31
|
Tuesday, January 28, 2014, 14:59 |
Travis Cave | Shielding | Standard Operation | shields | 200's, 400's, 500's, 600's, and a pallet
of 700's have been installed |
|
33
|
Thursday, January 30, 2014, 13:47 |
Travis Cave | Cyclotron | Standard Operation | shields | All shields, pothole covers, and ladders
have been installed into the cyclotron. |
|
34
|
Friday, January 31, 2014, 10:07 |
Travis Cave | Cyclotron | Standard Operation | 2C removal | 2C has been successfully removed from the
cyclotron and is now currently sitting in
the B2 level of the RH building. A tank access |
|
35
|
Friday, February 07, 2014, 10:50 |
Travis Cave | Cyclotron | Standard Operation | 2C install | 2C has been installed into the cyclotron. |
|
38
|
Tuesday, February 25, 2014, 15:00 |
Travis Cave | Shielding | Standard Operation | shields | Started on the removal of shields. |
|
39
|
Wednesday, February 26, 2014, 14:55 |
Travis Cave | Shielding | Standard Operation | shields | More shields have been removed from the
cyclotron only 16 remain. I was also noted
that the lift trolley is making an odd noise |
|
40
|
Monday, March 03, 2014, 13:09 |
Travis Cave | Cyclotron | Standard Operation | shields | all shields, porthole covers and ladder
out and copper blockers in. Some conmination
was found on the pads of the ladders (about |
|
42
|
Tuesday, April 08, 2014, 10:45 |
Travis Cave | Shielding | Standard Operation | Large shield door on the RH B2 level | The large shield door on the RH B2 level
of the remote handling building has been
shut. |
|
50
|
Tuesday, January 27, 2015, 14:40 |
Travis Cave | Cyclotron | Standard Operation | Day one of in tank work | Day one of RH in tank work for the cyclotron
(shields and blockers stuff like that) many
pictures were taken. |
|
51
|
Wednesday, January 28, 2015, 14:33 |
Travis Cave | Cyclotron | Standard Operation | Day two of in tank work | All copper blocker removed from the cyclotron
and first radiation survey done. Shields
start tomorrow. |
|
52
|
Thursday, January 29, 2015, 14:53 |
Travis Cave | Cyclotron | Standard Operation | Day three of in tank work | Over 50% of the shields are in some 700's
left and the monitor box covers. |
|
53
|
Friday, January 30, 2015, 15:02 |
Travis Cave | Cyclotron | Standard Operation | Day four of in tank work | All shields, ladders and pothole covers
are in. One rad survey left to do. |
|
54
|
Monday, February 02, 2015, 14:28 |
Travis Cave | Cyclotron | Standard Operation | Day five of in tank work | Final Radiation Survey done. All in tank
work completed bridge removed from the tank. |
|
55
|
Wednesday, February 04, 2015, 13:57 |
Travis Cave | Cyclotron | Standard Operation | 2C removal | 2C has been removed from the cyclotron. |
|
57
|
Tuesday, February 17, 2015, 11:28 |
Travis Cave | Cyclotron | Standard Operation | 2C Installation | 2C extraction probe has been re-installed
in the cyclotron. After some problems on
the first install attempt, do to a busted |
|
58
|
Friday, March 06, 2015, 14:38 |
Travis Cave | Cyclotron | Standard Operation | Shield Removal | All shields and ladders have been removed
from the tank, all the port holes have been
uncovered, the tank seal has been vacuumed, |
|
66
|
Friday, March 27, 2015, 11:25 |
Travis Cave | Cyclotron | Standard Operation | Copper Blockers | Copper Blockers have been removed from
the cyclotron and one ladder has been installed. |
|
74
|
Tuesday, January 05, 2016, 09:58 |
Travis Cave | Cyclotron | Standard Operation | Opened the shield door | The shield door on the B2 level has been
opened. |
|
78
|
Friday, February 05, 2016, 14:55 |
Travis Cave | Shielding | Standard Operation | shadow shields | all 200, 400, 500, 600, and some 700 series
of shield are in. |
|
79
|
Friday, February 05, 2016, 14:57 |
Travis Cave | Service Bridge | Maintenance | outrigger problem | outrigger 1 had a power failure, bridge
was removed power restored and outrigger
parked, outrigger will be looked at once |
|