Entry  Thursday, September 10, 2020, 07:53, Aaron Schmidt, Empty, 41790-8, LP-FEBIAD, Done, Fernando FEBIAD / Anode testing. 

 FEBIAD installed. Anode PS installed. ANODE connected!.

Leak check

Thursday, September 10, 2020, 07:46: Vacuum @ 6.30e-07T

Thursday, September 10, 2020, 07:47: HS Waterline open. Stable vacuum.

Thursday, September 10, 2020, 07:51: Auto-ramp TGHT / TBHT to 400 / 200 A @ 2 A per min. 


FM

Thursday, September 10, 2020, 13:28: Pyrometer aligned.  Current reading 1106.7 @ slope=0.9

Thursday, September 10, 2020, 13:46: Auto-ramp TGHT / TBHT to 580/ 250A @ 2 A per min. 

Thursday, September 10, 2020, 13:47: Recording pyrometer data 

Thursday, September 10, 2020, 15:33: Auto-ramp finished. Temperature=1568.0 @slope=0.9

Thursday, September 10, 2020, 15:35: Voltage power supply limited to 150 mA.

Thursday, September 10, 2020, 15:36: Voltage power supply is set to output. Nothing strange on the other PS.

Thursday, September 10, 2020, 15:42: Slowly increased the voltage to 150 V but nothing read. two times during the voltage sweep the current on the Ps showed 1mA. Nothing strangeon the vacumm or the other power supply voltages

Thursday, September 10, 2020, 15:45: Auto-rampup TBHT to 290 @ 2A/min 

Thursday, September 10, 2020, 16:08: Voltage sweep  

Thursday, September 10, 2020, 17:24: Auto-rampup to 300 @ 2A/min


Friday, September 11, 2020, 11:05: Auto-ramping to 290 @ -2A/min 

Friday, September 11, 2020, 13:22: auto-ramping to 305 @ 2A/min 

Friday, September 11, 2020, 14:10: The power supply is not reading current anymore. At 305 A I couldn't get any reading. I lowered the current to 290 A and the PS displays 0 mA even at 500 V, whereas before it showed 13 mA.

Vacuum looks normal not any sort of spike.

I will open the system to inspect the interior.

Friday, September 11, 2020, 14:15: Auto-cooling to 0 A TGHT/TBHT @-2A/min 


Saturday, September 12, 2020, 10:52: Venting 

Saturday, September 12, 2020, 14:00: Confirmed anode de-attached. I will spot welded again. 

Saturday, September 12, 2020, 18:29: After many failures I aborted the spot welding. The anode ended up looking pretty bad. 


 Sunday, September 13, 2020, 19:06: Opened waterlines. Vacuum still decreasing.

Monday, September 14, 2020, 09:12: Vacuum @  8.15e-7 T. and decreasing. I will start the ramping now.

Monday, September 14, 2020, 09:28: Auto-ramping to 400/200 A @ 4/min (1 A/15 s) .

No reading on the 2-color pyrometer channel. 1-color channels indicate around 1000C

 Monday, September 14, 2020, 12:49: Recording temperature and vacuum. Auto-ramp TBHT to 210 @ 4A/min.

 Monday, September 14, 2020, 12:57: Emissivity slope sweep. Only "under" is being shown

Monday, September 14, 2020, 12:58:  Auto-ramp TBHT to 220 @ 4A/min. 

Monday, September 14, 2020, 13:05: Emissivity slope sweep. Only "under" is being shown

Monday, September 14, 2020, 13:06: Auto-ramp TBHT to 240 @ 4A/min.  

Monday, September 14, 2020, 13:17: Auto-ramp TBHT to 250 @ 4A/min.   

Monday, September 14, 2020, 13:22: Emissivity slope sweep. Only "under" is being shown 

Monday, September 14, 2020, 13:23: Auto-ramp TBHT to 260 @ 4A/min.    

Monday, September 14, 2020, 13:27 : Emissivity slope sweep. Only "under" is being shown 

Monday, September 14, 2020, 13:27 : Auto-ramp TBHT to 275 @ 4A/min.    

Monday, September 14, 2020, 13:36: Emissivity slope sweep. Only "under" is being shown for the 2-color channel. 1-color channel displays around 1200 C. Maybe there is a different  cutoff for the 2-color channel

Monday, September 14, 2020, 13:38: At 400V the PS reads back 1mA 

Monday, September 14, 2020, 13:39 : Auto-ramp TBHT to 290 @ 4A/min.   

Monday, September 14, 2020, 17:41: Roughing 


Tuesday, September 15, 2020, 07:03: Vacuum stable at 4.65e-7T.

Tuesday, September 15, 2020, 07:03:  Auto-ramp TGHT / TBHT to 400/ 200A @ 4 A per min. 

Tuesday, September 15, 2020, 10:00:  Auto-ramp TGHT  to 500 @ 4 A per min. 

Tuesday, September 15, 2020, 11:13:  Auto-ramp  TBHT to 250@ 4 A per min. 

Tuesday, September 15, 2020, 15:44: There is a short inside the system. I  thought it might be the vanadium wire but increasing the tbht current did not indicate a clear evaporation so I don't think this is the case.

I'll ramp down to 0 at 8A/min to open and inspect. My measurements don't make any sense without both the pyrometer and the anode leakage current reading.

Tuesday, September 15, 2020, 15:49: Auto-cooling TGHT/TBHT to 0A at 8A/min (2A /15 s).

 Tuesday, September 15, 2020, 16:00: Auto-cooling aborted, the system is no longer current limited. The contact causing the issue probably moved while cooling.

***many ramp ups.downs, Temperature measurements, voltage sweeps, inverse temperature estimations. Absolute temperature measurements for when the vanadium wire melted, the pyrometer was already reading 1920, a slightly adjust on the emissivity slope move it to 1911C

Tuesday, September 15, 2020, 18:47: Ramp down TGHT/TBHT to 500/250 A @ -1A/min

Tuesday, September 15, 2020, 18:48: Done for today. 


Wednesday, September 16, 2020, 10:02: Auto-ramp up TGHT/TBHT to 580/285 A @ 2A/min 

Wednesday, September 16, 2020, 12:59: Auto-ramp  up TGHT/TBHT to 600 A @ 2 A/min 

Wednesday, September 16, 2020, 13:45: Auto-ramp up TBHT to 290 A @ 1A/min 

Wednesday, September 16, 2020, 18:45: Auto-ramp down TGHT/TBHT to 400/200 A @ -2A/min 


Thursday, September 17, 2020, 08:46: Auto-ramp up TBHT to 285 A @ 2A/min 

Thursday, September 17, 2020, 12:03: Auto-cooling TGHT/TBHT to 0A @ -4A/min

Thursday, September 17, 2020, 13:49: Turbo off. Roughing pump off 

Entry  Saturday, September 05, 2020, 21:33, Marla Cervantes, Empty, , , Done, Pristine Ta tube calibration 

Saturday, September 05, 2020, 12:56

A Ta tube was wrapped with 3 tantalum foils,

a tantalum cap was inserted in both sides of the Ta tube, the caps weren't sealed.

The tube was set in the EVAP2 

IGP1 = 3.6e-7 Torr 


Saturday, September 05, 2020, 12:57

Autoram set to 10A/30 s to 200 A


 Saturday, September 05, 2020, 13:11

TGHT = 2.7 V, 198.9 A

IGP1 =3e-6 Torr

Autoramp set to to 300 A at 5A/30s 


 Saturday, September 05, 2020, 14:45

IGP1 = 5.1e-7 torr

TGHT = 4.5 V, 303 A

Oemga = 1259 C, 

AP = 1233.5 C

 

Autoramp set to 450A at 5 A/30s 


 Saturday, September 05, 2020, 15:05

TGHT = 7.3 V, 457.7 A

IGP1 = 2.8e-6 Torr

Omega = 1722 °C

AP = 1572.2 °C


Saturday, September 05, 2020, 15:16 

TGHT = 9.2 V, 552.5 A

IGP1 = 7.5e-6 Torr

Omega = 2016 °C 

AP= 1735.9 °C


 

Saturday, September 05, 2020, 21:33 

IGP1 = 1.1e-6 Torr

TGHT = 11.2 V, 651.9 A

Omega = 2300 °C

Entry  Monday, August 31, 2020, 12:57, Marla Cervantes, , 44489-15 , , Done, TaC coating heating test 

 Monday, August 31, 2020, 12:23

A short naked Ta tube (no heat shielding), previously coated with TaC was set under vacuum, 

and it will be kept at 2000 °C for 3 days to later identify the TaC's carbon penetration.

Currently pumping down.


 Tuesday, September 01, 2020, 12:25

IGP1 = 2.0-7 Torr

Good vacuum = 3e-2 Torr

Bad vacuum = 5e-2Torr

Autoram set to 200A at 10A/30 s


Tuesday, September 01, 2020, 12:36

IGP1 = 5.2e-7 Torr

Autoramp set to 300 A at 5 A/30 s 


Tuesday, September 01, 2020, 14:11

IGP1 = 3.4e-7 Torr 

TGHT = 330.2 A, 4.2 V

Omega = 1234 °C


Tuesday, September 01, 2020, 14:31

IGP1 = 1.76e-6 torr

TGHT = 6.94 V, 510 A

Oemga = 1564 C, 

AP = 1390.2 C

Autoramp set to 600 A at 5 A/30s 


Tuesday, September 01, 2020, 15:33

TGHT power supply = 600 A, 8.74 V

Omega = 1807 C

Autoramp set to 700 A at same rate


 Tuesday, September 01, 2020, 15:33

TGHT power supply = 11.94 V, 765 A

Omega = 2157 °C


Wednesday, September 02, 2020, 10:15 

IGP1 = 1.0e-6 Torr

TGHT = 12.0 V, 772 A

Omega = 2167 °C


Wednesday, September 02, 2020, 13:26

IGP1  = 9.1e-7 Torr

TGHT = 12 V, 769.5 A

Omega = 2166 °C 


Wednesday, September 02, 2020, 16:06

IGP1 = 8e-7 Torr

TGHT = 12 V, 773.3 A

Omega = 2167 °C 


Wednesday, September 02, 2020, 20:53

IGP1 =7.4e-7 Torr

TGHT = 11.8 V, 760.95 A

Omega = 2164 °C 


Thursday, September 03, 2020, 09:54

IGP1 = 5.5e-7 Torr

TGHT = 11.9 V, 774 A

Omega = 2162 °C 


Thursday, September 03, 2020, 11:06

IGP1 = 5.3e-7 Torr

TGHT  = 11.9 V, 758.7A

Omega = 2161 °C


Thursday, September 03, 2020, 14:39

IGP1 = 4.8e-7 Torr 

TGHT = 11.9 V, 771.8 A

Omega = 2164 °C


Friday, September 04, 2020, 09:34

IGP1 = 3.9e-7 Torr

TGHT = 11.9 V, 760.1 A

Omega = 2168 °C 


Friday, September 04, 2020, 13:39

 IGP1 = 3.5e-7 Torr

TGHT = 11.9 V, 758.6 A

Omega = 2170 °C


 Friday, September 04, 2020, 15:55

IGP1 = 3.5e-7 Torr

TGHT = 12 v, 760.6 a

Omega = 2171 °C


 

Entry  Sunday, August 30, 2020, 18:28, Marla Cervantes, Empty, 44489-13, , Done, TaC coating/sintering 

 Sunday, August 30, 2020, 06:47

A short tantalum tube was coated with TaC and wrapped with 3 layers of Ta,

a Ta cap was inserted to the end of the tube to be able to measure the temperature during heating

Desired temperature= 1900 C,

Omega Slope set = 0.990


Sunday, August 30, 2020, 06:48

IGP1 = 3.9e-7 Torr

Autoramp set to 0.5A/min to 400 A 


Sunday, August 30, 2020, 18:27

IGP1 8.41e-7 Torr

TGHT = 4.2 V, 327.15 A

Omega  = 1367 °C 


Sunday, August 30, 2020, 18:49

IGP1 = 9.6e-7 Torr

TGHT = 4.4 V, 337.1 a

Omega = 1402 °C 


Sunday, August 30, 2020, 19:25

IGP1 = 9.5e-7 Torr

TGHT = 4.6 A, 347.5 A

Omega = 1472 °C 

Autoramp set to 450 A at 0.1A/30s


Sunday, August 30, 2020, 19:59

IGP1 = 8.5e-7 Torr

TGHT = 4.8 V, 360.5 A

Omega = 1510 °C


 Sunday, August 30, 2020, 22:07

IGP1 = 7.2e-7 Torr

TGHT = 5.3 V, 392.6 A

Omega = 1675 °C 


 Sunday, August 30, 2020, 22:16

IGP1 = 7.1e-7 Torr

TGHT = 5.5 V, 403.2 A

Omega = 1678 °C

Autoramp set to 450 at 0.1A/min


 Sunday, August 30, 2020, 22:26

IGP1 = 6.9e-7 Torr

TGHT = 5.5 V, 399.15 A

Omega = 1689 °C


Monday, August 31, 2020, 08:08

IGP1 = 4.4e-7 Torr

TGHT = 6.4 V, 453.4

Omega =  1852 °C


Monday, August 31, 2020, 08:12 

Autorap set to 0 A at -5 A/min

Entry  Wednesday, August 26, 2020, 10:27, Marla Cervantes, , 44489-8, , Done, C-Cartridge test #2 

 Wednesday, August 26, 2020, 10:26

A Ta short tube was loaded with a C-cartridge

Currently, the tube is under vacuum and it will be heated to 2000 °C during 3 days.

IGP1 = 3.2e-7 Torr


 Wednesday, August 26, 2020, 16:15

IGP1 = 2.5e-7 Torr

Good vacuum = 3e-2 Torr

Bad vacuum = 5e-2Torr

Autoram set to 200A at 10A/30 s


Wednesday, August 26, 2020, 17:05

TGHT = 3.9 V, 301.3 A

IGP1 = 5.4e-7 torr 

Omega = 1378 °C

AP (slope 0.9) = 1441.8 °C


Wednesday, August 26, 2020, 17:20 

Autoramp set to 550 A at 5A/30s


Wednesday, August 26, 2020, 23:43 

TGHT = 7.561 V, 504.9 A

Omega = 2124 °C

AP = 2010.5 °C


Thursday, August 27, 2020, 07:15

TGHT =  7.461 V, 510.2 A

Omega = 2103 °C


 Thursday, August 27, 2020, 13:41

TGHT = 7.5 V, 510.8 A

Omega = 2099 °C


Friday, August 28, 2020, 09:24

TGHT = 7.4 V, 513.9 A 

Omega = 2103 °C


Friday, August 28, 2020, 13:12

TGHT = 7.46 V, 505.6 A

IGP1 = 2.7e-7 Torr

Omega = 2103 °C


Saturday, August 29, 2020, 14:18

IGP1 = 2.5e-7 Torr

TGHT = 7.5 V, 510.8 A

Omega = 2109 °C 


Saturday, August 29, 2020, 17:44

IGP1 = 2.4e-7 Torr

TGHT = 7.5 V, 505.2 A

Omega = 2119 °C 


Saturday, August 29, 2020, 17:51 

Starting ramp down to 0 A at 5 A/min

Entry  Saturday, August 22, 2020, 11:44, Marla Cervantes, , 44489-11, , Done, C-Cartridge test#1 

Saturday, August 22, 2020, 11:41

A Ta short tube was coated with TaC and sintered, then it was loaded with a c-cartridge

Now is currently under vacuum and it will be heated to 2000 °C during 3 days


Saturday, August 22, 2020, 11:43

Good vacuum = 3e-2 Torr

Bad vacuum = 5e-2Torr

IGP1 = 3.08e-7 Torr 

Autoram set to 10A/30 s to 200 A


 Saturday, August 22, 2020, 11:59

Good vacuum = 3e-2 Torr

Bad vacuum = 5e-2Torr

TGHT = 2.36 V, 200.1 A

IGP1 =2.46e-6 Torr

Autoramp set to to 300 A at 5A/30s 


Saturday, August 22, 2020, 13:03

TGHT = 7.32 V, 495.3 A

IGP1 = 2.7e-6 Torr

Omega = 2016 °C

AP = 1970.1 °C

Autoramp set to 550 A at 5A/30s


 Saturday, August 22, 2020, 13:11

TGHT =7.6 V, 523.2 A

IGP1 = 3.2e-6 Torr

Omega = 2077 °C


Monday, August 24, 2020, 07:59

Voltage increased ~0.2 V while current remained the same indicating an increment in resistance, temperature increment increased accordingly

TGHT = 7.815 V, 520.87 A

Omega = 2126 °C


Monday, August 24, 2020, 08:04

The current was reduced 0.1 A to 519.9

Monday, August 24, 2020, 08:55 Omega =  2112 °C


Monday, August 24, 2020, 09:12

The temperature returned to Omega = 2130 °C

The current was reduced 0.1 A to 519.8

Monday, August 24, 2020, 09:56

TGHT = 7.7 V, 518.3 A

Omega = 2132 °C 


Monday, August 24, 2020, 09:59 

The current was reduced 0.2 A to 519.6 A

TGHT = 7.7 V, 517.3 A

Monday, August 24, 2020, 10:07  Omega = 2130°C


 Monday, August 24, 2020, 10:08

The current was reduced 0.4 A to 519.2 A

TGHT = 7.7 V, 513.5 A

Monday, August 24, 2020, 10:13  Omega = 2129°C


Monday, August 24, 2020, 10:21

Voltage dropped to 7.6 V and temperature reduced to 2105 °C

Monday, August 24, 2020, 10:30

Voltage increased to 7.8 V and temperature increased to 2128 °C


Monday, August 24, 2020, 10:33

The current was reduced 0.4 A to 518.6 A

TGHT = 7.7 V, 513.06 A

Monday, August 24, 2020, 10:38  Omega = 2130 ­°C


Monday, August 24, 2020, 10:41

 The current was reduced 0.4 A to 518.2 A

Monday, August 24, 2020, 10:52 Omega = 2134 °C

Monday, August 24, 2020, 11:13 

 The current was reduced 0.4 A to 517.8 A

Monday, August 24, 2020, 11:19  Omega = 2128 °C


Monday, August 24, 2020, 11:19 

 The current was reduced 0.4 A to 517.4 A

Monday, August 24, 2020, 11:22  Omega = 2126


Monday, August 24, 2020, 11:22

 The current was reduced 0.4 A to 517.0 A

Monday, August 24, 2020, 11:25  Omega = 2123 °C


Monday, August 24, 2020, 11:26

 The current was reduced 0.4 A to 516.6 A 

Monday, August 24, 2020, 11:30  Omega = 2109 °C


Monday, August 24, 2020, 11:30 

 The current was reduced 0.4 A to 516.2 A

Monday, August 24, 2020, 11:36  Omega = 2100 °C


Monday, August 24, 2020, 11:37

  The current was reduced 0.4 A to 516.0 A

TGTH = 7.5 V, 512.9 A

Omega = 2095 °C


Monday, August 24, 2020, 14:17

Voltage dropped and later on increased 

TGHT = 7.7 V, 517.5 A

Omega = 2120 °C 


Monday, August 24, 2020, 14:18

 The current was reduced 0.4 A to 515.6 A

TGHT = 7.6 V, 509.4 A

Monday, August 24, 2020, 14:20  Omega = 2125 °C


Monday, August 24, 2020, 14:20

The current was reduced 0.4 A to 515.2 A

Monday, August 24, 2020, 14:22  Omega = 2122 °C


Monday, August 24, 2020, 14:22

 The current was reduced 0.4 A to 514.8 A

Monday, August 24, 2020, 14:29  Omega = 2116 °C


Monday, August 24, 2020, 15:27

The voltage dropped as well as the temperature

TGHT = 7.5 V, 512.5 A 

Monday, August 24, 2020, 15:28 Omega = 2095 °C


Monday, August 24, 2020, 22:06

TGHT = 7.6 V, 515.9 A 

Omega = 2105 °C


Tuesday, August 25, 2020, 09:07

TGHT = 7.6 V, 519.13 A

Omega = 2102 °C 


Tuesday, August 25, 2020, 13:02

TGHT = 7.6 V, 518.0 A

Omega = 2116 °C

IGP1 = 3e-7 Torr


Tuesday, August 25, 2020, 13:04 

Starting ramp down to 0 A at 5 A/min 

Entry  Tuesday, August 18, 2020, 10:41, Marla Cervantes, TaC, 44489-11, , Done, TaC coating/sintering  

Thursday, August 19, 2020, 17:28

 A short tantalum tube was coated with TaC and wrapped with 3 layers of Ta,

a Ta foil was attached to the end of the tube to be able to measure the temperature during heating

Desired temperature= 1900 C,

Omega Slope set = 0.990,


Thursday, August 20, 2020, 17:29

IGP1 = 4.25 e-7 Torr

Autoramp set to 0.5A/min to 400 A 


 Thursday, August 20, 2020, 20:36

IGP1 = 6.78e-7 Torr

TGHT = 267.7 A, 3.28 V

Autoramp set to 0.4 A/min to 450 A


Friday, August 21, 2020, 10:28

 IGP1=7.23e-7 torr

TGHT = 6.3 v, 446.3 A

Omega = 1603 °C

Autoramp set to -5 A/min

Entry  Tuesday, August 18, 2020, 09:26, Marla Cervantes, TaC, 44489-15, TARGET BOAT, Done, TaC coating/sintering  

 Tuesday, August 18, 2020, 09:06

A short tantalum tube was coated with TaC and wrapped with 3 layers of Ta,

a Ta foil was attached to the end of the tube to be able to measure the temperature during heating

Desired temperature= 1900 C,

Omega Slope set = 0.990,

IGP1 = 3.75e-7 Torr

Autoramp set to TGHT at 0.2 A/min to reach 52 A


Tuesday, August 18, 2020, 13:47

IGP1=  6.8e-7 Torr

TGHT =0 .511 V, 51.3 A

IGP1 = 6.8e-7 Torr

Autoramp set to TGHT at 0.5 A/min to reach 100 A


Tuesday, August 18, 2020, 20:39

IGP1 = 3.3e-7 Torr

Autoramp set to TGHT at 0.5 A/min to reach 430 A 


Wednesday, August 19, 2020, 06:57 

Autoramp stopped at 402 A

IGP1 = 1.12e-6 Torr

TGHT = 5.6 V, 403.65 A

Autoramp set to TGHT at 1 A/min to reach 500 A 


Wednesday, August 19, 2020, 08:59

IGp1 = 1.7e-6 Torr

 TGHT = 7.22 V, 500.34 A

After 30 min at 1900 °C, autoramp set to TGHT at -1 A/min to reach 450 A, the ramp will be stopped when the temperature reads 1850 °C

Autoramp stopped at 1845 °C

IGP1 = 1.17e-6 Torr

TGHT = 6.8 V, 472.95 A 

Entry  Wednesday, August 12, 2020, 11:57, Marla Cervantes, Empty, 44489-9, TARGET BOAT, Done, Pristine Ta tube calibration 

 Short oven loaded with additional hardware are spacers into the flex-line HS.

A Ta short tube was wrapped with 3 tantalum foils,

a tantalum cap was inserted in both sides of the Ta tube, the caps weren't sealed.

The tube was set in the EVAP2 

Wednesday, August 12, 2020, 11:48: Electrical check in EVAP 2:

Target to HS @ 563V 

Leg to leg above bracket

TGHT A @ 10A: 1.332 mOhm

TGHT B @ 10A: 1.300 mOhm

Leg to leg w/ bracket

TGHT A @ 10A: 1.490 mOhm

TGHT B @ 10A: 1.491 mOhm

Wednesday, August 12, 2020, 12:08: Roughing.

Wednesday, August 12, 2020, 2:08: Turbo.


Thursday, August 13, 2020, 09:14

 IGP1 = 7.9e-7 Torr

A leak check was performed, no leak detected.

 TGHT power supply on.

Thursday, August 13, 2020, 10:03

IGP1 = 7.7e-7 Torr.

The current was tapped to 50 A 

Autoramp set to 1 A each 10 s to 200 A

Good vaccum 3e-5 Torr

Bad vacuum 5e-5 torr


Thursday, August 13, 2020, 10:47

Autoramp reached 200 A

TGHT =  200.25 A, 2.38 V

IGP1 = 1.58e-6 Torr


 Thursday, August 13, 2020, 11:07

TGHT =  200.25 A, 2.38 V

IGP1 = 9.66e-7 Torr

Target is shinning dimly

Omega reads 1033 +-50 degC

ARIEL pyrometer is installed in the back of the EVA2 to measured the body temperature of the oven


Thursday, August 13, 2020, 15:30

The connection of the pyrometer with the software was not possible to establish and delay the ramp up of the oven


Friday, August 14, 2020, 10:47

Restarting experiment, 

IGP1 =  4.24e-7 Torr

TGHT = 0 A, ) V, (TGHT was ramped down)

Autoramp set to 1 A each 10 s to 200 A

Good vaccum 3e-5 Torr

Bad vacuum 5e-5 torr


Friday, August 14, 2020, 11:48

Target is shinning dimly

Omega reads 1033 +-50 degC

Autoramp set to 1 A each 10 s to 250 A

Autoramp set to 5 A each 60 s to 450 A


Friday, August 14, 2020, 13:51

TGHT = 6.46 V, 450.13 A

IGP1 = 2.32e-6 Torr

Omega = 1931 °C (slope 0.99)

ARIEL pyrometer = 1504.5 °C (slope 0.929)


Friday, August 14, 2020, 14:06

Autoramp = 5A each 2 min until 500 

Autoranp stopped at 475 A (EPICS TGHT = 6.87V, 476.663A)

Omega = 2013 °C

ARIEL pyrometer = 1547 °C


Friday, August 14, 2020, 17:34

Autoramp is set to  5A each 2 min until 500 

TGHT = 7.403 V, 500.006 A, 

omega = 2104 C

AP= 1586 C


Friday, August 14, 2020, 17:49

Autoramp  is set to  5A each 2 min until 550 

Autoramp stopped by itself at 545 A instead of 550 A

TGHT = 8.11V, 547.65A, 

omega = 2214C

AP= 1656.8 C

IGP1=6.8e-6 Torr


Friday, August 14, 2020, 18:13

 Autoramp  is set to  10A each 2 min until 600


Friday, August 14, 2020, 21:42

TGHT = 9.213 V, 597.8 A,

IGP1 3.27e-6 Torr

Omega =  2380 °C

Ramping down at 5 A per min to 475 A


Monday, August 17, 2020, 09:02

TGHT =  6.741 V, 471.6 A,

IGP1 = 3.46e-7 Torr

Omega = 2052 6°C 

Proceeded to ramp down at  5 A per min to 0 A 

Entry  Wednesday, August 12, 2020, 08:58, Aaron Schmidt, , , , In progress, Install Flex line HS 

Flex line HS installed. New SS gaskets. 

Wednesday, August 12, 2020, 08:56: Roughing (Check).

Wednesday, August 12, 2020, 09:17: Ready for turbo pump.

Wednesday, August 12, 2020, 09:20: BP1 Off. Venting. 

Entry  Tuesday, August 11, 2020, 10:17, Ferran Boix Pamies, Empty, 41882-1, TARGET BOAT, In progress, Contamination foils temperature test 

The target was prepared and put under vacuum on 2020-08-10

 

2020-08-11 10:16am The pressure is 1e-6Torr. Leak checked performed, water on no problem. Starting to set target heating curve. 1A/10s up to 300A 

2020-08-11 11:23am target at 300A-1200degC Temperatures on exposed foil show to be higher than expected. 300degC already, 70degC on covered by foil thermocouple. Putting 50 more amps at 1A/10s 

2020-08-11 12:11pm target at 350A-1340degC. 350degC on exposed thermocouple. Ramping to 400A 1A/10s.

2020-08-11 12:28pm target at 400A-1420degC. 400degC on exposed thermocouple. Ramping to 450A 1A/10s.

Entry  Wednesday, August 05, 2020, 19:14, Ferran Boix Pamies, Empty, 41882-1, TARGET BOAT, Done, Parasitic target cooling test 

 2020-08-05 7.13pm Roughing pump on

2020-08-06 10:48am Turbo was turned on by Marla in the morning. Vacuum IGP1 4e-6Torr. Water leak check performed, everything good to start heating up target. Waiting for Anders confirmation to start.

2020-08-06 4:38pm after changing setup to metallic connections only. Roughing on. After some minutes abnormal behavior in vacuum.

Turning water off to see if it is a small water leak.

Water purged, no change in vacuum.

 

IEVAP2:RV1 was closed. After opening, normal vacuum behavior recovered. The valve is automatically closing when reaching 100Torr. Wasn't doing that before. Turbo on now.

2020-08-07 9:24am pumping over night, vacuum at 8e-7torr. Everything ready for test. Ramping up target heater.Up to 50A 1A/20s

2020-08-07 9:48am all good at 50A, ramping to 250 1A/10s

2020-08-07 10:27am all good at 250A, ramping to 400 1A/10s

2020-08-07 10:57am all good at 400A, ramping to 500 1A/10s

2020-08-07 11:17am Tc type C might have been deatached at 500A, ramping to 600 1A/10s

2020-08-07 11:37am All good, ramping to 700 1A/10s

2020-08-07 11:58am 1950degC on pyrometer, 1200degC on type C TC (probably not well attached anymore), TCs on heatshield [30-40]degC. Pressure 9e-6Torr

2020-08-07 12:44pm All values stable after 45min, starting to ramp up parasitic target heating elements.

2020-08-07 1:15pm Open circuit, would seem that one of the heating elements cracked. Cooling down the target.

 

Entry  Wednesday, August 05, 2020, 13:38, Aaron Schmidt, , , , , RP Swap on EVAP 2 

 BP1 swapped with RP2 (TS beamline)

U-line installed.

Wednesday, August 05, 2020, 13:37: Roughing. 

Wednesday, August 05, 2020, 13:39: Open RV1 to EVAP 2 chamber.

Wednesday, August 05, 2020, 14:08: Turbo pump on. 

Wednesday, August 05, 2020, 14:17: Turbo pump on (green) / Shut - off. 

Wednesday, August 05, 2020, 14:18: BP1 off. Runs ok. 

Entry  Friday, July 31, 2020, 11:16, Ferran Boix Pamies, Empty, 41882-1, TARGET BOAT, Done, Thermocouple measurent of boat temperature 

Boat with attached thermocouple type C with AREMCO ceramabond glue installed in evap2 the 30-07-2020

Vacuum 3.2e-6torr in IGP1 after night with the roughing pump and morning with turbo.

TGHT heater on.

ramp up started

1A/20s up to 200A

Thermocouple de-attached at about 400A.

Target cooled down. 1A/10s

Turbo and roughing pump off. System left with present vacuum over night. Tomorrow inspection.

Entry  Saturday, July 25, 2020, 08:58, Darwin Ortiz Rosales, ZrC, 44139-7-SK, , In progress, ZrC for Luca's experiments 

Friday, July 24, 2020, 15:00

Ta tube cotaining 497 ZrC discs wrapped with Ta heat-shields (3 layers)

Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).

good vacuum = 3.00 e-05 Torr

bad vacuum = 5.00 e-05 Torr

Evap 2 was left to pump down over night.


Saturday, July 25, 2020, 08:57

IGP1= 8.7 e-07 Torr

Start ramp at 0.25 A/min to 20 A on TGHT 


Saturday, July 25, 2020, 10:07

IGP1= 2.7e -06 Torr

Set ramp target to 30 A 


Wednesday, July 29, 2020, 13:11 

OMEGA reading 1700 C at 430 A during the night.  It was kept at this temperature for 3.5 hours.  The OMEGA slope was not changed from 0.990

when IGP1 = 1.2 e-06 Torr and stable, cooling was started at -3A/min at 9 am on this day.

IGP1= 2.2 e-07 Torr now at time of dismounting

 

Entry  Monday, July 20, 2020, 19:25, Darwin Ortiz Rosales, SiC, 44139-11, LP-SIS, Done, SiC sintering for Luca 2 of 2 

Monday, July 20, 2020, 19:27 

Coated Ta tube cotaining 355 SiC disks wrapped with Ta heat-shields (3 layers)

Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).

good vacuum = 3.00 e-05 Torr

bad vacuum = 5.00 e-05 Torr

Evap 2 was left to pump down over night.


 Monday, July 20, 2020, 23:06

IPG1 = 3.1e-06 Torr

Start autoramp at .25A/min to 40A for both TGHT and TBHT


Tuesday, July 21, 2020, 08:06

TGHT = 40.3 A, 0.51 V

TBHT = 39.0 A, 0.46 V

increase auto ramp limit to 50 A for both TGHT and TBHT 

IGP1=1.8e-05 Torr

 


Tuesday, July 21, 2020, 16:22

IGP1= 1.5 e-05 Torr 

TGHT = 50.1 A, 0.65 V

TBHT = 50.0 A, 0.60 V

 Change ramp target to 350 A for TGHT and 230A for TBHT


Wednesday, July 22, 2020, 13:24

Stopped autoramp.  Will allow pressure to drop. 

TGHT = 64.0 A, 0.86 V

TBHT = 64.5 A, 0.82 V 

 

Thursday, July 23, 2020, 23:55

TGHT Reached 430 A,  7.7 V

OMEGA reads 1310 C but reading is not considered accurate so will leave at this current for 4 hours.


Friday, July 24, 2020, 11:31

IGP1 = 1.98e-07 Torr

Window for pyrometer was coated with condensate.  

Dismounted target and cleaned two windows in line with the pyrometer.

 

 

 

Entry  Thursday, July 16, 2020, 11:15, Darwin Ortiz Rosales, SiC, 44139-11, LP-SIS, Done, SiC sintering for Luca 1 of 2 

 Thursday, July 16, 2020, 11:15

Coated Ta tube cotaining 233 SiC disks wrapped with Ta heat-shields (3 layers)

Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down


 Friday, July 17, 2020, 08:49

Total length packed approximately 10 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Two TaC coated Ta wire springs inserted at both ends.

Initially to ramp TGHT and TBHT to 40 A at 0.5 A/min

Then heat ramping TGHT manually and automatically  to reach 400 A  (Omega slope set = 0.990)

Then ramp to temperature = 1800 C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

Initial IGP1 = 6.45e-07 Torr

 


 

Friday, July 17, 2020, 20:49

TBHT = 38.9 A, 0.47 V

TGHT = 39.7 A, 0.59 V

IGP1 = 9.1e-06 Torr

Autoramp to 50 A at 0.5 A/min for both TGHT and TBHT


 Saturday, July 18, 2020, 09:04

IGP1 = 1.6e-06 Torr

TGHT = 50.5 A, 0.76V

TBHT = 49.7 A, 0.62 V

Starting autoramp at 0.5 A/ min to 400 A TGHT and 230 A TBHT


Saturday, July 18, 2020, 10:17

IGP1 = 5.06e-05 torr

stopped autoramp and allow pressure to decrease and stabilize


Saturday, July 18, 2020, 10:47 

IGP1 = 6.65 e-06 Torr and trending down

TGHT = 55.4 A, 0.83 V

TBHT= 54.6 A, 0.68 V

Change autoramp to 0.25 A/min for both heaters (.05 increments and 120s wait) 


Sunday, July 19, 2020, 08:46 

 IGP1= 2.2 e-05 Torr

TBHT = 109.5 A, 1.6 V

TGHT = 106.6 A, 1.7 V

increased ramping rate to .5A/min by decreasing wait intervals to 60 s


Sunday, July 19, 2020, 14:55 

IGP1 = 7.1 e -06 Torr

TGHT = 271.8 A, 4.7 V

TBHT = 233.1 A, 4.1 V

Increasing ramping rate to 1 A/min 


 Sunday, July 19, 2020, 17:35

IGP1 = 2.6e-06 Torr

TGHT = 400 A, 7.2 V

TBHT = 233 A, 4.1 V

Tap manually  to 410 (expected 1800 C )

Note*  OMEGA reading cannot be obtained.  

Leave at 410 A on TGHT for 4 hours.


Sunday, July 19, 2020, 22:57

IGP1 = 7.0 e-07 Torr

TGHT= 410 A , 7.2 V

TBHT = 233 A, 4.2 V

Start cool down at -2A/min for TGHT and -1A/min for TBHT

 


 Monday, July 20, 2020, 12:20

IGP1 = 2.2e-07 Torr

Unloading target

Entry  Monday, July 13, 2020, 11:03, Aaron Schmidt, , , , , Pump down / leak / vacuum check. 

 Darwin reported that he was unable to achieve vacuum of 150mTorr. The flex-line HS had been removed last week for modifications. SS gaskets received today. Replaced HS gaskets (Cu). 

Monday, July 13, 2020, 11:00: Roughing. 

Monday, July 13, 2020, 11:44: Vacuum to 200mTorr. Venting.

Monday, July 13, 2020, 11:55: Roughing. HS waterlines were opened. No visible leak detected.

Monday, July 13, 2020, 12:32: Venting. Vacuum to 175mTorr.

Monday, July 13, 2020, 12:34: Roughing.  

Monday, July 13, 2020, 15:21: Turn off the roughing pump. Vent in the am & plan to remove the HS to leak check the HS & EVAP 2. 


Tuesday, July 14, 2020, 07:42: Venting. 

Tuesday, July 14, 2020, 08:23: Flexible line HS removed. U-Line installed. Roughing. 

Tuesday, July 14, 2020, 08:54: Turbo pump on. 

Tuesday, July 14, 2020, 11:15: Vacuum @ 3.14e-06T. Turbo & Roughing pump off. 

Tuesday, July 14, 2020, 11:25:

HS leak checks:

0.0e-08 atm-cc/sec 

0.0e-07 atm-cc/sec @ 75 PSI He w/ sniffer.

0.0e-07 atm-cc/sec @ 120 PSI He w/ sniffer. (Note HS is very dirty inside)

Tuesday, July 14, 2020, 11:35: Venting EVAP 2. He bottle connected on "Air-In" on the HS water supply line. 

Tuesday, July 14, 2020, 13:50:

Pressurized the HS lines on EVAP 2 w/ 30 PSI He for 10 minutes. Remained @ 0.0e-07 atm-cc/sec.

Tuesday, July 14, 2020, 13:53: Roughing.

Tuesday, July 14, 2020, 17:33: Turbo pump on. 


Wednesday, July 15, 2020, 10:31: Turbo pump off. 

Wednesday, July 15, 2020, 12:02: HS Leak checked in the cold lab: 0.0e-07 atm-cc/sec @ 120 PSI He w/ sniffer.

Wednesday, July 15, 2020, 12:34: Venting. 

Wednesday, July 15, 2020, 13:37: Installed flex-line HS. Pressurized the HS lines on EVAP 2 w/ 30 PSI He for 10 minutes. Remained @ 0.0e-07 atm-cc/sec.

Wednesday, July 15, 2020, 13:42: Roughing. 

Wednesday, July 15, 2020, 14:16: Turbo pump on. 

Wednesday, July 15, 2020, 15:59: Vacuum @ 3.85e-06T 

Wednesday, July 15, 2020, 16:00: Waterline opened. No immediate response on Vacuum. 

Wednesday, July 15, 2020, 16:03: Vacuum @ 3.69e-06T and continuing to drop. 

Entry  Monday, June 15, 2020, 14:28, Darwin Ortiz Rosales, Empty, 42218-7, HP-SIS, Done, TaC coating/sintering 

 Monday, June 15, 2020, 13:30

Container coated with TaC and wrapped with 3 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A max).

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down


 Tuesday, June 16, 2020, 08:55
IGP1= 4.2e-7 Torr
Starting ramp to 50A at 0.2A/min  for both TGHT and TBHT.  Observing pressure behaviour.

Tuesday, June 16, 2020, 14:14
IGP1 = 9.0e-7 Torr
TGHT = 50.3 A, 0.6 V
TBHT = 49.4 A, 0.54 V
Set TGHT to 400A and TBHT to 230A

Tuesday, June 16, 2020, 16:58
IGP1 = 7.32e-7 Torr
TGHT = 82.3A, 1.0 V
TBHT = 81.8 A, 0.96V
Will try to increase ramp rate to 2 A/min for both TGHT and TBHT

Tuesday, June 16, 2020, 17:30
Pressure spike.  
IGP1 = 2.5e-5Torr
TGHT = 44.1 A, 0.57 V
TBHT = 43.0 A, 0.49 V
Will return to 0.2A/ min ramp rate for both heaters

 Thursday, June 18, 2020, 20:26
Autoramped to 720A , 11.6V on TGHT at 0.2A/min
OMEGA = 1850C
Manually ramped to 740 A , on TGHT while TBHT remains at 230A 
OMEGA= 1885 C
IGP1=4.6e-06 Torr trending down
Will remain at this temperature for next 4 hours
NOTE* Current on TGHT very unstable (oscillates) 

Friday, June 19, 2020, 11:31 
Last night at 00:15 am started cooling TGHT at -2A/min and TBHT at -0.2 A/min
(The elog entry was not submitted and computer restarted overnight so notes were lost).
at 6:30 am Friday June 19, 2020
Increased TBHT cooling to -2A/min  and decreased THGT cooling to -1A/min

Monday, June 22, 2020, 13:54
IGP1= 8.1e-8 Torr
Evaporator vented and container pulled out.  There is slight peeling near one end of the container.  This area should be on the outside of the end-caps so the container should be usable. 
Files to be uploaded later.
 
 
 
Entry  Thursday, June 11, 2020, 13:01, Darwin Ortiz Rosales, Empty, 44139-12, LP-SIS, Done,  WO#_44139-12_TaC_sintering.PNG

 Thursday, June 11, 2020, 09:56

Previous day (Wednesday June 10, 2020) 

Container coated with TaC and wrapped with 3 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max).

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down


Thursday, June 11, 2020, 10:19

IEVAP2:IGP1=1.06e-6 Torr

ramping to 40A (TGHT and TBHT) at 1A/min


Thursday, June 11, 2020, 12:35

IEVAP2:IGP1=1.8e-6 Torr

TGHT = 39.8 A, 0.45V

TBHT=38.5 A, 0.48V

Manually rampted to 45A on both TGHT and TBHT 


Thursday, June 11, 2020, 12:58

IEVAP2:IGP1=1.6e-6 Torr

TGHT = 34.8 A, 0.52V

TBHT=44.2A, 0.55V 

Start Autoramp at .5A/min to 400A on TGHT and 230A on TBHT


Thursday, June 11, 2020, 17:14

Irregular pressure profile.  Cooling .  Need to check for leak.

TGHT = 99 A 1.3 V

TBHT = 99 A 1.4 V


Friday, June 12, 2020, 12:59

Restarting ramping

IGP1= 4.98e7 Torr

Autoramp at 1A/min to 400A on TGHT and 230A on TBHT

(pressure and TGHT current and voltage profile seem normal compared to previous coating sintering with the same power supply)


Friday, June 12, 2020, 14:40

Paused ramping

TGHT = 90A

After a few minutes the profile (noise) was still there.  Continue autoramp at 0.5A/min to 400 A on TGHT and 230A on TBHT


Friday, June 12, 2020, 15:21

IGP1= 1.97e-06 Torr trending down

TGHT = 111.5 A , 1.5 V

TBHT = 112.9 A, 1.9 V

Increase ramping speed to 1A/min to 400A on TGHT and 230A on TBHT


Friday, June 12, 2020, 20:50

OMEGA = 1754 C

IGP1= 2.5e-6 Torr

TGHT = 394.1 A, 6.6 V

TBHT = 232.8 A, 4.0 V 

Tapping to 1900 C


Friday, June 12, 2020, 21:00

OMEGA =1901 C

IGP1= 5.6e-6 Torr

TGHT = 448.3 A, 7.5 V

TBHT = 232.8 A, 4.1 V


Saturday, June 13, 2020, 00:51 

 OMEGA = 1898 C

IGP1 = 2.0e-6 Torr

TGHT = 447.2 A, 7.5 V

TBHT = 232.9 A, 4.1 V

Start cooling at -2A/ min for TGHT and -1A/min for TBHT

 

 

 

 