1108
|
Tuesday, October 20, 2015, 12:49 |
Dan McDonald | ITW | Standard Operation | | SiC#32 | Tm2 hook up In ITW | Lower and disconnect TM2 from crane in
ITW, proceed with hooking up TM2 as per checklist
with Anders. Double check flow meters and |
|
1107
|
Tuesday, October 20, 2015, 10:18 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#32 | Module moved | TM#2 with SiC#32 has been moved from the
south hot cell to the west target station. |
|
1106
|
Monday, October 19, 2015, 15:52 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | SiC#32 | Electrical and leak check | An electrical check was completed
by Travis C and Anders M. Note ~250 kOhm
between Target and 60 kV common. Leak check |
|
1105
|
Monday, October 19, 2015, 11:53 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#32 | SiC#32 installed on TM2 | SiC#32 has been installed on TM2. High
current fasteners torqued to 130 in lbs. |
|
1104
|
Thursday, October 15, 2015, 14:17 |
chad fisher | South Hot-Cell | Repair | TM2 | | Anode Connector Install and adjustment | The TM2 containment box was removed this
morning for installation of the 9 pin connector...connection.
The 9 pin connector copper tube connection |
|
1103
|
Thursday, October 15, 2015, 08:07 |
David Wang | South Hot-Cell | Standard Operation | TM2 | no target | TM2 no target electrical check at SHC. | I did a TM2 no target electrical check
at SHC this morning. A to RU at 500v
is 250K which is low. anode- |
|
1102
|
Wednesday, October 14, 2015, 14:49 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | Install new high current cables to TM2 | I installed a set of new high current cables
for TM2 Febiad run. The top of TM2
is configured to Febiad mode. See attachments |
|
1101
|
Wednesday, October 14, 2015, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | ZrC#7 | ZrC#7 removed | ZrC#7 has been removed from TM2. Everything
looks good. |
|
1100
|
Wednesday, October 14, 2015, 12:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | ZrC#7 | TM2 ZrC#7 after run electrical check at SHC. | I did an electrical check on TM2 with ZrC
#7 on it. The EE is short to 60KV bias. See
attachment |
|
1099
|
Wednesday, October 14, 2015, 12:44 |
David Wang | ITW | Standard Operation | TM2 | ZrC#7 | TM2 has been moved from ITW to SHC | Bill and I remotely removed TM2 from ITW
to SHC. The move is smooth. |
|
1098
|
Wednesday, October 14, 2015, 12:42 |
David Wang | ITW | Standard Operation | TM2 | ZrC#7 | TM2 has been disconnected in ITW | Dan and I disconnected TM2 in ITW this
morning. |
|
1097
|
Tuesday, October 13, 2015, 10:53 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | Weekly update schedule. TM3 evaluation
schedule in Nov is added.
update the schedule after the |
|
1096
|
Thursday, October 08, 2015, 14:08 |
David Wang | South Hot-Cell | Standard Operation | TM3 | Dummy target febiad. | TM3 has been moved from SHC to NW silo | Bill and I moved TM3 from SHC to NW silo
with a dummy febiad target installed on it.
The move is smooth. |
|
1095
|
Tuesday, October 06, 2015, 21:12 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | | TM3 service cap inspection in target hall | David Wang and I did the service cap inspection
in target hall: see WP I2015-10-06-10.<br>
Signs of sparking were seen underneath |
|
1094
|
Tuesday, October 06, 2015, 13:25 |
David Wang | ITE | Standard Operation | TM4 | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 | Weekly update target hall schedule. See
attachment 1,2. |
|
1093
|
Tuesday, October 06, 2015, 13:00 |
David Wang | ITE | Repair | TM4 | | spark on top of TM4 in ITE | During the weekend condition The TM4 spark
at 30KV without vacuum response. It is confirmed
the spark is from the top TM4 this morning.The |
|
1092
|
Tuesday, October 06, 2015, 12:50 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | 5 Shielding blocks have been transferred from ITW to ITE. | The ITE is configured to take proton beam. |
|
1091
|
Tuesday, October 06, 2015, 12:50 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | 5 Shielding blocks have been transferred from ITW to ITE. | The ITE is configured to take proton beam. |
|
1090
|
Monday, October 05, 2015, 10:19 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller maintenance | will be performed Tuesday October
6th
Tuesday, October 06, 2015: Maintenance |
|
1089
|
Thursday, October 01, 2015, 09:18 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets transfered to mini storage. | In preparation for shipping of the spent
targets five have been moved to the mini
storage. The following target were moved |
|