|
ID |
Date |
Author |
Category |
Type |
Subject |
Text |
|
|
56
|
Tuesday, February 17, 2015, 07:10 |
Dan McDonald | Trolleys serviced | Maintenance | Pre shut down trolley service | Routine maintenance as per Mike Gallop's
written procedure took place in December
with the only non routine service being the |
|
|
19
|
Friday, March 15, 2013, 08:39 |
Don Jackson | Cyclotron | Standard Operation | Pre Lid Down In Tank Video Survey | In tank survey completed. A few items
of interest were found. Ladders need
to moved manually outboard to #5 resonators |
|
|
25
|
Thursday, January 16, 2014, 08:46 |
maicodallavalle | Trolleys serviced | Maintenance | Pre Cyclotron work servicing and checking | This is a list of all the trolleys and
other equipment witch were checked and serviced
prior to work in the Cyclotron. |
|
|
116
|
Monday, February 03, 2020, 11:06 |
Adam Newsome | Cyclotron | Development | Porthole Cover Handling Tool - Initial Test Report | The suction-cup based porthole cover handling
tool (TRH1366) was tested for the first time
inside the cyclotron as part of the regular |
|
|
108
|
Friday, February 02, 2018, 14:14 |
Don Jackson | Trolley | Repair | Overcurrent on radial drive motor |
|
|
|
182
|
Wednesday, June 12, 2024, 10:35 |
Riley Sykes | Trolleys serviced | Maintenance | Outriggers 1 and 2 Service | 1,2 and 5 Year service completed.
Vertical ball screws and chains inspected
and regreased with Chemours Krytox EG 2000 |
|
|
178
|
Friday, May 31, 2024, 11:28 |
Riley Sykes | Service Bridge | Maintenance | Outrigger mechanical inspection | Both outriggers were inspected and
were found to be mechanically sound. No damage
to components or hardware visible, will revisit |
|
|
114
|
Thursday, October 31, 2019, 14:31 |
Adam Newsome | Service Bridge | Repair | Outrigger 2 Vertical Drive Repair | Outrigger 2 vertical drive repair is complete
- ball screws were replaced to resolve a
jamming issue (this work was done in the |
|
|
151
|
Tuesday, March 28, 2023, 12:02 |
Nadia Jorgenson | Service Bridge | Repair | Outrigger 1 Failure and Repair |
During
the 2023 shutdown outrigger 1 failed. While |
|
|
156
|
Thursday, September 07, 2023, 13:21 |
Jason Zhang | Service Bridge | Development | Outrigger #1 and #2 individual testing complete | Outrigger #1 and #2 have had their controls
system overhauled as part of the O503 project.
The previous controls enclosure and the elements |
|
|
6
|
Thursday, October 25, 2012, 13:58 |
maicodallavalle | Service Bridge | Maintenance | Orbit Drive | It was observed during the last time the
Cyclotron service bridge was used the orbit
drive chain had a lot of slack. The drive |
|
|
74
|
Tuesday, January 05, 2016, 09:58 |
Travis Cave | Cyclotron | Standard Operation | Opened the shield door | The shield door on the B2 level has been
opened. |
|
|
36
|
Friday, February 21, 2014, 11:05 |
Bevan Moss | Cyclotron | Standard Operation | Old Monitor Box Removed, New installed | One of the beam spill monitor boxes
was removed and placed into a lead coffin.
The fields around the coffin prior to the |
7x |
|
37
|
Friday, February 21, 2014, 15:58 |
Bevan Moss | Cyclotron | Standard Operation | Old Monitor Box Removed, New installed | During the electrical test the was no contact.
To help investigate further the Montitor
box was removed from the Cyclotron. It was |
|
|
159
|
Wednesday, October 18, 2023, 12:35 |
Jason Zhang | Service Bridge | Development | O503 Bridge and Outrigger integration testing | Service bridge, Outrigger #1, and
Outrigger #2 have had the controls system
migrated to PLC controls. The 5069-AENTR |
|
|
125
|
Monday, November 09, 2020, 09:17 |
Adam Newsome | Infrastructure | Development | New crane pendant: B2 level crane | A new remote crane pendant was installed
to replace the existing wired pendant on
the B2 level of Remote Handling building |
|
|
124
|
Thursday, November 05, 2020, 15:38 |
Adam Newsome | Infrastructure | Development | New crane pendant: B1 level crane | A new remote crane pendant was installed
to replace the existing wired pendant on
the B1 level of Remote Handling building |
|
|
154
|
Friday, July 28, 2023, 12:05 |
Adam Newsome | Cyclotron | Development | Maintenance ladders: end caps added | The original end feet and end caps were
removed from the maintenance ladders and
replaced by new end caps (TRH1637). |
|
|
101
|
Tuesday, March 14, 2017, 17:28 |
Jason Kapalka | Cyclotron | Maintenance | Lower resonator removal simulation exercice | A simulated removal of a lower resonator from
the Cyclotron tank was attempted by the RH
group using the
|
|
|
130
|
Friday, February 26, 2021, 13:00 |
Adam Newsome | Trolleys serviced | Maintenance | Lower Resonator Trolley - Radial Drive Failure Issue | On Feb. 24 while practising a training
exercise, the lower resonator trolley unexpectedly
experienced a radial drive failure. The trolley |
|