  550   Friday, June 11, 2021, 08:41 Darwin Ortiz RosalesNb TARGET BOATDoneNb treatment for Norman

 Friday, June 11, 2021, 08:05

Target boat with a layer of niobium foil on the bottom is used to heat up Nb samples to 1100 C for 4 hrs.

OMEGA slope = 0.99

The niobium samples are wrapped in a layer of  Nb foil.

Boat is wrapped with 2 layers of Nb foil.

Good vacuum 3.00e-02 Torr

Bad vacuum 5.00e-02 Torr

Autoramping TGHT at 2A/min to 50A then to 100A, then monitor until desired temperature

Initial IGP1= 9.4e-07 Torr


Friday, June 11, 2021, 09:59

TGHT = 200 A, 2.7V

IGP1=  9.8e-07 Torr

Tap to 1100C


Friday, June 11, 2021, 10:09 

Temperature reached at 10:05 am.

TGHT = 224A, 3.1V

IGP1= 1.0e-06 Torr

OMEGA= 1100C +/- 10C fluctuations


Friday, June 11, 2021, 14:10

TGHT = 224A, 3.1V

IGP1= 9.2e-.07 Torr

OMEGA = 1100C +/-  10C fluctuations

Started rampdown at -3A/min

 

  549   Wednesday, April 28, 2021, 11:57 Darwin Ortiz RosalesSiC42218-7HP-SISDonesintering discs for SiC#41 (or back-up for #40)

Wednesday, April 28, 2021, 11:54

Total number of foils: 449 (not including analysis discs)

Total length packed 16.7 cm

5 extra analysis discs and 2 dr. Blade discs

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

One Ta disc inserted at front end

Initially to ramp TGHT and TBHT to 50A at0.5 A/min

Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically  to reach 530A A (Omega slope set = 0.990)

Then temperature = 1800C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

 


Thursday, April 29, 2021, 10:09

IGP1 = 6.5 e-07 Torr

Start heating at 0.5 A/min to 50 A on both TGHT and TBHT 


Thursday, April 29, 2021, 21:45

 IGP1= 7.7 e-06 

TGHT = 50.3A , 0.59 V

TBHT = 49.4 A, 0.56 V

Pressure is taking a while to equilibrate.  Will wait a bit more to continue heating

 


Thursday, April 29, 2021, 23:49

IGP1 = 7.2 e-06 Torr

will start ramping at 0.5 A/min to 100 A 


Saturday, May 01, 2021, 20:09 


Friday, April 30, 2021, 08:19

IGP1 pressure higher than bad vacuum.  Stopped autoramp.  Will allow vacuum to come back down and restart ramp. 


Saturday, May 01, 2021, 09:04

Yesterday the system had tripped.  All pumps had turned off and the pressure was found at 0.005 torr

vacuum was restarted.

 Current IGP1= 6.5e-07 Torr

Restarting heaters.  

Autoramp at 0.5A/min to 20A on both TGHT and TBHT


Saturday, May 01, 2021, 10:48

IGP1=5.9e-7 Torr

TGHT = 20.0 A, 0.24V

TBHT = 20A, 0.20V 

 Autoramp at 0.5A/min to 40A both TGHT and TBHT


Saturday, May 01, 2021, 13:26 

TGHT = 40.0 A, 0.47 V

TBHT= 39A, 0.44V

IGP1= 5.5 e-07 Torr

Autoramp at 0.5A/min to 60 A on both TGHT and TBHT


Saturday, May 01, 2021, 20:09

TGHT = 60.0 A, 0.72V

TBHT = 59.4 A, 0.69V

IGP1= 4.4e-07 Torr

Autoramp at 0.5A/min to 100 A on both TGHT and TBHT

 


Sunday, May 02, 2021, 18:30 

IGP1= 1.7 e-06 Torr

TGHT =100A, 1.3V

TBHT = 99.9A, 1.3V

Autoramp both heaters at 0.25A/min to 120A and monitor 


Sunday, May 02, 2021, 18:45

pressure increase to 4.1e-06 Torr.  TBHT unexpectedly rose to 120A and was manually tapped back down to 104 A.  Will keep both , TGHT and TBHT, at 104 A  for a while. 


Sunday, May 02, 2021, 19:50

Stepping at 0.5A/min to 105A then to 110 A on both TGHT and TBHT


Sunday, May 02, 2021, 22:10 

Will leave both TGHT and TBHT at 110 A until pressure comes back down

currently IGP1= 1.3e-05 Torr


Monday, May 03, 2021, 09:35 

IGP1= 2.2 e-06 Torr

Tapping TGHT and TBHT to 115A 


Monday, May 03, 2021, 11:30

 Tapping TGHT and TBHT to 120A @ 1A/min


Monday, May 03, 2021, 18:38

IGP1= 5.4e-06 Torr

TGHT = 130.3 A, 1.8 V

TBHT = 129.1 A, 1.8 V

Continue gradual ramping at 1A/min in increments of 5 A 


Tuesday, May 04, 2021, 09:27

IGP1= 3.2e-5 Torr

TGHT = 400 A, 6.0V

TBHT = 232 A, 3.6V

OMEGA = 1104 C

waiting for pressure to drop then will continue heating 


Tuesday, May 04, 2021, 17:27

TGHT = 420.1 A, 6.5V

TBHT= 232A, 3.6V

OMEGA = 1139 C

IGP1= 1.15e-5 Torr 

will increase ramp up at 0.5A/min to 430A and hold (TGHT)


Tuesday, May 04, 2021, 22:43

TGHT= 430A, 6.6V

TBHT = 232.8A, 3.6V

OMEGA= 1157 C

IGP1=6.6e-6 Torr

 Set Autoramp at 0.5A/min to 540 A (TGHT)


Wednesday, May 05, 2021, 08:09

IGP1= 7.5e-06 Torr

TGHT = 534 A, 8.5V

TBHT=232 A, 3.7 V 

OMEGA = 1485

Continue ramp at 0.5A/min to to 600 A on TGHT

 


Wednesday, May 05, 2021, 15:07

IGP1=1.2e-5 Torr

TGHT=601A, 9.6V

TBHT= 232A, 3.7V

OMEGA =1600 C

ramp to 650A on TGHT at 0.5A/min 


Wednesday, May 05, 2021, 20:05

Tapped TGHT to 694A, 11.4 V (manually)

TBHT= 232A, 3.7V

OMEGA =  1790 C

IGP1= 2.5e-05 Torr

Will monitor Pressure and temperature .  Will start 4 hour count.


Wednesday, May 05, 2021, 22:03

OMEGA = 1765 C 

TGHT = 694A, 11.5V

TBHT = 232A, 3.8 V

IPG1= 1.6e-05 Torr

Manually bumping TGHT to 700 A

 

  548   Thursday, April 15, 2021, 18:33 Marla CervantesTa44139-6-SKTARGET BOATDoneCarbon penetration on Ta

Thursday, April 15, 2021, 18:24

Tantalum samples were loaded in a tantalum testing tube and installed in the EVAP2 to heat under vacuum for 3 days at 2000 degC (~500A, 4kW).

The temperature is measured with the Omega pyrometer (slope 0.98)

Some of the samples are in contact with graphite and enclosed with Ta caps, the other samples are not in contact with carbon.

The testing tube is wrapped with 3 Ta heat shields and is not TaC coated.


Thursday, April 15, 2021, 18:31

IGP1 = 4.5e-7 Torr

Good vacuum = 3e-2 Torr

Bad vacuum = 5e-2Torr

The TGHT will be ramped to 500A at 5A/min


Thursday, April 15, 2021, 20:00

Finished ramping

TGHT = 502 A, 8.22 V, Omega 2012 degC


Sunday, April 18, 2021, 20:38

After 3 days at ~2000 degC, TGHT was ramped at -2A/min to 0A

  547   Tuesday, April 13, 2021, 10:44 Marla CervantesEmptyNA (Ta- tube Eagle Alloys) DoneRe-coat 4

 Tuesday, April 13, 2021, 09:51

IGP1 = 2.5e-7 Torr


Tuesday, April 13, 2021, 10:17 

The wire was heated in the same manner as the last three runs

From 0A to 7A the autoramp was set to 0.5A/min

At 8A the wire started the glow dimmly 

Above 8A, the wire was heated manually at 0.5A until 15A where the step was changed to 1A, 

the temperature was measured with the filament pyrometer every 2 A starting at 10A

At 42 A the step was changed to 0.5A until 44.5A, 4.61V (2120 °C), the wire was kept at that temperature for 6 hours.

After that time, the current was ramped to 0A at 0.5A/min.

  546   Thursday, April 08, 2021, 08:25 Aaron SchmidtTa44139-10LP-SISIn progressConditioning Ta#62 & Flex - line HS installed

 Ta#62 LP-SIS target description:

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.025mm

Target density = 13.96 g/cm3

Target length = 3.4 cm

Total Mass = 47.461 g [Incl foils + Ta wire on 6 packs]

Total mass w/ Target oven= 445 g (w/ end caps)

Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack

End caps installed (expanded). No Ta foil heat shield added


TBHT will be ramped up to 230A 

TGHT will be ramped up to 600A +

Final desired temperature = 1900C.

OMEGA slope = 0.98.

Thursday, April 08, 2021, 08:24: Roughing.

Thursday, April 08, 2021, 09:06: Vent & check. Roughed to only 20 T. 

Thursday, April 08, 2021, 09:18: Roughing. Loose flange found. Left side wall / upper right. 

Thursday, April 08, 2021, 09:34: TP1 on. 

Thursday, April 08, 2021, 14:41: Vacuum @ 1.65e-06T. Waterline opened.

Thursday, April 08, 2021, 14:46: Vacuum ok. Power on. TGHT / TBHT to 20 / 15 A. Ok.

Thursday, April 08, 2021, 14:50: Auto-ramping TGHT / TBHT to 300 / 100 A @ 2 A per min.


Friday, April 09, 2021, 05:08: Vacuum @ 6.23e-07T. Temp @ 1195 C. Auto-ramping TGHT / TBHT to 400 / 150 A @ 2 A per min.

Friday, April 09, 2021, 06:01: Vacuum @ 9.64e-07T. Temp @ 1447 C. Auto-ramping TGHT / TBHT to 500 / 200 A @ 2 A per min.

Friday, April 09, 2021, 07:23: Vacuum @ 1.92e-06T. Temp @ 1671 C. Auto-ramping TGHT / TBHT to 600 / 230 A @ 2 / 1 A per min.  

Friday, April 09, 2021, 08:40: Vacuum @ 3.96e-06T. Temp @ 1877 C. Auto-ramping TGHT / TBHT to 620 A @ 1 A per min.   

Friday, April 09, 2021, 09:10: Vacuum @ 3.60e-06T. Temp @ 1915 C. Drop TGHT from 620 A to 610 A manually.

TGHT to 613 A manually.

Friday, April 09, 2021, 09:15: Vacuum @ 3.60e-06T. Temp @ 1902 C. TGHT / TBHT @ 613 A / 230 A. Desired temperature reached.

Friday, April 09, 2021, 12:08: Auto-cooling @ 1 A per min initiated. 


Monday, April 12, 2021, 07:23: PS / Turbo pump / roughing pump off. 

Monday, April 12, 2021, 08:03: Vented. 

  545   Sunday, April 04, 2021, 16:09 Ferran Boix PamiesEmpty41882-2TARGET BOATDoneparasitic target commissioning

 2021-04-04 16:07 New container is in with heatshields, vacuum 8.6E-6 torr. leak check done. ramping up current, checking both pyrometer and TC, 1A/10s.

 2021-04-04 16:49 200A TGHT 250degC on TC 1130degC on pyrometer. Too low on TC, ramping down and venting to reposition TC in the foil. 

 2021-04-04 18:00 TC was slightly broken, repaired now. Pumping chamber.

 2021-04-04 18:41 ramping up to 200A 1A/10s.

2021-04-04 18:41 200A TGHT, TC 389degC pyro 1130degC. ramping to 400A 1A/10s.

2021-04-04 18:41 300A TGHT, TC 554degC pyro 1440degC. 

2021-04-04 18:41 400A TGHT, TC 735degC pyro 1720degC. ramping to 600A 1A/10s. 

2021-04-04 20:15 500A TGHT, TC 891degC pyro 1990degC

2021-04-04 20:15 553A TGHT, TC 975degC pyro 2129degC, ramping down.

2021-04-06 13:44 Parasitic target plus thermocouples were introduced in evap2 the day before and put under vacuum. IG1 3E-7 torr, leak check done. Putting some power into HE while ramping up container to 100A 1a/10s.

2021-04-06 14:06 20W on HE 100A on target container. Everything stable. Ramping up to 200A 1A/10s 

2021-04-06 14:06 20W on HE 200A on target container. Everything stable. Ramping up to 300A 1A/10s 

2021-04-06 14:06 20W on HE 300A on target container. Everything stable 4.6E-7 torr. Ramping up HE to 40W.

2021-04-06 14:06 40W on HE 300A on target container. Everything stable 4.6E-7 torr. Ramping up container to 400A 1A/10s.

2021-04-06 14:06 40W on HE 400A on target container. Everything stable 1E-6 torr. Ramping up container to 500A 1A/10s.

2021-04-06 15:52 35W on HE 500A on target container. Everything stable 1.6E-6 torr. Ramping up He to 65W.

2021-04-06 18:40 at 50W on HE one of them broke, system ramped down, vented, HE replaced, pumping down system again.

2021-04-07 10:38 HE at 70W, ramping up container to 200A 1A/10s. Vacuum 3.3E-7 torr.

2021-04-07 10:59 HE at 70W, 200A on container, ramping up container to 300A 1A/10s. Vacuum 3.9E-7 torr.

2021-04-07 10:59 HE at 65W, 300A on container, ramping up container to 400A 1A/10s. Vacuum 4.5E-7 torr.

2021-04-07 11:50 HE at 70W, 400A on container, ramping up container to 500A 1A/10s. Vacuum 7.8E-7 torr.

2021-04-07 11:50 HE at 65W, 500A on container, ramping up container to 553A 1A/10s. Vacuum 1.4E-6 torr.

2021-04-07 11:50 HE at 65W, 553A on container. All good, ramping down. 1A,10s.

  544   Tuesday, March 30, 2021, 19:49 Ferran Boix PamiesEmpty44139-7-SK  DoneParasitic target thermal tests

 2021-03-30 7:48 Target loaded with parasitic target only. No container. Leaving under vacuum over night.

 2021-03-31 13:43 Leak check performed. Water on. Need to vent system, electric connection disconnected.

 2021-03-31 15:02 First test successfully finished. Venting to introduce container with radiating heating gun.

 2021-04-01 14:58 Vacuum 3.5E-7 torr. Leak check done. Ramping up target heater to 100A at 1A/10s20210403_174815.jpg

 2021-04-01 14:58 Vacuum 5E-7, 100A all ok. Temp foil 24.3DegC. ramping to 500A at 1A/10s.

 2021-04-01 14:58 Temp of foil not increasing much. Probably issue with TC. ramping down at 1A/10s to vent and inspect.

 2021-04-02 11:03 Target reinstalled, foil TC reinstalled. Vacuum 3E-7 torr. Leak check done. Ramping up container to 500A 1A/10s. 

 2021-04-02 13:07 Still isues with TC. Container ramped down at 1A/10s. Venting, brought heat gun to check TC.

 2021-04-02 15:10 TC connection fixed, origin of issues. Vacuum down to 3E-5 torr. Ramping up container to 200A 1A/10s.

 2021-04-02 18:32 TGTH 200A Tc temp 327.5degC. ramping up to 300A. 1A/10s.

 2021-04-02 18:32 TGTH 300A Tc temp 500degC. ramping up to 400A. 1A/10s.

 2021-04-02 19:17 TGTH 400A Tc temp 618degC. ramping down.

 2021-04-03 13:37 Foil was changed, ramped up to 200A at 1A/10s, Temp TC 360degC. Ramping to 300A. Vac 8.6E-6 torr.

 2021-04-03 13:59 300A Temp TC 580degC. Ramping to 500A, 1A/10s. Vac 7.6E-6 torr.

 2021-04-03 14:36 500A Temp TC 836degC. Ramping to 600A, 1A/10s. Vac 9E-6 torr.

 2021-04-03 14:36 600A Temp TC 960degC. Vac 1.1E-5 torr. Ramping down. 

2021-04-03 19:00 After venting an opening the evap2, it was found that remaining from a past heat treatment where on the Tantalum container. The sublimation of the material coated the inner walls of the evap.2. Now cleaned.

 

 

  543   Sunday, March 28, 2021, 11:24 Marla Cervantes NA (Ta-tube) DoneRe-coat 3

Objective: Coating the inner surface of a tantalum tube to make a destructive test and use a reference for the tantalum boats coatings

Results: The tube was coated


Sunday, March 28, 2021, 11:23

No water leak

IGP1 = 2.3e-7 torr


Sunday, March 28, 2021, 16:10

The wire was heated in the same manner as the last three runs

From 0A to 7A the autoramp was set to 0.5A/min

At 8A the wire started the glow dimmly 

Above 8A, the wire was heated manually at 0.5A until 16A where the step was changed to 1A, 

the temperature was measured with the filament pyrometer every 2 A starting at 10A

At 42 A the step was changed to 0.6A until 42.6A, 4.38V (2020 °C), the wire was kept at that temperature for 90 min

After that time, the current was ramped down at 0.5A/min until ~20A when the current rampping was changed too 1A/min


 

 

  542   Friday, March 26, 2021, 16:23 Marla CervantesEmpty44489-7 DoneRe-coat 2

Objective: Coating the inner surface of a tantalum tube to make a destructive test and use a reference for the tantalum boats coatings

Results: 


Sunday, March 27, 2021, 11:23

No water leak

IGP1 = 3.7e-7 torr


Sunday, March 27, 2021, 16:10

The wire was heated in the same manner as the last three runs

From 0A to 7A the autoramp was set to 0.5A/min

At 8A the wire started the glow dimmly 

Above 8A, the wire was heated manually at 0.5A until 16A where the step was changed to 1A, 

the temperature was measured with the filament pyrometer every 2 A starting at 10A

At 42 A the step was changed to 0.6A until 42.6A, 4.38V (2020 °C), the wire was kept at that temperature for 90 min

After that time, the current was ramped down at 0.5A/min until ~20A when the current rampping was changed too 1A/min

 

 

  541   Friday, March 26, 2021, 13:58 Marla CervantesEmpty44489-6 DoneRe-coat 1

Friday, March 26, 2021, 13:55

Yesterday a heat shield was installed in the EVAP2.

A 1mm thick rhenium wire was held within two copper brackets to pass through a Cu tube with the intention of coating its inside face.

The desired temperature of the Re wire is 2500 degC

A water leak was performed and no leak was detected

 

  540   Thursday, March 25, 2021, 11:24 Marla CervantesEmptyNA (Cu-Tube DoneRe-coat test 4

Objective: Coating the inner surface of a short tantalum tube with rhenium.

Result:

  • The wire snnaped around 376 W (53 A, and 7.09 V) and 2170 °C (measured with filament pyrometer)
  • The tube is coated

Thursday, March 25, 2021, 11:23

Yesterday a heat shield was installed in the EVAP2.

The desired temperature of the Re wire is 2500 degC

A water leak was performed (elog 539 describes it), no leak was detected.


Tuesday, March 23, 2021, 11:01

Pressure 3.8e-7 Torr, current rate set to 6 A @ 0.5 A/min

The wire started glowing at TGHT =  4W, 7A, 0.56V


When reaching 7A the current was increased 0.5 A manually 

When reaching 16 A,  the current was increased 1 A manually until reaching 54 A when the wire snapped

  539   Thursday, March 25, 2021, 07:57 Aaron Schmidt    Re - Ta test. Leak check.

Thursday, March 25, 2021, 07:55: Vacuum @ 5.12e-07T. Waterlines opened.

Thursday, March 25, 2021, 07:55: Vacuum @ 5.09e-07T. Stable.

  538   Tuesday, March 23, 2021, 11:28 Marla CervantesEmpty44489-6 DoneRe-coating test 3

Objective: Coating the inner surface of a short tantalum boat with rhenium.

Result:

  • The wire snnaped around 376 W (53 A, and 7.09 V) and 2170 °C (measured with filament pyrometer)
  • The tube does not have indications of coating

Thursday, March 25, 2021, 11:23

Yesterday a heat shield was installed in the EVAP2.

The desired temperature of the Re wire is 2500 degC

A water leak was performed (elog 539 describes it), no leak was detected.


Tuesday, March 23, 2021, 11:01

Pressure 3.8e-7 Torr, current rate set to 6 A @ 0.5 A/min

The wire started glowing at TGHT =  4W, 7A, 0.56V


When reaching 7A the current was increased 0.5 A manually 

When reaching 16 A,  the current was increased 1 A manually until reaching 54 A when the wire snapped

  537   Tuesday, March 23, 2021, 08:07 Aaron Schmidt    Re - Ta test. Leak check.

 Modified HS installed with new brackets as per Marla.

Tuesday, March 23, 2021, 08:02: Vacuum @ 3.64e-07T. Waterlines opened.

Tuesday, March 23, 2021, 08:06: Vacuum @ 3.60e-07T. Stable.

  536   Tuesday, March 16, 2021, 08:29 Darwin Ortiz RosalesTaC TARGET BOATDonesintering of TaC on Caps and springs

 Tuesday, March 16, 2021, 08:28 

Each endcap is separated with a disc of graphite foil and rolled into packs of 5 within a foil envelope in a target boat.

There are also 4 coated springs, one in between endcaps and three on the ends

The boat is wrapped with 3-layers of Ta heatshields.

Chamber pumping down

OMEGA slope = 0.99

Will ramp TGHT up to 40 A then autoramp to 400A at 1A/min.

Final desired temperature on OMEGA (tap)= 1800C


Tuesday, March 16, 2021, 11:22

 IGP1= 3.5e-06 Torr

TGHT = 40A, 0.4V

Will ramp up at 1A/min to 400 A


Wednesday, March 17, 2021, 08:06

IGP1=  2.98 e-07 Torr

TGHT = 400 A, 4.3V

OMEGA shows no temperature reading.  Will ramp up to 450A at 1A/min

 


Wednesday, March 17, 2021, 08:58

OMEGA still shows no reading

IGP1= 4.2e-07 Torr

ramping to 470A @ 1A/min 


Wednesday, March 17, 2021, 09:21

OMEGA no reading

IGP1 = 4.4 e-07 Torr

TGHT = 470 A, 5V

ramp up to 490 A at 1A/min


Wednesday, March 17, 2021, 11:05 

TGHT at 490 A, 5.2 V since 10 am.  Will start cooling at 2 pm.  


Wednesday, March 17, 2021, 13:47

TGHT = 493A, 5.3V

IGP1= 3.2e-07 Torr and stable

Start ramp down at -2A/min


Thursday, March 18, 2021, 11:20 

The boat was dismounted but the materials had not sintered properly.  The boat looked very twisted.  Everything was transferred to a new boat with uncoated Ta caps at either end.  

It was left overnight to establish vacuum.


Friday, March 19, 2021, 08:23

IGP1= 2.2 e-07 Torr

initiate heating at 1A/min on TGHT to 60 A


Friday, March 19, 2021, 10:04

IGP1= 3.6 e-07 Torr

TGHT = 60 A, .73 V

Ramp up to 450 A @ 2A/min

 


Friday, March 19, 2021, 14:26

OMEGA 1895 at 455A, 8.4 V

manually ramp down to 1800C

OMEGA 1800C at 416A, 7.6V

will leave like that for 3 hours more


Friday, March 19, 2021, 17:12

OMEGA 1795 C

 TGHT = 415A, 7.6V

IGP1= 6.8e-07 Torr

Start ramp down at -2A/min


Monday, March 22, 2021, 23:07 

Marla removed from Evap 2.  Sintering vwas very good.  The container with Ta caps is better for sintering these pieces.

 

  535   Tuesday, March 09, 2021, 11:54 Darwin Ortiz RosalesTaC42464-1HP-FEBIADDoneTaC coating/sintering

Tuesday, March 09, 2021, 11:54 

 Container coated with TaC and wrapped with 3 Ta heat shields.

Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be increased  accordingly to reach desired Temp.

TBHT will be set fixed at 230 A max).

Good vac at 3.00e -5 Torr

Bad vac at 5.00e-5 Torr

Chamber pump down


Wednesday, March 10, 2021, 08:32

IGP1 = 2.6 e -07 Torr

Start autoramp @ 1A/min to 40 A on both TGHT and TBHT

***Autoramp aborted due to work on EF12 affecting EVAP2***

Will have to resume Thursday or Friday

 


Saturday, March 13, 2021, 7:54

  IGP1= 3.8e-07 Torr

Initiate heating @ 0.5A/min TBHT and TGHT to 60 A


Saturday, March 13, 2021, 23:01

IGP1 = 2.7e-07Torr

TGHT = 60.5A, 0.7V

TBHT= 60.0A, 0.7V

Initiate ramp @ 1 a/min to 400 A on TGHT and 230A on TBHT


Sunday, March 14, 2021, 08:45

IGP1= 8.2e-07 Torr

TGHT = 400A, 5.6V

TBHT = 232.9A, 3.0V 

OMEGA = 1142 C

Continue ramping to 460 A on TGHT at 1a/min


 Sunday, March 14, 2021, 10:11

IGP1 = 1.0 e-06 Torr

TGHT= 460.4 A, 6.5 V

TBHT = 232.9 A, 3.0 V

OMEGA = 1239 C

Will ramp up to 500 A at 1a/min on TGHT


Sunday, March 14, 2021, 10:53

 IGP1 = 1.3 e-06 Torr

TGHT= 495 A, 7.2 V

TBHT = 232.9 A, 3.0 V

OMEGA = 1316 C

Will ramp up to 600 A at 1a/min on TGHT

 


Sunday, March 14, 2021, 12:45

IGP1 = 3.0 e-06 Torr

TGHT= 604 A, 9.1 V

TBHT = 232.9 A, 3.1 V

OMEGA = 1610 C

Will ramp up to 660 A at 1a/min on TGHT 

 


Sunday, March 14, 2021, 17:01

IGP1= 2.4e-06 Torr

TGHT =  664 A, 10V

TBHT = 232.9 A, 3.1V

OMEGA = 1733 C

tapping TGHT to 740 A

OMEGA = 1883 C


 Sunday, March 14, 2021, 21:45

IGP1= 3.1e-06 Torr

TGHT =  744A, 11.5V

TBHT = 232.9 A, 3.2V

OMEGA = 1875 C

Start cooling TGHT @-3A/min and TBHT @-1A/min

 

  534   Friday, March 05, 2021, 10:48 Darwin Ortiz RosalesTaC44691-1LP-SISDoneTaC coating/sintering

 Friday, March 05, 2021, 10:47

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Initial weight including heat-shields = 431.0 g

Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 will be pumped down over night.

Good vacuum = 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr


 Saturday, March 06, 2021, 10:29

IGP1= 2.7 e-07 Torr and stable

AutoRamp at 1A/min to 40 A on TGHT and TBHT

 


Saturday, March 06, 2021, 22:36

IGP1= 2.2e-07 Torr

TGHT = 40.3 A, .46V

TBHT = 38.48 A, .48 V  (set to 40 A)

Start Autoramp at 0.5A/min to 400 A on TGHT and 230A on TBHT


Sunday, March 07, 2021, 07:48

IGP1=8.5e-7 Torr

TGHT = 287 A, 4.6V

TBHT = 232 A, 4.0 V

OMEGA = 1493C

 Increase ramp speed on TGHT to 2A/min to 400A


Sunday, March 07, 2021, 08:36 

 IGP1=1.7 e-06 Torr

TGHT = 373.7 A, 6.3V

TBHT = 232.9 A, 4.1 V

OMEGA = 1752 C


Sunday, March 07, 2021, 08:53

 IGP1= 1.7e-06 Torr

TGHT = 400 A, 6.8 V

TBHT = 232.8 A, 4.1 V

OMEGA= 1842

Ramp TGHT @ 2A/min to 420 A as per attached current approximation


Sunday, March 07, 2021, 09:25

OMEGA=1915 C

TGHT = 420A, 7.2V

TBHT= 232.8 A, 4.1V

IGP1= 1.6 e-06 Torr

Tap down manually to approx 1900 C

TGHT = 412.9 A, 7.0 V and OMEGA=1900 C

Will leave for about 4 hours at this temperature

 


Sunday, March 07, 2021, 13:05

IGP1= 1.1 e-06 Torr

TGHT = 415 A, 7.2 V

TBHT = 232.8 A, 4.1 V

OMEGA = 1880C

Start cool down at -2A/min on TGHT and -1A/min TBHT

 

 

 

  533   Tuesday, March 02, 2021, 11:32 Darwin Ortiz RosalesTaC44691-5LP-SISDoneTaC coating/sintering

Tuesday, March 02, 2021, 11:26 

Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)

Initial weight including heat-shields = 433.8 g

Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).

Evap 2 will be pumped down over night.

Good vacuum = 3.00 e-5 Torr

Bad vacuum = 5.00 e-5 Torr


Wednesday, March 03, 2021, 13:28

IGP1 = 4.0 e-7 Torr

Start ramping @ 1A/min to 20A on both TGHT and TBHT


Wednesday, March 03, 2021, 15:03

Start ramping @1/min to 60A on Both TGHT and TBHT


Wednesday, March 03, 2021, 22:42

TGHT = 60A, TBHT = 60A

IGP1= 4.2 e-7 stable

Start ramping to 400A @ .5A/min for TGHT and @0.5A/min for TBHT to 230A


Thursday, March 04, 2021, 11:56

TGHT = 400 A, TBHT =230A

IGP1= 1.9e-6 Torr

OMEGA = 1695 C

Continue ramp up @0.5A/min to 430A on TGHT


Thursday, March 04, 2021, 14:02

IGP1 = 1.87e-6 Torr

TGHT = 434 A , 7.2 V

OMEGA = 1787 C

Will tap up manually 450A @ on TGHT and leave at that current for ~4 hours


Thursday, March 04, 2021, 19:35

After ~ 5 hours at 1829 C max OMEGA reading

OMEGA = 815 C 

Start ramp down at 1A/min on TGHT and 0.8A/min for TBHT

IGP1= 1.2e-6 Torr

 


 

 

  532   Monday, March 01, 2021, 13:58 Aaron Schmidt    Flex - line HS installed

Flex-Line HS had been fully scrubbed out earlier. All gaskets replaced.

Empty. Quick check for leaks.

Monday, March 01, 2021, 13:57: Roughing.

Monday, March 01, 2021, 14:13: TP1 on. 

Monday, March 01, 2021, 15:18: Vacuum @ 1.01e-05T. Open HS waterline. 

Monday, March 01, 2021, 15:24: Vacuum @ 9.30e-06T & dropping. Waterline ok. 

Monday, March 01, 2021, 15:25: Turbo pump off. Vent when ready. 

  531   Friday, February 26, 2021, 09:28 Ferran Boix PamiesEmptynone DoneParasitic target thermal tests

 Tests were performed with external power supply. No target boat or container.

Small power on heating small heating elements on parasitic target attached on isac heatshield with water cooling on. 

 

 