  33   Thursday, June 21, 2012, 18:13 John WongNiOTa target boat FailedNiO development - Container broke!

    

       
            
 NiO_targets_temp.pdfTGHT_0-580A.GIFTGHT_200-580A.GIFTGHT_vs_VOL.GIFNiO_container_broke.png 
  572   Sunday, April 17, 2022, 10:37 Ferran Boix PamiesEmptyTa boat used for annealingTARGET BOATDonePEEK samples heat test Thursday, April 14, 2022, 10:36 Setup,
PEEK samples installed on heatshield with
TC. Pump down over the weekend.
  
  574   Monday, April 25, 2022, 08:31 Ferran Boix PamiesEmptyTa boat used for annealingTARGET BOATDonePEEK sample test 2Setup in vacuum over the weekend.
Monday, April 25, 2022, 08:31 IGP1:6.7e-7T
. Ramping up 1A/10s to 500A. 
  
  543   Sunday, March 28, 2021, 11:24 Marla Cervantes NA (Ta-tube) DoneRe-coat 3Objective: Coating the inner surface of
a tantalum tube to make a destructive test
and use a reference for the tantalum boats
  
  547   Tuesday, April 13, 2021, 10:44 Marla CervantesEmptyNA (Ta- tube Eagle Alloys) DoneRe-coat 4 Tuesday, April 13, 2021, 09:51
IGP1 = 2.5e-7 Torr

 voltage-increment-Re-coating.JPG 
  530   Tuesday, February 23, 2021, 08:59 Marla Cervantes NA (Cu-tube) DoneRe coating Test 2 Tuesday, February 23, 2021, 08:49
Yesterday a heat shield was washed
and when dry it was installed in the EVAP2,
  
  540   Thursday, March 25, 2021, 11:24 Marla CervantesEmptyNA (Cu-Tube DoneRe-coat test 4Objective: Coating the inner surface of
a short tantalum tube with rhenium.
Result:
  
  527   Tuesday, February 09, 2021, 06:48 Aaron Schmidt NA DoneTa coating testMonday, February 08, 2021, 17:00: Installed
brackets w/ Ta wire and a small piece of
Re to test voltage drop.
  
  528   Thursday, February 11, 2021, 10:57 Marla Cervantes NA DoneRe coating Test 1Thursday, February 10, 2021, 12:00
Objective: Heat a Re wire to evaporate
it and deposit a layer of Re on the inner
  
  59   Monday, March 04, 2013, 17:41 John WongEmptyLP-SIS RFQ ver 2.0  Testing LPSIS RFQ ver 2.0 Monday, March 04, 2013, 17:39
This is the 2nd modified target container
for RFQ LPSIS.  The container will be
  
  632   Friday, April 28, 2023, 11:31 Darwin Ortiz RosalesTaCBoatTARGET BOATDoneTaC coated endcaps and spring sinteringFriday, April 28, 2023, 11:29
loaded 14 TaC coated end caps and
2 TaC coated springs.
  
  449   Monday, June 17, 2019, 17:09 Marla Cervantes 49044-9LP-SISDoneTarget container calibration/conditioning Monday, June 17, 2019, 17:04
A LP-SIS target container  was
wrapped with 3 heat shielding layers,
  
  641   Thursday, August 24, 2023, 14:18 Aaron SchmidtNb45447-9LP-IG-LISIn progressConditioning Nb#11 Nb#11 LP-IG-LIS target
description:
  
  674   Friday, August 30, 2024, 11:33 Darwin Ortiz RosalesTa45447-8LP-IG-LISDoneTaC coating sinteringFriday, August 30, 2024, 11:31
The coated container was wrapped
in 4 Ta foil heatshields.
  
  638   Wednesday, June 21, 2023, 10:37 Aaron SchmidtNb45447-7LP-IG-LISIn progressConditioning Nb#10Nb#10 LP-IG-LIS target description:
  
  644   Thursday, August 31, 2023, 07:09 Darwin Ortiz RosalesTaC45447-4HP-FEBIADDoneTaC coating sinteringThursday, August 31, 2023, 07:07
The coated container was wrapped
in 3 Ta foil heatshields.
  
  650   Wednesday, December 06, 2023, 09:57 Darwin Ortiz RosalesSiC45447-4HP-FEBIADDone231204SiC conditioningWednesday, December 06, 2023, 09:47
Target number of foils:370
  
  659   Friday, April 26, 2024, 06:19 Darwin Ortiz RosalesTaC45447-29HP-SISDoneTaC coating sintering


 Monday, April 29, 2024, 19:50
Started coating with coating stand.
  
  665   Monday, July 22, 2024, 14:59 Aaron SchmidtTa45447-14LP-SISIn progressConditioning Ta#67 Thin foil  Ta#67 Thin foil   
  675   Saturday, September 07, 2024, 09:55 Darwin Ortiz RosalesTaC45447-13LP-SISDoneTaC coating sinteringSaturday, September 07, 2024, 09:54
The coated container was wrapped
in 4 Ta foil heatshields.
  