  64   Monday, December 16, 2024, 12:15 Aaron SchmidtCompleted Q4 - 2024 Ball Mill Calibration & Inspection

 Fritsch Pulverisette 5 Ball Mill status:

Monday, December 16, 2024, 12:12:

SN 05.6010 / 03005: Inspected. Ok. 

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

 

Attachment 1: Q4_-_2024_Ball_Mill_Calibration&_Inspection.png
Q4_-_2024_Ball_Mill_Calibration&_Inspection.png
  63   Thursday, November 21, 2024, 11:48 Aaron Schmidt  Change glove on Ar Glove box (2)

 Thursday, November 21, 2024, 11:46: 2 Glovebox gloves were changed. The far right glove & the far left glove. 

No contamination was found on the sealing edges of the glove box. Both old gloves were placed in bags & placed in the alpha waste bin.

Work Permit: I2024-11-21-2

Note* Changing both inner gloves is recommended later. We had considered to do both however the O2 ppm spiked after the change of the first two. We were at 185 ppm & aim to not cross 200 ppm.


Additional info:

The remaining gloves were inspected and appeared in acceptable condition.  A regeneration was performed shortly after and the gas lines, pump lines were also inspected.  This will be considered as the inspection for the current inspection cycle.

Darwin

  62   Tuesday, October 15, 2024, 09:21 Darwin Ortiz RosalesFixed Hotlab glovebox catalyst regeneration

Tuesday, October 15, 2024, 09:22

The glovebox catalyst was regenerated.  No issues.  Removed TCE and PVB from inside the glovebox.  These were vestiges from the previous UCx production process.

  61   Thursday, August 01, 2024, 15:03 Darwin Ortiz Rosales   

Ultrasonicator in Cold Lab:  The ultrasonicator cooling lines and their operation was checked.  The functionality of the probe and operation software was checked.  Visual inspection of probes and water receptacle showed good operational condition. 

  60   Thursday, August 01, 2024, 15:01 Darwin Ortiz Rosales  EVAP1 and EVAP2 Inspection and Maintenance

Thursday, August 01, 2024, 14:56

EVAP1:  Checked seal and no visible deterioration was observed.  Oil level in roughing pump was good.  Circulated argon to observe functionality of the gloves and to check appropriate gas flow. 

EVAP2:  Visually inspected the connections at the back of the evaporator.  A loose connection had been observed on the previous day but fixed.  Roughing pump running well and system operational.  The door seal could not be checked but it is working properly as evidenced by the fact that the evaporator was in use. No major maintenance required at this moment.

  59   Thursday, July 11, 2024, 13:40 Aaron Schmidt  Q2 - 2024 Ball Mill Calibration & Inspection

Fritsch Pulverisette 5 Ball Mill status:

Thursday, July 11, 2024, 13:39:

SN 05.6010 / 03005: Inspected. Ok. Was dirty inside. Cleaned.

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

Attachment 1: Q2_-2024_Ball_Mill_Calibration_&_inspection.jfif
Attachment 2: Q2_-_2024_Clean_up.jfif
  58   Thursday, June 20, 2024, 13:33 Darwin Ortiz RosalesFixed Glovebox inspection ISAC1 B1 L06

 Thursday, June 20, 2024, 13:28

All lines, pump, blower, were found in working condition. From a previous issue with corrosion of lines connecting pumps, it is recommended that we check the ability of the pump to achieve full vacuum during inspections.  Currently full vacuum was observed while checking.  

The nipple connecting the argon gas tank to the regulator needs replacing.  Aaron will order it.  

  57   Monday, April 15, 2024, 10:52 Aaron SchmidtFixed Ar Glove box RP swapped.

 Monday, April 15, 2024, 10:50: The old IDP15 RP was not pumping the antechamber down properly. An exchange IDP15 pump is loaned to us from vacuum group. Once the tip seals on it are replaced, we will swap it again.

Applicable work permit: I2024-04-12--2. Status: Returned. 

  56   Wednesday, March 27, 2024, 13:42 Keyur Chauhan  Actinide Mass Balance Calibration ISAC-I B1 Hot Lab

 ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on March 27, 2024, at 11:10 a.m. with an accuracy of 0.00%.

Attachment 1: Actinide_Mass_Balance_-_27_Mar_2024.pdf
Actinide_Mass_Balance_-_27_Mar_2024.pdf
  55   Tuesday, March 12, 2024, 15:21 Darwin Ortiz RosalesFixed Glovebox regeneration and O2 sensor replacement(B1 L06, Hotlab)

Tuesday, March 12, 2024, 15:21

Hotlab ISAC1 B1

I performed a regeneration of the glovebox catalyst.  I also swapped the O2 sensor as the old one had outlived its useful life.  The glovebox will be reestablishing equilibrium for a day or two.  Please do not panic if you see high moisture or O2 values, all is good.   Thanks,

 

 

Darwin

  54   Friday, February 09, 2024, 11:01 Aaron Schmidt  Laser cutter inspection

 Friday, February 09, 2024, 11:01: Epilog laser cutter operates. OK

  53   Friday, January 19, 2024, 10:20 Darwin Ortiz RosalesFixed Glovebox regeneration (B1 L06, Hotlab)

Friday, January 19, 2024, 10:19

This is a belated entry.  The regeneration was performed successfully on December 20th, 2023. 

  52   Friday, January 19, 2024, 10:18 Darwin Ortiz RosalesFixed Inspection of Glovebox inside B1 L06 (hotlab)

Friday, January 19, 2024, 10:10

This is a belated entry.  The inspection was performed on December 19, 2023.  A leak on one of the lines from the regulator (regeneration gas) was fixed. No other issues were found. 

All lines, pump, blower, were found in working condition. 

A regeneration can proceed.

 

  51   Tuesday, December 12, 2023, 13:12 Aaron Schmidt  Q4 - 2023 Ball Mill Calibration & Inspection

   Fritsch Pulverisette 5 Ball Mill status:

Tuesday, December 12, 2023, 13:11:

SN 05.6010 / 03005: Inspected. Ok

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

  50   Thursday, November 30, 2023, 10:03 Aaron SchmidtFixed Ar Glove box - Blower / solenoid fix

 On November 10th / 11th a site wide power outage occured. Once power was restored, the Ar glove box had intermittent issues with the solenoids & blower. The blower did not start & the solenoids often got stuck or ceased operating. 

Yesterday Randy B inspected the connections to see if they were receiving enough power. It was good from the main plug-in, through to the PLC, however was dead at fuse positions 3 & 4 on the rear panel. Both fuses were changed, but that did not help. We did some fidgeting in the back & the solenoid function returned. It was left overnight.

Thursday, November 30, 2023, 08:30: <- Approx. Initial check: Dropped a crumpled Kimwipe inside the glove box to check for air flow / blower function. It did not move. Blower was not functioning, but the solenoids did. De-energized the glove box completely. 

Removed the old corroded fuse holders, added a pair of modified new ones. Cleaned a couple of corroded critical connections. Installed the new fuses, re-plugged it back in. Function returned to normal. The Kimwipe was also moving, verifying the blower is again operational. 

Thursday, November 30, 2023, 09:51: Complete. 

  49   Tuesday, August 01, 2023, 12:31 Darwin Ortiz Rosales  Evap1 and Evap2 Inspection and Maintenance

Evap1:  Cleaned and checked seals.  Oil level could not be clearly determined, but are consulting with pump group to check.

Evap2: Cleaned and checked seals. 

  48   Friday, June 30, 2023, 12:21 Aaron Schmidt  Q2 - 2023 Ball Mill Calibration & Inspection

  Fritsch Pulverisette 5 Ball Mill status:

Friday, June 30, 2023, 12:20:

SN 05.6010 / 03005: Inspected. Ok

SN 05.6000 / 00365: Currently disassembled / out of service. (Under Process status until repaired, re-assembled, inspected, & tested)

Attachment 1: Q2_-_2023_Ball_Mill_Calibration_&_Inspection.png
Q2_-_2023_Ball_Mill_Calibration_&_Inspection.png
  47   Tuesday, June 20, 2023, 15:11 Darwin Ortiz RosalesFixed Inspection ISAC 1 B1 L06 Glovebox

On Monday June 19th, the Glove box was inspected.  Gas lines, solenoids, pump, argon usage, state of gloves and gas levels were checked. 

The only note is that we have one pair of spare gloves for the glove box and we don't have a spare for the Evap1 glove box.  We will try to order spare for the Evap1 glove box.

  46   Tuesday, April 18, 2023, 17:40 Keyur ChauhanFixed1Actinide Mass Balance Calibration

ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on April 18, 2023, at 10:40 a.m. with an accuracy of 0.01%.

Attachment 1: Actinide_Mass_Balance_-_18_Apr_2023.pdf
Actinide_Mass_Balance_-_18_Apr_2023.pdf
  45   Thursday, February 02, 2023, 10:30 Aaron Schmidt  Eyewash & Shower Station OK

 Thursday, February 02, 2023, 10:14: Cold Lab Eyewash & shower station ran. Ok.