  IDdown Date Author Status Test Subject Text Attachments
  64   Monday, December 16, 2024, 12:15 Aaron SchmidtCompleted Q4 - 2024 Ball Mill Calibration & Inspection  Fritsch Pulverisette
5 Ball Mill status:
 Q4_-_2024_Ball_Mill_Calibration&_Inspection.png 
  63   Thursday, November 21, 2024, 11:48 Aaron Schmidt  Change glove on Ar Glove box (2) Thursday, November 21, 2024, 11:46:
2 Glovebox gloves were changed. The far right
glove & the far left glove. 
  
  62   Tuesday, October 15, 2024, 09:21 Darwin Ortiz RosalesFixed Hotlab glovebox catalyst regenerationTuesday, October 15, 2024, 09:22 
The glovebox catalyst was regenerated. 
No issues.  Removed TCE and PVB from
  
  61   Thursday, August 01, 2024, 15:03 Darwin Ortiz Rosales   Ultrasonicator in Cold Lab:  The ultrasonicator
cooling lines and their operation was checked. 
The functionality of the probe and operation
  
  60   Thursday, August 01, 2024, 15:01 Darwin Ortiz Rosales  EVAP1 and EVAP2 Inspection and MaintenanceThursday, August 01, 2024, 14:56
EVAP1:  Checked seal and no
visible deterioration was observed. 
  
  59   Thursday, July 11, 2024, 13:40 Aaron Schmidt  Q2 - 2024 Ball Mill Calibration & Inspection Fritsch Pulverisette
5 Ball Mill status:
 Q2_-2024_Ball_Mill_Calibration_&_inspection.jfifQ2_-_2024_Clean_up.jfif 
  58   Thursday, June 20, 2024, 13:33 Darwin Ortiz RosalesFixed Glovebox inspection ISAC1 B1 L06 Thursday, June 20, 2024, 13:28
All lines, pump, blower, were
  
  57   Monday, April 15, 2024, 10:52 Aaron SchmidtFixed Ar Glove box RP swapped. Monday, April 15, 2024, 10:50: The
old IDP15 RP was not pumping the antechamber
down properly. An exchange IDP15 pump is
  
  56   Wednesday, March 27, 2024, 13:42 Keyur Chauhan  Actinide Mass Balance Calibration ISAC-I B1 Hot Lab ISAC-1
B1 Hot Lab actinide mass balance calibration
 Actinide_Mass_Balance_-_27_Mar_2024.pdf 
  55   Tuesday, March 12, 2024, 15:21 Darwin Ortiz RosalesFixed Glovebox regeneration and O2 sensor replacement(B1 L06, Hotlab)Tuesday, March 12, 2024, 15:21
Hotlab ISAC1 B1 


Normal
0
  
  54   Friday, February 09, 2024, 11:01 Aaron Schmidt  Laser cutter inspection Friday, February 09, 2024, 11:01:
Epilog laser cutter operates. OK
  
  53   Friday, January 19, 2024, 10:20 Darwin Ortiz RosalesFixed Glovebox regeneration (B1 L06, Hotlab)Friday, January 19, 2024, 10:19 
This is a belated entry.  The
regeneration was performed successfully on
  
  52   Friday, January 19, 2024, 10:18 Darwin Ortiz RosalesFixed Inspection of Glovebox inside B1 L06 (hotlab)Friday, January 19, 2024, 10:10 
This is a belated entry.  The
inspection was performed on December 19,
  
  51   Tuesday, December 12, 2023, 13:12 Aaron Schmidt  Q4 - 2023 Ball Mill Calibration & Inspection    Fritsch   
  50   Thursday, November 30, 2023, 10:03 Aaron SchmidtFixed Ar Glove box - Blower / solenoid fix On November 10th / 11th a site wide
power outage occured. Once power was restored,
the Ar glove box had intermittent issues
  
  49   Tuesday, August 01, 2023, 12:31 Darwin Ortiz Rosales  Evap1 and Evap2 Inspection and MaintenanceEvap1:  Cleaned and checked seals. 
Oil level could not be clearly determined,
but are consulting with pump group to check.
  
  48   Friday, June 30, 2023, 12:21 Aaron Schmidt  Q2 - 2023 Ball Mill Calibration & Inspection   Fritsch  Q2_-_2023_Ball_Mill_Calibration_&_Inspection.png 
  47   Tuesday, June 20, 2023, 15:11 Darwin Ortiz RosalesFixed Inspection ISAC 1 B1 L06 GloveboxOn Monday June 19th, the Glove box was
inspected.  Gas lines, solenoids, pump,
argon usage, state of gloves and gas levels
  
  46   Tuesday, April 18, 2023, 17:40 Keyur ChauhanFixed1Actinide Mass Balance CalibrationISAC-1 B1 Hot Lab
actinide mass balance calibration was carried
out on April 18, 2023, at 10:40 a.m. with
 Actinide_Mass_Balance_-_18_Apr_2023.pdf 
  45   Thursday, February 02, 2023, 10:30 Aaron Schmidt  Eyewash & Shower Station OK Thursday, February 02, 2023, 10:14:
Cold Lab Eyewash & shower station ran.
Ok.
  