7
|
Friday, June 24, 2011, 18:00 |
John Wong | Under Process | | TIS New Users | Hi All,
As requested by Pierrer Bricault,
I have added the following users to |
|
|
9
|
Friday, August 19, 2011, 10:04 |
John Wong | Under Process | 1 | Evaporator#1 glovebox repairing | The evaporator#1 glovebox is leaking from
the gloves, around the ports, and the base
(possible more places). It is evident |
|
|
17
|
Thursday, July 13, 2017, 15:12 |
Laura Lambert | Under Process | | D.H.W leak in SEM lab | Thursday, July 13, 2017, 14:53
Same pipe that had a leak in the
cold lab ~1 month ago now has leak in SEM |
|
|
29
|
Monday, January 13, 2020, 13:27 |
Aaron Schmidt | Under Process | | Leaking pipe in HC area | Monday, January 13, 2020, 10:30:
Leak noted in HC area by Chad to ISAC Ops.
|
|
|
41
|
Thursday, April 07, 2022, 12:00 |
Aaron Schmidt | Under Process | | Ar Glove box issue & LaC removal. | Thursday, April 07, 2022, 11:55:
It was noticed on Wednesday that
the glove box was not regulating pressure |
|
|
5
|
Friday, May 13, 2011, 11:59 |
John Wong | Fixed | | Uranium Waste Container Removed from Hotlab | Fri May 13 11:55:37 2011: The contain
in the uranium waste container was removed
and transferred into a beaker and sealed. |
|
|
6
|
Tuesday, June 21, 2011, 16:38 |
John Wong | Fixed | | Planetary Ball Mill Re-Commisioning | Tue Jun 21 16:30:48 2011:
Re-Cap: On June 13, 2011, the
milling jar gasket seal partially came out |
|
|
8
|
Tuesday, July 19, 2011, 16:26 |
John Wong | Fixed | | Planetary Ball Mill moved to Hotlab | Tuesday, July 19, 2011, 16:22: The
planetary ball mill was in the coldlab, and
now it has moved to the hot lab for the purpose |
|
|
10
|
Thursday, September 08, 2011, 15:41 |
Anders Mjos | Fixed | 1 | Evaporator#1 glovebox repairing |
|
|
|
11
|
Thursday, February 23, 2012, 13:38 |
Anders Mjos | Fixed | | Water leak in chemistry / cold lab | Please see attached file for notes
on the water leak from the cold lab fume
hood Tuesday Feb 21. |
|
|
15
|
Thursday, March 16, 2017, 09:32 |
Aaron Schmidt | Fixed | | D.H.W water pipe replacement | Fri 03/03/2017 17:00 - A water leak was noticed
on the D.H.W line. Hot water to the Cold
lab was shut down.
Wed 15/03/17 11:00 |
|
|
16
|
Wednesday, April 05, 2017, 08:22 |
Aaron Schmidt | Fixed | | D.H.W.R Leak | When: 04/04/17 Between 09:00 & 11:30
Where:
ISAC 1 – Cold Lab
Who: Ron Murray & Aaron
Schmidt
A pin hole leak was found in the |
|
|
22
|
Monday, April 09, 2018, 15:59 |
Laura Lambert | Fixed | | Glove box leak in hot lab | Friday, April 06, 2018, 16:21
Over the long weekend ~1000psi was
used up, indicating a leak somewhere in the |
|
|
25
|
Wednesday, April 24, 2019, 10:19 |
Aaron Schmidt | Fixed | | Cold Lab back sink leak |
Wednesday, April 24, 2019,
10:00: |
|
|
34
|
Wednesday, August 05, 2020, 19:50 |
Darwin Ortiz Rosales | Fixed | 1 | Hot Lab Glove Box Regeneration | Wednesday, August 05, 2020, 19:34
On Friday July 31 a regeneration
of the glovebox was started. |
|
|
42
|
Thursday, April 07, 2022, 12:21 |
Aaron Schmidt | Fixed | | Ar glove box roughing pump. | Thursday, April 07, 2022, 12:00: While
preparing to remove LaC, the roughing pump
(1) stopped operating. It didn't appear to |
|
|
46
|
Tuesday, April 18, 2023, 17:40 |
Keyur Chauhan | Fixed | 1 | Actinide Mass Balance Calibration | ISAC-1 B1 Hot Lab
actinide mass balance calibration was carried
out on April 18, 2023, at 10:40 a.m. with |
|
|
47
|
Tuesday, June 20, 2023, 15:11 |
Darwin Ortiz Rosales | Fixed | | Inspection ISAC 1 B1 L06 Glovebox | On Monday June 19th, the Glove box was
inspected. Gas lines, solenoids, pump,
argon usage, state of gloves and gas levels |
|
|
50
|
Thursday, November 30, 2023, 10:03 |
Aaron Schmidt | Fixed | | Ar Glove box - Blower / solenoid fix | On November 10th / 11th a site wide
power outage occured. Once power was restored,
the Ar glove box had intermittent issues |
|
|
52
|
Friday, January 19, 2024, 10:18 |
Darwin Ortiz Rosales | Fixed | | Inspection of Glovebox inside B1 L06 (hotlab) | Friday, January 19, 2024, 10:10
This is a belated entry. The
inspection was performed on December 19, |
|