ID |
Date |
Author |
Status |
Test |
Subject |
Text |
|
|
9
|
Friday, August 19, 2011, 10:04 |
John Wong | Under Process | 1 | Evaporator#1 glovebox repairing | The evaporator#1 glovebox is leaking from
the gloves, around the ports, and the base
(possible more places). It is evident |
|
|
10
|
Thursday, September 08, 2011, 15:41 |
Anders Mjos | Fixed | 1 | Evaporator#1 glovebox repairing |
|
|
|
34
|
Wednesday, August 05, 2020, 19:50 |
Darwin Ortiz Rosales | Fixed | 1 | Hot Lab Glove Box Regeneration | Wednesday, August 05, 2020, 19:34
On Friday July 31 a regeneration
of the glovebox was started. |
|
|
46
|
Tuesday, April 18, 2023, 17:40 |
Keyur Chauhan | Fixed | 1 | Actinide Mass Balance Calibration | ISAC-1 B1 Hot Lab
actinide mass balance calibration was carried
out on April 18, 2023, at 10:40 a.m. with |
|
|
1
|
Wednesday, March 30, 2011, 16:47 |
John Wong | | | All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down | All the fumehood pumps in the ISAC-I hot
and cold labs got tripped off when the MCC-X
was powered down (See ISAC WP#2011-03-30-5). |
|
|
2
|
Tuesday, April 12, 2011, 12:03 |
John Wong | | | Hot Lab Glove Box Regeneration | Tue Apr 12 12:00:52 2011: The hot
lab glove box regeneration was started yesterday
(April 11, 2011). "Before regeneration, |
|
|
3
|
Tuesday, April 12, 2011, 12:07 |
John Wong | | | All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down |
|
|
|
4
|
Wednesday, April 13, 2011, 13:54 |
John Wong | | | Cloth booties now avaiable for hotlab | Wed Apr 13 13:53:46 2011
I've setup a box of cloth booties
for entering the hotlab. They are
washable |
|
|
5
|
Friday, May 13, 2011, 11:59 |
John Wong | Fixed | | Uranium Waste Container Removed from Hotlab | Fri May 13 11:55:37 2011: The contain
in the uranium waste container was removed
and transferred into a beaker and sealed. |
|
|
6
|
Tuesday, June 21, 2011, 16:38 |
John Wong | Fixed | | Planetary Ball Mill Re-Commisioning | Tue Jun 21 16:30:48 2011:
Re-Cap: On June 13, 2011, the
milling jar gasket seal partially came out |
|
|
7
|
Friday, June 24, 2011, 18:00 |
John Wong | Under Process | | TIS New Users | Hi All,
As requested by Pierrer Bricault,
I have added the following users to |
|
|
8
|
Tuesday, July 19, 2011, 16:26 |
John Wong | Fixed | | Planetary Ball Mill moved to Hotlab | Tuesday, July 19, 2011, 16:22: The
planetary ball mill was in the coldlab, and
now it has moved to the hot lab for the purpose |
|
|
11
|
Thursday, February 23, 2012, 13:38 |
Anders Mjos | Fixed | | Water leak in chemistry / cold lab | Please see attached file for notes
on the water leak from the cold lab fume
hood Tuesday Feb 21. |
|
|
12
|
Tuesday, February 28, 2012, 12:01 |
John Wong | | | TIS/RH Users | Tuesday, February 28, 2012, 11:31
Hi All,
Hope you all find the TIS/RH elog |
|
|
13
|
Friday, March 15, 2013, 13:55 |
Anders Mjos | | | Non active water off for a short time (10 - 15 min) | ISAC operations called to check that equipment
in the labs were OK for the non active water
to be off for a short time. I gave the OK |
|
|
14
|
Wednesday, November 26, 2014, 14:01 |
Laura Lambert | | | | |
|
|
15
|
Thursday, March 16, 2017, 09:32 |
Aaron Schmidt | Fixed | | D.H.W water pipe replacement | Fri 03/03/2017 17:00 - A water leak was noticed
on the D.H.W line. Hot water to the Cold
lab was shut down.
Wed 15/03/17 11:00 |
|
|
16
|
Wednesday, April 05, 2017, 08:22 |
Aaron Schmidt | Fixed | | D.H.W.R Leak | When: 04/04/17 Between 09:00 & 11:30
Where:
ISAC 1 – Cold Lab
Who: Ron Murray & Aaron
Schmidt
A pin hole leak was found in the |
|
|
17
|
Thursday, July 13, 2017, 15:12 |
Laura Lambert | Under Process | | D.H.W leak in SEM lab | Thursday, July 13, 2017, 14:53
Same pipe that had a leak in the
cold lab ~1 month ago now has leak in SEM |
|
|
18
|
Tuesday, August 08, 2017, 14:55 |
Laura Lambert | | | Glove box Alarm | Tuesday, August 08, 2017, 14:28
Alarm for glove box went off this
afternoon. |
|