ta#56_disconnection..pdf 
  1769   Tuesday, August 28, 2018, 10:53 Travis CaveSouth Hot-CellStandard OperationTM4Ta#56Module move TM#4 with Ta#56 has been moved from
the east station to the south hot cell.
  
  1768   Monday, August 20, 2018, 09:55 Travis CaveSouth Hot-CellStandard OperationTM2Ta#56 and UC#23Electrical Check Electrical Checks of the last two
targets Ta#56 and UC#23
 Electrical_Check_TM4_Ta56_SHC.pdfElectrical_Check_TM2_UC23_CS.pdfElectrical_Check_TM2_UC23_SHC.pdf 
  1767   Tuesday, August 14, 2018, 10:27 Travis CaveITWStandard OperationTM2UC#23Module move Both the West Entrance and TM#2 with
UC#23 have been moved back into their places
in the west target station. The Entrance
  
  1766   Tuesday, August 07, 2018, 10:44 Travis CaveSouth Hot-CellMaintenance  Entrance module move The west entrance module has been
moved from the west target station to the
south hot cell, for a bellows replacement.
  
  1765   Thursday, August 02, 2018, 14:12 Travis CaveSpent Target VaultStandard Operation Nb#8Spent Target Move The spent Nb#8 target was moved from
the south hot cell to the spent target vault.
It was placed in pail #168 and place in spot
 Target_Index_2018-08-02.pdf 
  1764   Thursday, August 02, 2018, 07:57 David WangConditioning StationStandard Operation  Leak check on TM2 UCx #23 @ TCS and SHC.I did a helium pressure test on TM2 HS
line at TCS. At 70psi helium, the leak rate
is 2.5 xE-7 atm.cc/sec. I think this is the
  
  1763   Wednesday, August 01, 2018, 15:12 Anders MjosSouth Hot-CellStandard OperationTM2UC#23Target mounted - water leak on HS lineThe heat shield water lines were not purged
ahead of target exchange  in the hot cell.
This resulted in water leaking onto the new
 20180801_180130904_iOS.jpg 
  1762   Wednesday, August 01, 2018, 14:48 Travis CaveConditioning StationStandard OperationTM2UC#23Spent Target Move TM#2 with UC#23 has been moved from
the south hot cell to the conditioning station.
  
ELOG V2.9.2-2455