Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 8 of 34  Not logged in ELOG logo
  ID Date Author Target Material Target Oven W.O# Sourcedown Status Subject Text Attachments
  563   Monday, November 08, 2021, 09:36 Darwin Ortiz RosalesEndcaps TARGET BOATDoneCoating of Ta caps and Ta springs (8 caps and 2 springs)Monday, November 08, 2021, 09:35
Two groups of 4 caps wrapped in graphite
with graphite discs in between. 
  
  566   Wednesday, February 09, 2022, 08:08 Darwin Ortiz RosalesNb TARGET BOATDoneNb annealing for PhillipWednesday, February 09, 2022, 06:55 
Target boat with a layer of
  
  568   Tuesday, February 15, 2022, 12:37 Darwin Ortiz RosalesNb TARGET BOATDoneNb annealing for PhillipWednesday, February 09, 2022, 06:55 
Target boat with a layer of
  
  572   Sunday, April 17, 2022, 10:37 Ferran Boix PamiesEmptyTa boat used for annealingTARGET BOATDonePEEK samples heat test Thursday, April 14, 2022, 10:36 Setup,
PEEK samples installed on heatshield with
TC. Pump down over the weekend.
  
  574   Monday, April 25, 2022, 08:31 Ferran Boix PamiesEmptyTa boat used for annealingTARGET BOATDonePEEK sample test 2Setup in vacuum over the weekend.
Monday, April 25, 2022, 08:31 IGP1:6.7e-7T
. Ramping up 1A/10s to 500A. 
  
  585   Tuesday, June 28, 2022, 09:31 Ferran Boix PamiesEmpty41882-2TARGET BOATIn progressTC test on Ta tubeTuesday, June 27, 2022, early afternoon:
We assembled the setup in evap2 and started
the pumps leaving it running over night.
  
  587   Thursday, August 04, 2022, 09:31 Ferran Boix PamiesEmpty TARGET BOATIn progressTC on Ta boat test. 11am: Setting up new target tube
thermocouple test
Thursday, August 04, 2022, 09:31
  
  588   Wednesday, August 10, 2022, 09:31 Ivan BaoEmpty TARGET BOATIn progressTC tests1st test polarity 1
10:12 am Begin pumping down to rough
vacuum
  
  591   Wednesday, September 14, 2022, 11:48 Darwin Ortiz Rosales  TARGET BOATDoneGrahite disc conditioning 220907GWednesday, September 14, 2022, 9:30
A Ta container tube was wrapped with
3 Ta heatshields.
  
  592   Thursday, September 22, 2022, 07:15 Darwin Ortiz RosalesTaC TARGET BOATDoneTaC coated endcaps and spring sinteringThursday, September 22, 2022, 07:13
Each endcap is separated with
  
  593   Thursday, September 29, 2022, 10:02 Darwin Ortiz Rosales 44139-3TARGET BOATDone220926-Graphite conditioning in target tubeThursday, September 29, 2022, 09:57
A Ta container tube was wrapped with
3 Ta heatshields.
  
  595   Tuesday, October 18, 2022, 13:59 Hannah ToyTiCTarget boat (tube)TARGET BOATDoneSynthesis of TiC Tuesday, October 18, 2022, 13:52
38 pieces of samples made of TiO2/C/PVP
loaded into a target boat wrapped with 2
  
  596   Wednesday, October 19, 2022, 09:50 John WongTiCTarget boat (tube)TARGET BOATDoneSynthesis of TiC


   
        
            
 Screenshot_2022-10-19_102257.pngScreenshot_2022-10-19_120146.pngScreenshot_2022-10-19_195305.pngScreenshot_2022-10-21_085223.png 
  599   Tuesday, November 01, 2022, 17:35 John WongTiC TARGET BOATDoneNp-TiC fibres systhesisTuesday, November 01, 2022, 17:24
2 samples of np-TiO2/C fibres were
produced using the e-spinner.  Each
 TiO2_C_fibres_carbonization_elog599.png 
  600   Monday, November 07, 2022, 14:26 Darwin Ortiz RosalesTaC44139-4TARGET BOATDoneTaC coating sinteringMonday, November 07, 2022, 14:24
The coated container tube was wrapped
in four Ta foil heatshields.
  
  602   Thursday, November 17, 2022, 08:14 Darwin Ortiz RosalesTaC44692-12TARGET BOATDoneTaC coating sinteringThursday, November 17, 2022, 08:11
The coated container was wrapped
in four Ta foil heatshields.
  
  605   Thursday, November 24, 2022, 11:08 John WongTiC TARGET BOATDoneSynthesis of TiC fibrous disc (TiO2/PAN only)Thursday, November 24, 2022, 11:01
Target container contains one disc
of e-spun TiO2/PAN fibrous disc, (Ref sample
 striptool_1600C.jpgstriptool_1887C.jpg 
  606   Friday, December 02, 2022, 09:50 Darwin Ortiz Rosales 45220-12TARGET BOATDoneGrahite disc conditioning 221130-GraphiteFriday, December 02, 2022, 09:46
297 graphite discs packed into a
Ta tube wrapped in four heatshields.
  
  607   Friday, December 16, 2022, 10:03 Darwin Ortiz RosalesTaC TARGET BOATDoneTaC coated endcaps and spring sintering4 TaC coated springs and 4 Tac coated caps
loaded into a target boat.
Target boat wrapped in 4 Ta heatshields
  
  608   Thursday, February 09, 2023, 09:49 Darwin Ortiz RosalesNb TARGET BOATDonecondition Nb samples (Phillip)Thursday, February 09, 2023, 09:47
Target boat with a layer of niobium
foil on the bottom is used to heat up Nb
  
ELOG V2.9.2-2455