Entry  Friday, June 24, 2011, 18:00, John Wong, Under Process, , TIS New Users  elog_demo.png
Hi All,
As requested by Pierrer Bricault,  I have added the following users to join the Targets and Ion Source (TIS) elog: 
Grant Minor, Bevan Moss, Don Jackson, Chad Fisher, Travis Cave, David Wang, Tom Lyth, Ron Kuramoto, Maico Dalla Valla, Ron Muller. 
Entry  Friday, August 19, 2011, 10:04, John Wong, Under Process, 1, Evaporator#1 glovebox repairing 
The evaporator#1 glovebox is leaking from the gloves, around the ports, and the base (possible more places).  It is evident that there were holes
on the gloves.  When the glovebox is purged with Ar gas, one can feel that the gas is blown out from the base.  
Solutions:
Entry  Thursday, July 13, 2017, 15:12, Laura Lambert, Under Process, , D.H.W leak in SEM lab IMG_1713.JPGIMG_1715.JPGIMG_1716.JPGIMG_1719.JPG
 Thursday, July 13, 2017, 14:53
Same pipe that had a leak in the cold lab ~1 month ago now has leak in SEM lab.
Small amount of water on floor and ceiling tile was brown and very bulgey - looked like it was about to collapse.
Entry  Monday, January 13, 2020, 13:27, Aaron Schmidt, Under Process, , Leaking pipe in HC area Leak_location.jpg20200113_113443.jpg20200113_120206.jpg
 Monday, January 13, 2020, 10:30: Leak noted in HC area by Chad to ISAC Ops.
 
Monday, January 13, 2020, 13:32: The water leak was found to be coming from the sinks in the ISAC B1 Cold Lab. Target cleaning was occurring at
Entry  Thursday, April 07, 2022, 12:00, Aaron Schmidt, Under Process, , Ar Glove box issue & LaC removal. 
 Thursday, April 07, 2022, 11:55:
It was noticed on Wednesday that the glove box was not regulating pressure properly & the H2O sensor was reading (Very unstable) anywhere from
30 ppm to 0.25%. The box was isolated & checked for leaks. Unable to vent properly except manually.
Entry  Friday, May 13, 2011, 11:59, John Wong, Fixed, , Uranium Waste Container Removed from Hotlab 
Fri May 13 11:55:37 2011:  The contain in the uranium waste container was removed and transferred into a beaker and sealed.  The total waste
mass = 12.59g, over 100K CPM.  The container is double bagged and will be removed from the Hotlab. 
Entry  Tuesday, June 21, 2011, 16:38, John Wong, Fixed, , Planetary Ball Mill Re-Commisioning  
Tue Jun 21 16:30:48 2011: 
Re-Cap:  On June 13, 2011, the milling jar gasket seal partially came out during the high speed milling (400RPM), and the ball mill was contaminated
with UO2/C mixture (See TIS/Target Production message ID#9, UCx#2, for more details).
Entry  Tuesday, July 19, 2011, 16:26, John Wong, Fixed, , Planetary Ball Mill moved to Hotlab Screen_shot_2011-07-19_at_4.21.04_PM.png
 Tuesday, July 19, 2011, 16:22:  The planetary ball mill was in the coldlab, and now it has moved to the hot lab for the purpose of processing
UCx targets.  The ball mill is installed in front of the fumehood and near by the alpha filters.  The legs are secured in the metal rings so
the machine will not move away during milling.  (see attachment).
    Reply  Thursday, September 08, 2011, 15:41, Anders Mjos, Fixed, 1, Evaporator#1 glovebox repairing 


    
        
            John Wong wrote:
        
        
            
            The evaporator#1 glovebox is leaking from the gloves, around the ports, and the base (possible more
Entry  Thursday, February 23, 2012, 13:38, Anders Mjos, Fixed, , Water leak in chemistry / cold lab Notes_on_water_leak_ISAC_I.docx
 Please see attached file for notes on the water leak from the cold lab fume hood Tuesday Feb 21.
Entry  Thursday, March 16, 2017, 09:32, Aaron Schmidt, Fixed, , D.H.W water pipe replacement DHW_pipe_replacement.docx
Fri 03/03/2017 17:00  - A water leak was noticed on the D.H.W line. Hot water to the Cold lab was shut down.

Wed 15/03/17 11:00 – 14:45. The insulation
was removed. A pin hole leak was found in the D.H.W waterline. Soldering/replacement of new copper pipe was required. The smoke alarm in the Cold Lab was
disabled during the work period.

The corroded copper pipe section was replaced. An insulating tape was added where the pipe rests on another metal joint;
Entry  Wednesday, April 05, 2017, 08:22, Aaron Schmidt, Fixed, , D.H.W.R Leak 
When: 04/04/17 Between 09:00 & 11:30
Where: ISAC 1 – Cold Lab
Who: Ron Murray & Aaron Schmidt
A pin hole leak was found in the previously repaired D.H.W.R
waterline. Soldering of new copper pipe was done. The fire alarm 051-046 in the ISAC Cold Lab was disabled. We removed a copper pipe section out into the
hallway and stopped around 6 ft past the door to the ISAC cold lab. We did find a second smaller leak outside past the door.

Background: 
-Fri 03/03/2017
Entry  Monday, April 09, 2018, 15:59, Laura Lambert, Fixed, , Glove box leak in hot lab GetImage.jpgGetImage_(1).jpgGetImage_(2).jpgGetImage_(3).jpg
 Friday, April 06, 2018, 16:21
Over the long weekend ~1000psi was used up, indicating a leak somewhere in the glove box. 
Tests over the past few days showed ~150psi leaked in 48hrs.
Entry  Wednesday, April 24, 2019, 10:19, Aaron Schmidt, Fixed, , Cold Lab back sink leak 
 
 Wednesday, April 24, 2019, 10:00:
The sink to the rear of the cold lab beneath the paper towel dispenser has sprung a leak. The leak is most apparent when the hot water tap is used.
Entry  Wednesday, August 05, 2020, 19:50, Darwin Ortiz Rosales, Fixed, 1, Hot Lab Glove Box Regeneration 
Wednesday, August 05, 2020, 19:34
On Friday July 31 a regeneration of the glovebox was started.
Initial 02 = 130 ppm
Entry  Thursday, April 07, 2022, 12:21, Aaron Schmidt, Fixed, , Ar glove box roughing pump. 
Thursday, April 07, 2022, 12:00: While preparing to remove LaC, the roughing pump (1) stopped operating. It didn't appear to seize, just no longer powered
up. Multiple outlets attempted. Vacuum group contacted & they brought us a replacement.
Thursday, April 07, 2022, 12:21: Pump was replaced. (Pump 2).
Entry  Tuesday, April 18, 2023, 17:40, Keyur Chauhan, Fixed, 1, Actinide Mass Balance Calibration Actinide_Mass_Balance_-_18_Apr_2023.pdf
ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on April 18, 2023, at 10:40 a.m. with an accuracy of 0.01%.
Entry  Tuesday, June 20, 2023, 15:11, Darwin Ortiz Rosales, Fixed, , Inspection ISAC 1 B1 L06 Glovebox 
On Monday June 19th, the Glove box was inspected.  Gas lines, solenoids, pump, argon usage, state of gloves and gas levels were checked.  
The only note is that we have one pair of spare gloves for the glove box and we don't have a spare for the Evap1 glove box.  We will try to
order spare for the Evap1 glove box.
Entry  Thursday, November 30, 2023, 10:03, Aaron Schmidt, Fixed, , Ar Glove box - Blower / solenoid fix 
 On November 10th / 11th a site wide power outage occured. Once power was restored, the Ar glove box had intermittent issues with the solenoids
& blower. The blower did not start & the solenoids often got stuck or ceased operating. 
Yesterday Randy B inspected the connections to see if they were receiving enough power. It was good from the main plug-in, through to the PLC,
Entry  Friday, January 19, 2024, 10:18, Darwin Ortiz Rosales, Fixed, , Inspection of Glovebox inside B1 L06 (hotlab) 
Friday, January 19, 2024, 10:10 
This is a belated entry.  The inspection was performed on December 19, 2023.  A leak on one of the lines from the regulator (regeneration
gas) was fixed. No other issues were found.  