101
|
Tuesday, March 14, 2017, 17:28 |
Jason Kapalka | Cyclotron | Maintenance | Lower resonator removal simulation exercice | A simulated removal of a lower resonator from
the Cyclotron tank was attempted by the RH
group using the
|
|
|
102
|
Tuesday, March 14, 2017, 17:57 |
Jason Kapalka | Cyclotron | Standard Operation | Lid raising and lowering operations | Lid up (Attempt #1)
Pre-indexed
|
|
|
104
|
Tuesday, January 09, 2018, 15:54 |
Jason Kapalka | Cyclotron | Standard Operation | Lid-up sequence (in-tank work) | 2018-01-09
07:00-10:00 - Pre-job meeting, informed main
control room of operation startup, lowered |
|
|
110
|
Friday, February 23, 2018, 15:44 |
Jason Kapalka | Elevation Jack | Repair | Replacement of Elevating System wiring | On January 8, 2018, while troubleshooting
the Cyclotron Elevating System during the
lid-up operation, the
|
|
|
21
|
Monday, March 18, 2013, 15:12 |
Isaac Earle | Cyclotron | Maintenance | Cyclotron Magnet Face Gap Measurements | Measurements of the cyclotron magnet face
gap were taken on March 15, 2013 at two locations
around the tank with the cyclotron lid in |
8x |
|
71
|
Wednesday, September 30, 2015, 11:26 |
Isaac Earle | Elevation Jack | Standard Operation | Station 9 Jack Right Side - Unusual Wear Investigation | The following people were consulted
regarding the unusal wear noticed on jack
station #9 right side |
7x |
|
72
|
Wednesday, September 30, 2015, 11:52 |
Isaac Earle | Elevation Jack | Standard Operation | Station 9 Jack Left Side - Inspection & Service Status | The left side jack was disassembled and
cleaned. It was discovered that the
left side had been rebuilt with a new jack |
15x |
|
82
|
Tuesday, February 16, 2016, 16:32 |
Isaac Earle | Cyclotron | Standard Operation | HE1 Probe Removed from Cyclotron | The HE1 Probe was removed from the cyclotron
this morning following the procedure in Document-126165
(currently in draft status, to be released |
|
|
83
|
Friday, February 19, 2016, 10:17 |
Isaac Earle | Cyclotron | Standard Operation | HE1 Probe Installed in Cyclotron | The HE1 Probe was reinstalled into
the cyclotron this morning following Section
3.2 in Document-126165 (to be reviewed and |
|
|
93
|
Thursday, February 09, 2017, 15:21 |
Isaac Earle | Cyclotron | Standard Operation | HE2 Probe Removed | The HE2 probe was
removed from the cyclotron today following |
|
|
94
|
Tuesday, February 21, 2017, 13:40 |
Isaac Earle | Cyclotron | Standard Operation | HE2 Probe Returned to Cyclotron | The HE2 probe was reinstalled in
the cyclotron this morning following the
procedure in Document #126165. An orbital |
|
|
106
|
Thursday, January 25, 2018, 17:16 |
Isaac Earle | Cyclotron | Standard Operation | HE1 probe removed | The HE1 probe was removed from the
cyclotron today using the procedure in Document
126165. The reason for removal is so |
|
|
107
|
Wednesday, January 31, 2018, 11:20 |
Isaac Earle | Cyclotron | Standard Operation | HE1 probe reinstalled | HE1 probe was reinstalled in the
cyclotron this morning as per the procedure
in Document 126165. Hardware for the |
|
|
2
|
Tuesday, February 07, 2012, 18:09 |
Grant Minor | Service Bridge | Repair | Service Bridge Center Post Bearing Maintenance and Orbit Counter (2011/2012) | Repair
of Orbit Limit Switch Plastic Belt
During |
|
|
3
|
Tuesday, February 14, 2012, 15:40 |
Grant Minor | Trolley | Standard Operation | 2C Removal - all 4 QDLs were actuated remotely this year! | Today Remote Handling staff (Maico Dalla
Valle, Travis Cave) used the Remote Handling
2C probe removal trolley to remove the probe |
|
|
7
|
Tuesday, January 29, 2013, 18:49 |
Grant Minor | Elevation Jack | Standard Operation | Lid-up complete - summary notes | Lid-up was first attempted yesterday (Jan
28th) by Dan Louie, Arthur Leung, and Maico
Dalla Valle. They experienced problems |
|
|
8
|
Wednesday, January 30, 2013, 14:44 |
Grant Minor | Elevation Jack | Standard Operation | Further lid-up notes from Dan Louie | Dan Louie's e-mail comments from 30 Jan
2013 are attached.
- Grant |
|
|
9
|
Monday, February 04, 2013, 13:52 |
Grant Minor | Service Bridge | Repair | Hydraulic cylinder failure on service bridge | The hydraulic cylinder on the West side
of the service bridge (used to raise the
bridge for insertion into the Cyclotron) |
6x |
|
10
|
Wednesday, February 06, 2013, 17:42 |
Grant Minor | Elevation Jack | Maintenance | In-situ jack power screw lubrication inspection - Stations 9, 10, 11, and 6 | Due to concerns raised regarding the state
of the lubrication of the power screws at
Station 9, the lubrication was visually inspected |
16x |
|
11
|
Wednesday, February 06, 2013, 17:50 |
Grant Minor | Elevation Jack | Maintenance | Service records compiled by G. Minor | Attached is a compiled record showing the
years of service of the jacks, upper bearing,
and gear reducers, prepared by Grant Minor |
|