  ID Date Authordown Category Type Subject Text Attachments
  101   Tuesday, March 14, 2017, 17:28 Jason KapalkaCyclotronMaintenanceLower resonator removal simulation exerciceA simulated removal of a lower resonator from
the Cyclotron tank was attempted by the RH
group using the 
  
  102   Tuesday, March 14, 2017, 17:57 Jason KapalkaCyclotronStandard OperationLid raising and lowering operationsLid up (Attempt #1)

Pre-indexed 
  
  104   Tuesday, January 09, 2018, 15:54 Jason KapalkaCyclotronStandard OperationLid-up sequence (in-tank work)2018-01-09
07:00-10:00 - Pre-job meeting, informed main
control room of operation startup, lowered
  
  110   Friday, February 23, 2018, 15:44 Jason KapalkaElevation JackRepairReplacement of Elevating System wiringOn January 8, 2018, while troubleshooting
the Cyclotron Elevating System during the
lid-up operation, the
  
  21   Monday, March 18, 2013, 15:12 Isaac EarleCyclotronMaintenanceCyclotron Magnet Face Gap MeasurementsMeasurements of the cyclotron magnet face
gap were taken on March 15, 2013 at two locations
around the tank with the cyclotron lid in
 8x 
  71   Wednesday, September 30, 2015, 11:26 Isaac EarleElevation JackStandard OperationStation 9 Jack Right Side - Unusual Wear InvestigationThe following people were consulted
regarding the unusal wear noticed on jack
station #9 right side
 7x 
  72   Wednesday, September 30, 2015, 11:52 Isaac EarleElevation JackStandard OperationStation 9 Jack Left Side - Inspection & Service StatusThe left side jack was disassembled and
cleaned.  It was discovered that the
left side had been rebuilt with a new jack
 15x 
  82   Tuesday, February 16, 2016, 16:32 Isaac EarleCyclotronStandard OperationHE1 Probe Removed from CyclotronThe HE1 Probe was removed from the cyclotron
this morning following the procedure in Document-126165
(currently in draft status, to be released
  
  83   Friday, February 19, 2016, 10:17 Isaac EarleCyclotronStandard OperationHE1 Probe Installed in Cyclotron The HE1 Probe was reinstalled into
the cyclotron this morning following Section
3.2 in Document-126165 (to be reviewed and
  
  93   Thursday, February 09, 2017, 15:21 Isaac EarleCyclotronStandard OperationHE2 Probe Removed The HE2 probe was
removed from the cyclotron today following
  
  94   Tuesday, February 21, 2017, 13:40 Isaac EarleCyclotronStandard OperationHE2 Probe Returned to Cyclotron The HE2 probe was reinstalled in
the cyclotron this morning following the
procedure in Document #126165.  An orbital
  
  106   Thursday, January 25, 2018, 17:16 Isaac EarleCyclotronStandard OperationHE1 probe removed The HE1 probe was removed from the
cyclotron today using the procedure in Document
126165.  The reason for removal is so
  
  107   Wednesday, January 31, 2018, 11:20 Isaac EarleCyclotronStandard OperationHE1 probe reinstalled HE1 probe was reinstalled in the
cyclotron this morning as per the procedure
in Document 126165.  Hardware for the
  
  2   Tuesday, February 07, 2012, 18:09 Grant MinorService BridgeRepairService Bridge Center Post Bearing Maintenance and Orbit Counter (2011/2012)Repair
of Orbit Limit Switch Plastic Belt
During
 Stripped_Orbit_Limit_Belt_Sept_23_2011.JPGBridge_Belt_Repair_Fall_2011.JPGOrbit_Counter_Wheel_Just_Before_Skip_Point.JPGD7900_detail_Feb_7_2012.JPGCyclotron_Orbit_Counter_Wheel_emails_Mar-Sep_2011.pdf 
  3   Tuesday, February 14, 2012, 15:40 Grant MinorTrolleyStandard Operation2C Removal - all 4 QDLs were actuated remotely this year!Today Remote Handling staff (Maico Dalla
Valle, Travis Cave) used the Remote Handling
2C probe removal trolley to remove the probe
 2C_probe_Feb_14_2012_labelled.JPG2C_probe_solenoid_5_Feb_14_2012_labelled.JPG 
  7   Tuesday, January 29, 2013, 18:49 Grant MinorElevation JackStandard OperationLid-up complete - summary notesLid-up was first attempted yesterday (Jan
28th) by Dan Louie, Arthur Leung, and Maico
Dalla Valle.  They experienced problems
 Jacks_Station_6_and_4_Procedure_Jan_12_2012_122.jpg 
  8   Wednesday, January 30, 2013, 14:44 Grant MinorElevation JackStandard OperationFurther lid-up notes from Dan LouieDan Louie's e-mail comments from 30 Jan
2013 are attached.
- Grant
 Dan_Louie_Lid-Up_e-mail_30Jan2013.pdf 
  9   Monday, February 04, 2013, 13:52 Grant MinorService BridgeRepairHydraulic cylinder failure on service bridgeThe hydraulic cylinder on the West side
of the service bridge (used to raise the
bridge for insertion into the Cyclotron)
 6x 
  10   Wednesday, February 06, 2013, 17:42 Grant MinorElevation JackMaintenanceIn-situ jack power screw lubrication inspection - Stations 9, 10, 11, and 6Due to concerns raised regarding the state
of the lubrication of the power screws at
Station 9, the lubrication was visually inspected
 16x 
  11   Wednesday, February 06, 2013, 17:50 Grant MinorElevation JackMaintenanceService records compiled by G. MinorAttached is a compiled record showing the
years of service of the jacks, upper bearing,
and gear reducers, prepared by Grant Minor
 Cyclotron_Elevation_Maintenance_Rotation_Record_17Dec2012.pdf 