  53   Friday, January 30, 2015, 15:02 Travis CaveCyclotronStandard OperationDay four of in tank workAll shields, ladders and pothole covers
are in. One rad survey left to do.
  
  52   Thursday, January 29, 2015, 14:53 Travis CaveCyclotronStandard OperationDay three of in tank workOver 50% of the shields are in some 700's
left and the monitor box covers.
  
  51   Wednesday, January 28, 2015, 14:33 Travis CaveCyclotronStandard OperationDay two of in tank workAll copper blocker removed from the cyclotron
and first radiation survey done. Shields
start tomorrow.
  
  50   Tuesday, January 27, 2015, 14:40 Travis CaveCyclotronStandard OperationDay one of in tank workDay one of RH in tank work for the cyclotron
(shields and blockers stuff like that) many
pictures were taken.
  
  49   Tuesday, January 27, 2015, 11:39 Grant MinorElevation JackStandard OperationLid-Up Report 26 Jan 2015






Normal
0
 Station_8_Interference_Measurment_26Jan2015.JPGStation_8_Lid_Up_without_platform_26Jan2015.JPG 
  48   Monday, January 26, 2015, 07:57 maicodallavalleElevation JackMaintenanceFall arrest Platform RailingAll of the Fall arrest Platform Railing
has been Collapsed for Cyclotron Lid up.
  
  47   Friday, January 23, 2015, 10:27 maicodallavalleElevation JackMaintenance2015 Jack Maintenance - Stations #4 and Station #9The Cyclotron Elevating System Shut Down 
work done this year was done on Station #4
and Station #9.
  
  46   Tuesday, January 13, 2015, 16:46 Grant MinorElevation JackDevelopmentUpper Bearing Fall Protect Guardrails TRH1217 Installed on Stns 8,10, 3, 4 & 55 x TRH1217 Upper Bearing Service Platform
assemblies were installed between January
6th and January 13th at Stations 8, 10, 3,
 9x 
  45   Friday, July 04, 2014, 07:21 Dan McDonaldElevation JackStandard OperationCyclotron lid down July-2- 2014Cyclotron lid down was successfully completed
on July 2 2014. Lid went partially down before
jack nine had to be jogged to catch up to
  
  44   Wednesday, July 02, 2014, 16:46 Grant MinorElevation JackStandard OperationCyclotron Lid-Up Report for 27 June 2014The cyclotron lid was raised on June 27th,
2014.  Start time was 1:05pm end time
was 2:17pm (good!) Dan McDonald collected
  
  43   Monday, April 28, 2014, 10:20 Dan McDonaldService BridgeMaintenanceBridge orbit reduction boxNoticed oil leaking out of reduction box,
scan and swipe, disconnect e motor and all
related cables from bridge, remove motor
  
  42   Tuesday, April 08, 2014, 10:45 Travis CaveShieldingStandard OperationLarge shield door on the RH B2 levelThe large shield door on the RH B2 level
of the remote handling building has been
shut.
  
  41   Monday, March 03, 2014, 15:07 Grant MinorElevation JackStandard OperationCyclotron Lid-Down Report Monday 3-March-2014The Cyclotron Lid Down was successfully
completed today on Work Permit C2014-03-03-6.
The system only tripped twice on
  
  40   Monday, March 03, 2014, 13:09 Travis CaveCyclotronStandard Operationshieldsall shields, porthole covers and ladder
out and copper blockers in. Some conmination
was found on the pads of the ladders (about
  
  39   Wednesday, February 26, 2014, 14:55 Travis CaveShieldingStandard OperationshieldsMore shields have been removed from the
cyclotron only 16 remain. I was also noted
that the lift trolley is making an odd noise
  
  38   Tuesday, February 25, 2014, 15:00 Travis CaveShieldingStandard OperationshieldsStarted on the removal of shields.   
  37   Friday, February 21, 2014, 15:58 Bevan MossCyclotronStandard OperationOld Monitor Box Removed, New installedDuring the electrical test the was no contact.
 To help investigate further the Montitor
box was removed from the Cyclotron. It was
  
  36   Friday, February 21, 2014, 11:05 Bevan MossCyclotronStandard OperationOld Monitor Box Removed, New installed One of the beam spill monitor boxes
was removed and placed into a lead coffin.
The fields around the coffin prior to the
 7x 
  35   Friday, February 07, 2014, 10:50 Travis CaveCyclotronStandard Operation2C install2C has been installed into the cyclotron.   
  34   Friday, January 31, 2014, 10:07 Travis CaveCyclotronStandard Operation2C removal2C has been successfully removed from the
cyclotron and is now currently sitting in
the B2 level of the RH building. A tank access
  