  31   Tuesday, January 28, 2014, 14:59 Travis CaveShieldingStandard Operationshields

200's, 400's, 500's, 600's, and a pallet of 700's have been installed

  33   Thursday, January 30, 2014, 13:47 Travis CaveCyclotronStandard Operationshields

All shields, pothole covers, and ladders have been installed into the cyclotron.

  34   Friday, January 31, 2014, 10:07 Travis CaveCyclotronStandard Operation2C removal

2C has been successfully removed from the cyclotron and is now currently sitting in the B2 level of the RH building. A tank access was needed to feel the stuck QDL.

  35   Friday, February 07, 2014, 10:50 Travis CaveCyclotronStandard Operation2C install

2C has been installed into the cyclotron.

  38   Tuesday, February 25, 2014, 15:00 Travis CaveShieldingStandard Operationshields

Started on the removal of shields.

  39   Wednesday, February 26, 2014, 14:55 Travis CaveShieldingStandard Operationshields

More shields have been removed from the cyclotron only 16 remain. I was also noted that the lift trolley is making an odd noise and will be looked at after the shutdown.

  40   Monday, March 03, 2014, 13:09 Travis CaveCyclotronStandard Operationshields

all shields, porthole covers and ladder out and copper blockers in. Some conmination was found on the pads of the ladders (about a 1000 count or so) and was removed.

  42   Tuesday, April 08, 2014, 10:45 Travis CaveShieldingStandard OperationLarge shield door on the RH B2 level

The large shield door on the RH B2 level of the remote handling building has been shut.

  50   Tuesday, January 27, 2015, 14:40 Travis CaveCyclotronStandard OperationDay one of in tank work

Day one of RH in tank work for the cyclotron (shields and blockers stuff like that) many pictures were taken.

  51   Wednesday, January 28, 2015, 14:33 Travis CaveCyclotronStandard OperationDay two of in tank work

All copper blocker removed from the cyclotron and first radiation survey done. Shields start tomorrow.

  52   Thursday, January 29, 2015, 14:53 Travis CaveCyclotronStandard OperationDay three of in tank work

Over 50% of the shields are in some 700's left and the monitor box covers.

  53   Friday, January 30, 2015, 15:02 Travis CaveCyclotronStandard OperationDay four of in tank work

All shields, ladders and pothole covers are in. One rad survey left to do.

  54   Monday, February 02, 2015, 14:28 Travis CaveCyclotronStandard OperationDay five of in tank work

Final Radiation Survey done. All in tank work completed bridge removed from the tank.

  55   Wednesday, February 04, 2015, 13:57 Travis CaveCyclotronStandard Operation2C removal

2C has been removed from the cyclotron.

  57   Tuesday, February 17, 2015, 11:28 Travis CaveCyclotronStandard Operation2C Installation

2C extraction probe has been re-installed in the cyclotron. After some problems on the first install attempt, do to a busted micro-switch that was causing the 24 Volt DC system to short out.

  58   Friday, March 06, 2015, 14:38 Travis CaveCyclotronStandard OperationShield Removal

All shields and ladders have been removed from the tank, all the port holes have been uncovered, the tank seal has been vacuumed, and the copper blockers installed into the cyclotron.

  66   Friday, March 27, 2015, 11:25 Travis CaveCyclotronStandard OperationCopper Blockers

Copper Blockers have been removed from the cyclotron and one ladder has been installed.

  74   Tuesday, January 05, 2016, 09:58 Travis CaveCyclotronStandard OperationOpened the shield door

The shield door on the B2 level has been opened.

  78   Friday, February 05, 2016, 14:55 Travis CaveShieldingStandard Operationshadow shields

all 200, 400, 500, 600, and some 700 series of shield are in.

  79   Friday, February 05, 2016, 14:57 Travis CaveService BridgeMaintenanceoutrigger problem

outrigger 1 had a power failure, bridge was removed power restored and outrigger parked, outrigger will be looked at once the shield are done hopefully.