73
|
Tuesday, October 27, 2015, 07:50 |
maicodallavalle | Elevation Jack | Standard Operation | Service to Station # 9 Right side | Station #9 Cleaning of discoloration-
The right side Jack screw nut and
worm screw (mating parts in the right side |
9x |
|
72
|
Wednesday, September 30, 2015, 11:52 |
Isaac Earle | Elevation Jack | Standard Operation | Station 9 Jack Left Side - Inspection & Service Status | The left side jack was disassembled and
cleaned. It was discovered that the
left side had been rebuilt with a new jack |
15x |
|
71
|
Wednesday, September 30, 2015, 11:26 |
Isaac Earle | Elevation Jack | Standard Operation | Station 9 Jack Right Side - Unusual Wear Investigation | The following people were consulted
regarding the unusal wear noticed on jack
station #9 right side |
7x |
|
70
|
Thursday, September 17, 2015, 18:38 |
Grant Minor | Elevation Jack | Maintenance | Station 9 Jack Worm Gear Inspection - unusual wear markings 16Sept2015 | Unusual wear markings were observed on
the Station 9 jack (not sure if L or R jack?)
during a visual inspection. |
8x |
|
69
|
Tuesday, July 28, 2015, 11:47 |
Dan McDonald | Trolley | Maintenance | Camera trolley service | Serviced the Camera trolley this morning
as per Mike Gallops service outline. |
|
|
68
|
Thursday, April 16, 2015, 15:26 |
Grant Minor | Elevation Jack | Maintenance | Cyclotron Elevating System Maintenance Rotation Record - Updated 16 Apr 2015 | |
|
|
67
|
Thursday, April 02, 2015, 12:09 |
Dan McDonald | Cyclotron | Standard Operation | Lid Down operations April, 2, 2015 | Lid down Start at 11:17, lid went down
without any issues or stop's. Lid finish
at 11:45 |
|
|
66
|
Friday, March 27, 2015, 11:25 |
Travis Cave | Cyclotron | Standard Operation | Copper Blockers | Copper Blockers have been removed from
the cyclotron and one ladder has been installed. |
|
|
65
|
Friday, March 27, 2015, 07:31 |
Dan McDonald | Cyclotron | Repair | Lid up operations | Lid up recap for March 26th 2015.
Start time 14:50 |
|
|
64
|
Thursday, March 26, 2015, 15:48 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Up 26 March 2015 | Lid was raised today (2nd time during 2015
shutdown) for additional inflector work.
Dan and Maico report that the lid |
|
|
63
|
Thursday, March 19, 2015, 13:14 |
maicodallavalle | Shielding | Standard Operation | Remote Handling B2 level Shielding door | The Remote Handling B2 level Shielding
door has been closed. |
|
|
62
|
Tuesday, March 17, 2015, 13:04 |
maicodallavalle | Cyclotron | Maintenance | Upper Bearings Station #5 and #10 | The Upper bearings on Station #5 and Station
#10 have been serviced. The Upper Bearing
were disassembled. The old gear was removed |
|
|
61
|
Tuesday, March 10, 2015, 10:24 |
chad fisher | Elevation Jack | Maintenance | Contaminated equipment update | The harness, carabineer, and shock packed
used during the ISAC hot cell swipe have
been checked seperately by Mike and he has |
|
|
60
|
Monday, March 09, 2015, 11:55 |
chad fisher | Elevation Jack | Maintenance | Checking for contamination on fall arrest equip. | Fall equipment from the lockers in the
RH shop have been checked for contamination
and the lockers themselves have been swiped. |
|
|
59
|
Friday, March 06, 2015, 16:42 |
Grant Minor | Elevation Jack | Standard Operation | Lid-Down Report 6-March-2015 | Lid down started around 2:30 pm today (March
6th, 2015)
Master Start: 47422 |
|
|
58
|
Friday, March 06, 2015, 14:38 |
Travis Cave | Cyclotron | Standard Operation | Shield Removal | All shields and ladders have been removed
from the tank, all the port holes have been
uncovered, the tank seal has been vacuumed, |
|
|
57
|
Tuesday, February 17, 2015, 11:28 |
Travis Cave | Cyclotron | Standard Operation | 2C Installation | 2C extraction probe has been re-installed
in the cyclotron. After some problems on
the first install attempt, do to a busted |
|
|
56
|
Tuesday, February 17, 2015, 07:10 |
Dan McDonald | Trolleys serviced | Maintenance | Pre shut down trolley service | Routine maintenance as per Mike Gallop's
written procedure took place in December
with the only non routine service being the |
|
|
55
|
Wednesday, February 04, 2015, 13:57 |
Travis Cave | Cyclotron | Standard Operation | 2C removal | 2C has been removed from the cyclotron. |
|
|
54
|
Monday, February 02, 2015, 14:28 |
Travis Cave | Cyclotron | Standard Operation | Day five of in tank work | Final Radiation Survey done. All in tank
work completed bridge removed from the tank. |
|