18
|
Tuesday, May 15, 2012, 14:00 |
John Wong | | | | Maintenance | Installed a new stainless metal heat shield | Tuesday, May 15, 2012, 13:45
It was discovered that one of the
insulators that supported the target module |
|
34
|
Thursday, July 12, 2012, 17:55 |
John Wong | NiO | targetboat (TaC coated) | | Maintenance | NiO development- test#2 | Thursday, July 12, 2012, 17:29
NiO was sprayed on Ni foil.
Average/discs: mass= 0.075g, thickness=0.076mm, |
|
42
|
Tuesday, August 14, 2012, 15:11 |
John Wong | | | | Maintenance | Replacing Cu-heatshield insulators | Tuesday, August 14, 2012, 15:01
The Cu-heatshield insulators are
broken due to prolong heating time during |
|
53
|
Friday, January 11, 2013, 11:16 |
John Wong | | | | Maintenance | Replace terminal insulator | Friday, January 11, 2013, 10:59
The insulator that holds the terminals
was broken when a target container was installed. |
|
55
|
Friday, January 11, 2013, 15:16 |
Anders Mjos | | | | Maintenance | Replace terminal insulator |
|
|
94
|
Monday, November 04, 2013, 14:02 |
Anders Mjos | | | | Maintenance | Backing pump replaced |
|
|
123
|
Monday, March 10, 2014, 11:45 |
John Wong | | | | Maintenance | Replaced Backing Pump hose | Monday, March 10, 2014, 11:44
Rick replaced the backing pump hose
from 1.5" to 2.0" for better flow. |
|
159
|
Thursday, October 02, 2014, 11:26 |
John Wong | Empty | | | Maintenance | Broken insulators | Thursday, October 02, 2014, 11:22
It was found that after the last
process, Evap#2 has broken insulators - the |
|
161
|
Friday, October 03, 2014, 13:02 |
Anders Mjos | Empty | | | Maintenance | Broken insulators |
|
|
172
|
Wednesday, November 26, 2014, 14:09 |
Laura Lambert | | | | Maintenance | OMEGA-IR dark patch and backing pump trip | Wednesday, November
26, 2014, 13:47 |
|
173
|
Thursday, December 11, 2014, 10:20 |
Laura Lambert | | | | Maintenance | water supply shut off for lab closure over holidays | Thursday, December 11, 2014, 10:17
water supply and return valves closed
for lab closure over the holidays. |
|
174
|
Wednesday, January 14, 2015, 13:46 |
Anders Mjos | Empty | | | Maintenance | Pumping down for water leak test | Wednesday, January 14, 2015, 13:46:
Roughing
Wednesday, January 14, 2015, 14:57: |
|
231
|
Thursday, July 30, 2015, 17:07 |
John Wong | | | | Maintenance | Connect NALCW to EVAP1 | Thursday, July 30, 2015, 17:02
EVAP1 cooling system is now on the
NALCW. The city water has been removed |
|
232
|
Friday, July 31, 2015, 15:10 |
John Wong | | | | Maintenance | Installed leftside port | Friday, July 31, 2015, 15:09
The left side port was installed
on the evaporator #2. Leak check was |
|
240
|
Monday, August 24, 2015, 12:58 |
John Wong | | | | Maintenance | Replacing turbo pump, IEVAP2TP1 | Monday, August 24, 2015, 12:54
The turbo pump was found to be faulty.
The pump couldn't get on full speed |
|
271
|
Thursday, January 14, 2016, 11:48 |
Laura Lambert | | | | Maintenance | Backing Pump Replaced | Thursday, January 14, 2016, 11:47
Backing pump was making very loud
high pitched noises during last couple processes |
|
313
|
Friday, August 12, 2016, 11:08 |
Laura Lambert | | | | Maintenance | NEW PUMP FOR GLOVE BOX | Wednesday, August 03, 2016, 16:16
Tues July 26th had some problems
with the transfer chamber |
|
315
|
Thursday, August 18, 2016, 10:37 |
Anders Mjos | | | | Maintenance | New cooling lines for Heat Shield | Dan made a set of new cooling lines
for the Source Tray Heat Shield cooling yesterday.
No joints on the lines. Use same VCR fitting |
|
342
|
Tuesday, December 20, 2016, 15:04 |
Laura Lambert | | | | Maintenance | RETURN and SUPPLY valves CLOSED for xmas break | Tuesday, December 20, 2016, 15:05
confirmed ~full tank of Ar for glove
box --> ~1600psi |
|
346
|
Thursday, February 09, 2017, 11:49 |
Laura Lambert | | | | Maintenance | New heatshield with flexible water lines | Thursday, February 09, 2017, 11:47
A new heatshield with flexible water
lines has been put into evap2 last Friday |
|